A flexible connector of lifting pipes in a deep sea mining system is designed. The buttress thread ( based on API standard) is used and foreign experience in connector design is referred to. With this kind of connec...A flexible connector of lifting pipes in a deep sea mining system is designed. The buttress thread ( based on API standard) is used and foreign experience in connector design is referred to. With this kind of connector, the lifting pipe wiU only bear the axial force, free of moment. The strength of the connector is analyzed in detail, including the connecting strength of the buttress thread, the dynamic load of the pipe system, pressures inside and outside of the pipe, the lateral stress of the pipe wall and so on. Especially, a geometric model is built for 3-D contact stress analysis. The distribution graph of contact stress is presented. It is indicated that the strength of the spherical connector meets the demand.展开更多
The experiment system of 1000 m deep sea mining system is built up with the similarity theory. Sine mechanism is used to simulate mining ship to generate lateral shock excitation by ocean wave. Simulation and experime...The experiment system of 1000 m deep sea mining system is built up with the similarity theory. Sine mechanism is used to simulate mining ship to generate lateral shock excitation by ocean wave. Simulation and experiment of spherical joint connecting deep sea mining system has been done in band six marine conditions. The results indicate that the moment of spherical joint connecting deep sea mining is smaller than that of the thread connected ones, the lifting pipe of sphelical joint is "flexible pipe". The flexural torque of the articulated lifting pipe system in pump and buffer is generally periodic variation with some irregularity, the value is stable on 60 N·S, and it is obviously smaller than that of the fixed lifting pipe system; The total displacement exhibits cyclic variation pattern, and the periodicity of them is longer than that of sea current. The results of experiment and simulation are basically consistent. And the analysis in the paper offers theoretical foundation of 1000 m deep sea mining system in China.展开更多
The dynamics of the gravitational lifting system of the deep sea mining industry is demonstrated in this article.A simplified dynamic model is obtained when gravity,buoyancy and drag force are the major concerns.By qu...The dynamics of the gravitational lifting system of the deep sea mining industry is demonstrated in this article.A simplified dynamic model is obtained when gravity,buoyancy and drag force are the major concerns.By quantitative analysis,different variables like bucket size,distribution distance,and filling rate are considered to measure their influence on lifting speed and production rate,which ends up with that the most influential factor is the bucket size,and it has a positive correlation with both the two targets:lifting speed and production rate.Due to the breaking strength of the cable wire rope,a feasible design of such a lifting system should take the tension force into consideration.Hence,the feasibility is also examined and a conclusion is summarized that a combination of the bucket size and the distribution distance should be optimized according to the concrete working conditions.展开更多
基金This research was financially supported by China Ocean Mineral Resources R &D Association (Grant No. DY105-03-02-17) .
文摘A flexible connector of lifting pipes in a deep sea mining system is designed. The buttress thread ( based on API standard) is used and foreign experience in connector design is referred to. With this kind of connector, the lifting pipe wiU only bear the axial force, free of moment. The strength of the connector is analyzed in detail, including the connecting strength of the buttress thread, the dynamic load of the pipe system, pressures inside and outside of the pipe, the lateral stress of the pipe wall and so on. Especially, a geometric model is built for 3-D contact stress analysis. The distribution graph of contact stress is presented. It is indicated that the strength of the spherical connector meets the demand.
基金This research was financially supported by China Ocean Mineral Resources Reasearch and Design Association (GrantNo DY105-03-02-17)Ph.D Programs Foundation of Ministry of Education of China (Grant No20060008025)
文摘The experiment system of 1000 m deep sea mining system is built up with the similarity theory. Sine mechanism is used to simulate mining ship to generate lateral shock excitation by ocean wave. Simulation and experiment of spherical joint connecting deep sea mining system has been done in band six marine conditions. The results indicate that the moment of spherical joint connecting deep sea mining is smaller than that of the thread connected ones, the lifting pipe of sphelical joint is "flexible pipe". The flexural torque of the articulated lifting pipe system in pump and buffer is generally periodic variation with some irregularity, the value is stable on 60 N·S, and it is obviously smaller than that of the fixed lifting pipe system; The total displacement exhibits cyclic variation pattern, and the periodicity of them is longer than that of sea current. The results of experiment and simulation are basically consistent. And the analysis in the paper offers theoretical foundation of 1000 m deep sea mining system in China.
文摘The dynamics of the gravitational lifting system of the deep sea mining industry is demonstrated in this article.A simplified dynamic model is obtained when gravity,buoyancy and drag force are the major concerns.By quantitative analysis,different variables like bucket size,distribution distance,and filling rate are considered to measure their influence on lifting speed and production rate,which ends up with that the most influential factor is the bucket size,and it has a positive correlation with both the two targets:lifting speed and production rate.Due to the breaking strength of the cable wire rope,a feasible design of such a lifting system should take the tension force into consideration.Hence,the feasibility is also examined and a conclusion is summarized that a combination of the bucket size and the distribution distance should be optimized according to the concrete working conditions.
文摘为了研究深海采矿水下输送系统提升硬管选型设计的可靠性,以输送指标为设计输入,通过水动力学进行校核,根据多金属结核沉降速度确定提升硬管选用外径244.48 mm的P110钢级抗疲劳螺纹连接套管(壁厚20.24 mm),水池拖曳试验结果表明提升电泵上端硬管阻力系数为1.4,提升电泵下端硬管阻力系数为1.3。对水下输送系统按作业工况和布放工况分别进行水动力学计算,在海试作业环境下提升硬管安全系数满足API RP 2RD规范要求。在深海多金属结核采矿试验工程海上验收试验中,提升硬管满足各项输送指标要求,各接口间连接可靠,验证了提升硬管选型设计的合理性。