A precise aperture measuring system of small deep holes with capacitance sensors is presented. Based on the working principle of non-contact capacitance sensors, influence of the edge effect of gauge head is studied, ...A precise aperture measuring system of small deep holes with capacitance sensors is presented. Based on the working principle of non-contact capacitance sensors, influence of the edge effect of gauge head is studied, and one capacitance sensor for measuring the aperture of the small blind holes or through holes is introduced. The system is composed of one positioning device, one aperture measuring capacitance sensor, one measuring circuit, and software. This system employs visual CCD and two-dimensional mic...展开更多
In the study of the application effectiveness of deep-hole controlled pre-splittingblasting technology,it was found through laboratory micro test and field study on a mine insouth China that under the technology,coal ...In the study of the application effectiveness of deep-hole controlled pre-splittingblasting technology,it was found through laboratory micro test and field study on a mine insouth China that under the technology,coal masses produce many irreversible cracks.Afterblasting,the nearer the distance from blasting hole,the larger the BET surface areaand volume ratio of the infiltration pore are;they increased by 11.47%and 5.73%,respectively.The coefficient of air permeability is increased 4 times.After 3 months,the gasdrainage rate was increased by 66%.In the first 15 days,the cumulative pumped gas was1.93 times of blasting before.The average absolute gas emission decreased by 63.46%.Experimental results show that deep-hole controlled pre-splitting blasting not only preventscoal and gas outburst,but also gives good economic results.展开更多
Created a new damage model for explosive for LS-DYNA3D,taking advantageof the Taylor method aimed at the high gassy and low permeability coal seam,and numericallysimulated and analyzed the deep-hole presplitting explo...Created a new damage model for explosive for LS-DYNA3D,taking advantageof the Taylor method aimed at the high gassy and low permeability coal seam,and numericallysimulated and analyzed the deep-hole presplitting explosion.The entire processof explosion was represented,including cracks caused by dynamic pressure,transmissionand vibration superposition of stress waves,as well as cracks growth driven by gas generatedby explosion.The influence of the cracks generated in the process of explosion andthe performance of improving permeability caused by the difference of interval between.explosive holes were analyzed.A reasonable interval between explosive holes of deepholepresplitting explosions in high gassy and low permeability coal seams was proposed,and the resolution of gas drainage in high gassy and low permeability coal seam was putforward.展开更多
The Xinfengjiang reservoir in Guangdong Province is one of the large reservoirs that have triggered earthquakes of magnitude greater than 6.Numerous earthquakes have occurred since the impoundment of the reservoir,mak...The Xinfengjiang reservoir in Guangdong Province is one of the large reservoirs that have triggered earthquakes of magnitude greater than 6.Numerous earthquakes have occurred since the impoundment of the reservoir,making it one of the most active seismic zones in south China.In 2015,a set of deep-hole resistivity anomalies was observed in the Heping geoelectric station in Dongyuan county,located near the Xinfengjiang reservoir.After a field investigation,we found that a planned well drilling construction of new measuring channels was being carried out during that corresponding period of time.After careful comparison and analysis on the basis of the collected raw data,we had a reason to believe that drilling construction,rather than the inducement of the Xinfengjiang reservoir,was the main culprit for those unusual georesistivity values.So as to verify the above conjecture,we constructed a series of 3D finite element models based on the geological and hydrological infor-mation around Heping station and analyzed the drilling disturbances,respectively.Some significant conclusions were finally drawn according to the precise numerical simulation.This study gives a good example by combining numerical simulation with engineering practice as a way to understand the root cause of georesistivity anomalies in reality.展开更多
Pre?grouting is a popular ground treatment strategy utilized to enhance the strength and stability of strata during the excavation of a tunnel through a fault zone.Two important questions need to be answered during su...Pre?grouting is a popular ground treatment strategy utilized to enhance the strength and stability of strata during the excavation of a tunnel through a fault zone.Two important questions need to be answered during such an excavation.First,how should the grouting size be determined?Second,when should excavation begin after grouting?These two questions are conventionally addressed through empirical experience and standard criteria because a reliable quantitative approach,which would be preferable,has not yet been developed.To address these questions,we apply a recently proposed numerical approach known as discontinuity layout optimization,an efficient node-based upper bound limit analysis method.A case study is provided utilizing a tunnel located in a stratum characterized by complicated geological conditions,including soft soil and a fault zone.The factor of safety is used to quantitatively assess the stability of the tunnel section.The influences of the grouted zone thickness and the time-dependent material properties of the grouted zone on the stability of the tunnel section are evaluated,thereby assisting designers by quantitatively assessing the effects of pre-grouting.展开更多
During shaft constructing, a borehole water inflow of 30 m3/h was encountered in Liu Yuanzi Coal Mine in the southwestern Ordos Basin, whose aquifer is mainly cretaceous. On the basis of regional hydrogeological condi...During shaft constructing, a borehole water inflow of 30 m3/h was encountered in Liu Yuanzi Coal Mine in the southwestern Ordos Basin, whose aquifer is mainly cretaceous. On the basis of regional hydrogeological conditions, a mercury intrusion method and scanning electron microscope were used in this study. We conclude that the loose, porous and easily collapsible clay particles of the cretaceous aquifer rock mass were the major geological cause for water hazards during the construction of the shaft. We propose an approach of chemical grouting from the working surface and in the end succeeded in blocking the water.展开更多
Pre-grouting ahead of tunnels has three main functions:to control water inflow into the tunnel,to limit groundwater drawdown above the tunnel,and to make tunnelling progress more predictable since rock mass quality is...Pre-grouting ahead of tunnels has three main functions:to control water inflow into the tunnel,to limit groundwater drawdown above the tunnel,and to make tunnelling progress more predictable since rock mass quality is effectively improved.It helps to avoid settlement damage caused by consolidation of clay deposits beneath built-up areas,since towns tend to be built where terrain is more flat,due to the clay deposits.There are so many instances of settlement damage that the profession needs to take note of the need for high-pressure pre-grouting,to use micro-cements and micro-silica additives.The use of highpressure injection may cause joint jacking,but this is local in extent when the rapid pressure decay away from an injection hole is understood.This effect is variable and depends on the geometrical parameters of the joints.This pressure-decay advantage must not be violated by maintaining high pressure when grout flow from the injection hole has ceased.The latter can cause damage to the grouting already achieved.Simplified methods of estimating mean hydraulic apertures(e)from Lugeon testing are described,and from more sophisticated three-dimensional(3D)permeability measurement.The estimation of the larger mean physical joint apertures(E)is based on the joint roughness coefficient(JRC).Comparison is then made with the empirical aperture-particle size criterion E>4d95,where d95 represents almost the largest cement particle size.Depending on joint set orientations and on the available micro-cements,the decision must be made of which range of pre-injection pressure should be aimed for,using successive reductions of the water-cement ratio w/c.More simple estimation of permeability,also with depth dependence,can be made with the empirical link between a modified rock mass quality Q and permeability,which is termed QH2O.The value of this parameter can be based on core-logging or intunnel face logging.The 3D before-and-after-grouting permeability measurements have been used to justify the quantification of rock mass quality Q-parameter improvement,and the consequent increases in expected P-wave velocity and deformation modulus,for application in dam foundation treatment and its monitoring.展开更多
A laser technique based scanning system was employed to make a comprehensive scanning through borehole forunmapped cavity under open pit bench,then the three-dimensional data will be obtained,and these data were used ...A laser technique based scanning system was employed to make a comprehensive scanning through borehole forunmapped cavity under open pit bench,then the three-dimensional data will be obtained,and these data were used for theoreticalanalysis and numerical simulation to analyze the stability of cap rock.Acoustic emission techniques were also adopted to carry outlong term real time rupture monitoring in cap rock.Therefore,a complete safety evaluation system for the cap rock was establishedto ensure safe operation of subsequent blasting processes.The ideal way of eliminating collapse hazard of such cavity is cap rockcaving through deep-hole blasting,thus,two deep-hole blasting schemes named as vertical deep-hole blasting scheme and one-timeraise driving integrated with deep-hole bench blasting scheme were proposed.The vertical deep-hole blasting scheme has moreexplosive consumption,but the relatively simple blasting net work structure can greatly reduce workloads.However,the one-timeraise driving integrated with deep-hole bench blasting scheme can obviously reduce explosive consumption,but the higher technicalrequirements on drilling,explosive charging and blasting network will increase workloads.展开更多
文摘A precise aperture measuring system of small deep holes with capacitance sensors is presented. Based on the working principle of non-contact capacitance sensors, influence of the edge effect of gauge head is studied, and one capacitance sensor for measuring the aperture of the small blind holes or through holes is introduced. The system is composed of one positioning device, one aperture measuring capacitance sensor, one measuring circuit, and software. This system employs visual CCD and two-dimensional mic...
基金Supported by Project from National Natural Science Foundation of China(50674111)the National key Technology R&D Program in 10th Five Years Plan of China
文摘In the study of the application effectiveness of deep-hole controlled pre-splittingblasting technology,it was found through laboratory micro test and field study on a mine insouth China that under the technology,coal masses produce many irreversible cracks.Afterblasting,the nearer the distance from blasting hole,the larger the BET surface areaand volume ratio of the infiltration pore are;they increased by 11.47%and 5.73%,respectively.The coefficient of air permeability is increased 4 times.After 3 months,the gasdrainage rate was increased by 66%.In the first 15 days,the cumulative pumped gas was1.93 times of blasting before.The average absolute gas emission decreased by 63.46%.Experimental results show that deep-hole controlled pre-splitting blasting not only preventscoal and gas outburst,but also gives good economic results.
基金Supported by the National Science Foundation of China(50534090,2007BAK28B01,2007BAK29B06)the Science Foundation of Anhui Province(050440403)Creative Team Plan for High School of Anhui(2006KJ005TD)
文摘Created a new damage model for explosive for LS-DYNA3D,taking advantageof the Taylor method aimed at the high gassy and low permeability coal seam,and numericallysimulated and analyzed the deep-hole presplitting explosion.The entire processof explosion was represented,including cracks caused by dynamic pressure,transmissionand vibration superposition of stress waves,as well as cracks growth driven by gas generatedby explosion.The influence of the cracks generated in the process of explosion andthe performance of improving permeability caused by the difference of interval between.explosive holes were analyzed.A reasonable interval between explosive holes of deepholepresplitting explosions in high gassy and low permeability coal seams was proposed,and the resolution of gas drainage in high gassy and low permeability coal seam was putforward.
基金Innovation Group Project of Southern Marine Science and Engineering Guangdong Laboratory(Zhuhai)(No.311021002).
文摘The Xinfengjiang reservoir in Guangdong Province is one of the large reservoirs that have triggered earthquakes of magnitude greater than 6.Numerous earthquakes have occurred since the impoundment of the reservoir,making it one of the most active seismic zones in south China.In 2015,a set of deep-hole resistivity anomalies was observed in the Heping geoelectric station in Dongyuan county,located near the Xinfengjiang reservoir.After a field investigation,we found that a planned well drilling construction of new measuring channels was being carried out during that corresponding period of time.After careful comparison and analysis on the basis of the collected raw data,we had a reason to believe that drilling construction,rather than the inducement of the Xinfengjiang reservoir,was the main culprit for those unusual georesistivity values.So as to verify the above conjecture,we constructed a series of 3D finite element models based on the geological and hydrological infor-mation around Heping station and analyzed the drilling disturbances,respectively.Some significant conclusions were finally drawn according to the precise numerical simulation.This study gives a good example by combining numerical simulation with engineering practice as a way to understand the root cause of georesistivity anomalies in reality.
基金financial support by the National Natural Science Foundation of China(Grant No.51809069)the Hebei Province Natural Science Fund(No.E2019202441).
文摘Pre?grouting is a popular ground treatment strategy utilized to enhance the strength and stability of strata during the excavation of a tunnel through a fault zone.Two important questions need to be answered during such an excavation.First,how should the grouting size be determined?Second,when should excavation begin after grouting?These two questions are conventionally addressed through empirical experience and standard criteria because a reliable quantitative approach,which would be preferable,has not yet been developed.To address these questions,we apply a recently proposed numerical approach known as discontinuity layout optimization,an efficient node-based upper bound limit analysis method.A case study is provided utilizing a tunnel located in a stratum characterized by complicated geological conditions,including soft soil and a fault zone.The factor of safety is used to quantitatively assess the stability of the tunnel section.The influences of the grouted zone thickness and the time-dependent material properties of the grouted zone on the stability of the tunnel section are evaluated,thereby assisting designers by quantitatively assessing the effects of pre-grouting.
基金Financial support from the National Natural Science Foundation of China (No.40772191)
文摘During shaft constructing, a borehole water inflow of 30 m3/h was encountered in Liu Yuanzi Coal Mine in the southwestern Ordos Basin, whose aquifer is mainly cretaceous. On the basis of regional hydrogeological conditions, a mercury intrusion method and scanning electron microscope were used in this study. We conclude that the loose, porous and easily collapsible clay particles of the cretaceous aquifer rock mass were the major geological cause for water hazards during the construction of the shaft. We propose an approach of chemical grouting from the working surface and in the end succeeded in blocking the water.
文摘Pre-grouting ahead of tunnels has three main functions:to control water inflow into the tunnel,to limit groundwater drawdown above the tunnel,and to make tunnelling progress more predictable since rock mass quality is effectively improved.It helps to avoid settlement damage caused by consolidation of clay deposits beneath built-up areas,since towns tend to be built where terrain is more flat,due to the clay deposits.There are so many instances of settlement damage that the profession needs to take note of the need for high-pressure pre-grouting,to use micro-cements and micro-silica additives.The use of highpressure injection may cause joint jacking,but this is local in extent when the rapid pressure decay away from an injection hole is understood.This effect is variable and depends on the geometrical parameters of the joints.This pressure-decay advantage must not be violated by maintaining high pressure when grout flow from the injection hole has ceased.The latter can cause damage to the grouting already achieved.Simplified methods of estimating mean hydraulic apertures(e)from Lugeon testing are described,and from more sophisticated three-dimensional(3D)permeability measurement.The estimation of the larger mean physical joint apertures(E)is based on the joint roughness coefficient(JRC).Comparison is then made with the empirical aperture-particle size criterion E>4d95,where d95 represents almost the largest cement particle size.Depending on joint set orientations and on the available micro-cements,the decision must be made of which range of pre-injection pressure should be aimed for,using successive reductions of the water-cement ratio w/c.More simple estimation of permeability,also with depth dependence,can be made with the empirical link between a modified rock mass quality Q and permeability,which is termed QH2O.The value of this parameter can be based on core-logging or intunnel face logging.The 3D before-and-after-grouting permeability measurements have been used to justify the quantification of rock mass quality Q-parameter improvement,and the consequent increases in expected P-wave velocity and deformation modulus,for application in dam foundation treatment and its monitoring.
基金Projects(51204206,41272304,41372278) supported by the National Natural Science Foundation of China
文摘A laser technique based scanning system was employed to make a comprehensive scanning through borehole forunmapped cavity under open pit bench,then the three-dimensional data will be obtained,and these data were used for theoreticalanalysis and numerical simulation to analyze the stability of cap rock.Acoustic emission techniques were also adopted to carry outlong term real time rupture monitoring in cap rock.Therefore,a complete safety evaluation system for the cap rock was establishedto ensure safe operation of subsequent blasting processes.The ideal way of eliminating collapse hazard of such cavity is cap rockcaving through deep-hole blasting,thus,two deep-hole blasting schemes named as vertical deep-hole blasting scheme and one-timeraise driving integrated with deep-hole bench blasting scheme were proposed.The vertical deep-hole blasting scheme has moreexplosive consumption,but the relatively simple blasting net work structure can greatly reduce workloads.However,the one-timeraise driving integrated with deep-hole bench blasting scheme can obviously reduce explosive consumption,but the higher technicalrequirements on drilling,explosive charging and blasting network will increase workloads.