期刊文献+
共找到5,690篇文章
< 1 2 250 >
每页显示 20 50 100
The Application of Intelligent Lighting in Thermal Power Plants
1
作者 Xiaozhong Kang Shuangqiang Liu +1 位作者 Guoqing Hu Haibin Huang 《Journal of Electronic Research and Application》 2024年第4期180-185,共6页
With the rapid development of electronic information technology,the Internet of Things(IoT),Internet technology,and modern communication technology,people are demanding higher standards for the building environment.Es... With the rapid development of electronic information technology,the Internet of Things(IoT),Internet technology,and modern communication technology,people are demanding higher standards for the building environment.Especially in modern large-scale buildings with high levels of industrialization,lighting systems should also be optimized accordingly.This article explores the application path of intelligent lighting in thermal power plants for reference. 展开更多
关键词 Intelligent lighting thermal power plants Application path
下载PDF
Exploration of Construction Organization for Maintenance of Steam Turbine Equipment in Thermal Power Plants
2
作者 Zhu Yang 《Journal of Electronic Research and Application》 2024年第4期148-153,共6页
The continuous development of the power industry has had a positive impact on thermal power plants,helping them maintain a good production form.In the use of steam turbine equipment in thermal power plants,to prolong ... The continuous development of the power industry has had a positive impact on thermal power plants,helping them maintain a good production form.In the use of steam turbine equipment in thermal power plants,to prolong its lifespan and avoid safety hazards,it is necessary to pay attention to strengthening maintenance and construction organization,better implementing effective organizational work,and effectively applying steam turbine equipment to ensure the sustainable development of thermal power plants.This article discusses the concept of equipment maintenance from the perspective of steam turbine equipment in thermal power plants,analyzes the current situation of equipment maintenance,and proposes a specific construction organization to provide a reference for steam turbine equipment maintenance. 展开更多
关键词 thermal power plant Steam turbine equipment Construction organization
下载PDF
Increasing the Efficiency and Level of Environmental Safety of Pro-Environmental City Heat Supply Technologies by Low Power Nuclear Plants
3
作者 Vladimir Kravchenko Igor Kozlov +3 位作者 Volodymyr Vashchenko Iryna Korduba Andrew Overchenko Serhii Tsybytovskyi 《World Journal of Nuclear Science and Technology》 CAS 2024年第2期107-117,共11页
In connection with the current prospect of decarbonization of coal energy through the use of small nuclear power plants (SNPPs) at existing TPPs as heat sources for heat supply to municipal heating networks, there is ... In connection with the current prospect of decarbonization of coal energy through the use of small nuclear power plants (SNPPs) at existing TPPs as heat sources for heat supply to municipal heating networks, there is a technological need to improve heat supply schemes to increase their environmental friendliness and efficiency. The paper proves the feasibility of using the heat-feeding mode of ASHPs for urban heat supply by heating the network water with steam taken from the turbine. The ratio of electric and thermal power of a “nuclear” combined heat and power plant is given. The advantage of using a heat pump, which provides twice as much electrical power with the same heat output, is established. Taking into account that heat in these modes is supplied with different potential, the energy efficiency was used to compare these options. To increase the heat supply capacity, a scheme with the use of a high-pressure heater in the backpressure mode and with the heating of network water with hot steam was proposed. Heat supply from ASHPs is efficient and environmentally friendly even in the case of significant remoteness of heat consumers. 展开更多
关键词 Low-Capacity Nuclear power plants Environmental Friendliness of the thermal power Generation Mode Heat Generation Condensation Mode Heat Supply
下载PDF
Economic Overhaul Mode of Steam Engine Professional Equipment in Thermal Power Plant
4
作者 Rui Wang 《Journal of Electronic Research and Application》 2024年第5期46-51,共6页
To ensure that the daily production activities of thermal power plants can produce their due effect in the production and business activities,it is necessary to carry out efficient and orderly maintenance work on the ... To ensure that the daily production activities of thermal power plants can produce their due effect in the production and business activities,it is necessary to carry out efficient and orderly maintenance work on the professional equipment of steam engines.However,the maintenance work of steam engine professional equipment in thermal power plants usually uses high-cost expenditures.Therefore,how to take effective measures to reduce the cost of professional equipment maintenance in thermal power plants has become a problem that needs to be solved before such maintenance can proceed.Among them,through the application of economic maintenance equipment in thermal power plants,the actual production and operation costs can be effectively reduced.Based on this,the author will analyze the application of the model of economic maintenance of steam engine professional equipment in thermal power plants. 展开更多
关键词 thermal power plant Turbine professional equipment maintenance Economic maintenance mode
下载PDF
Evaporative Cooling Applied in Thermal Power Plants:A Review of the State-ofthe-Art and Typical Case Studies 被引量:1
5
作者 Tiantian Liu Huimin Pang +7 位作者 Suoying He Bin Zhao Zhiyu Zhang Jucheng Wang Zhilan Liu Xiang Huang Yuetao Shi Ming Gao 《Fluid Dynamics & Materials Processing》 EI 2023年第9期2229-2265,共37页
A review is conducted about the application of the evaporative cooling technology in thermal power plants.Different case studies are considered,namely,evaporative air conditioners,evaporative cooling in direct air-coo... A review is conducted about the application of the evaporative cooling technology in thermal power plants.Different case studies are considered,namely,evaporative air conditioners,evaporative cooling in direct air-cooled systems,gas turbine inlet cooling,wet cooling towers,and hybrid cooling towers with a crosswind effect.Some effort is provided to describe the advantages related to direct evaporative cooling when it is applied in thermal power plants and illustrate the research gaps,which have not been filled yet.In particular,typical case studies are intentionally used to compare the cooling performances when direct evaporative cooling is implemented in different types of cooling towers,including the natural draft wet cooling tower(NDWCT)and the pre-cooled natural draft dry cooling tower(NDDCT).It is shown that the NDWCT provides the best cooling performance in terms of power station cooling,followed by the pre-cooled NDDCT,and the NDDCT;moreover,the evaporative pre-cooling is able to enhance the cooling performance of NDDCT.Besides,on a yearly basis,better NDDCT cooling performances can be obtained by means of a spray-based pre-cooling approach with respect to wet media pre-cooling.Therefore,the use of nozzle spray is suggested for improvement in the performance of indirect/direct air-cooling systems with controlled water consumption. 展开更多
关键词 Direct evaporative cooling cooling tower cooling performance wet media nozzle spray thermal power plants
下载PDF
Research on the Architecture of Computer Integrated Production System in Thermal Power Plant (TPP-CIPS)
6
作者 许继刚 郑慧莉 张金隆 《Electricity》 2001年第4期36-39,共4页
This paper presents an architecture of Computer Integrated Production System in Thermal Power Plant(TPP-CIPS). This architecture is a successful model with a three-dimensional space based on hierarchial dimension,view... This paper presents an architecture of Computer Integrated Production System in Thermal Power Plant(TPP-CIPS). This architecture is a successful model with a three-dimensional space based on hierarchial dimension,view dimension and life period dimension. Hierarchial view includes Management Information System (MIS), SupervisoryInformation System (SIS) and process automation systems such as Distributed Control System (DCS). View dimensionincludes function view, resource view, organization view and information view. Life period view includes system analyses,system design, system implementation, operation maintenance and system optimization.[ 展开更多
关键词 thermal power plant CIMS TPP-CIPS architecture model
下载PDF
Output power analyses for the thermodynamic cycles of thermal power plants 被引量:2
7
作者 孙晨 程雪涛 梁新刚 《Chinese Physics B》 SCIE EI CAS CSCD 2014年第5期208-215,共8页
Thermal power plant is one of the important thermodynamic devices, which is very common in all kinds of power generation systems. In this paper, we use a new concept, entransy loss, as well as exergy destruction, to a... Thermal power plant is one of the important thermodynamic devices, which is very common in all kinds of power generation systems. In this paper, we use a new concept, entransy loss, as well as exergy destruction, to analyze the single reheating Rankine cycle unit and the single stage steam extraction regenerative Rankine cycle unit in power plants. This is the first time that the concept of entransy loss is applied to the analysis of the power plant Rankine cycles with reheating and steam extraction regeneration. In order to obtain the maximum output power, the operating conditions under variant vapor mass flow rates are optimized numerically, as well as the combustion temperatures and the off-design flow rates of the flue gas. The relationship between the output power and the exergy destruction rate and that between the output power and the entransy loss rate are discussed. It is found that both the minimum exergy destruction rate and the maximum entransy loss rate lead to the maximum output power when the combustion temperature and heat capacity flow rate of the flue gas are prescribed. Unlike the minimum exergy destruction rate, the maximum entransy loss rate is related to the maximum output power when the highest temperature and heat capacity flow rate of the flue gas are not prescribed. 展开更多
关键词 thermal power plants Rankine circle exergy destruction entransy loss
下载PDF
Independent component analysis approach for fault diagnosis of condenser system in thermal power plant 被引量:6
8
作者 Ajami Ali Daneshvar Mahdi 《Journal of Central South University》 SCIE EI CAS 2014年第1期242-251,共10页
A statistical signal processing technique was proposed and verified as independent component analysis(ICA) for fault detection and diagnosis of industrial systems without exact and detailed model.Actually,the aim is t... A statistical signal processing technique was proposed and verified as independent component analysis(ICA) for fault detection and diagnosis of industrial systems without exact and detailed model.Actually,the aim is to utilize system as a black box.The system studied is condenser system of one of MAPNA's power plants.At first,principal component analysis(PCA) approach was applied to reduce the dimensionality of the real acquired data set and to identify the essential and useful ones.Then,the fault sources were diagnosed by ICA technique.The results show that ICA approach is valid and effective for faults detection and diagnosis even in noisy states,and it can distinguish main factors of abnormality among many diverse parts of a power plant's condenser system.This selectivity problem is left unsolved in many plants,because the main factors often become unnoticed by fault expansion through other parts of the plants. 展开更多
关键词 CONDENSER fault detection and diagnosis independent component analysis independent component analysis (ICA) principal component analysis (PCA) thermal power plant
下载PDF
Mid-long Term Optimal Dispatching Method of Hydro-thermal Power System Considering Scheduled Maintenance 被引量:11
9
作者 GE Xiaolin SHU Jun ZHANG Lizi 《中国电机工程学报》 EI CSCD 北大核心 2012年第13期I0006-I0006,189,共1页
在中长期水火发电调度中考虑检修计划的影响是目前中长期水火发电调度面临的难题。利用现代整数代数建模技术,建立发电计划和检修计划协调优化的多场景调度模型。在该模型中,鉴于设备检修计划的连续性,在预测场景树的基础上,将场景... 在中长期水火发电调度中考虑检修计划的影响是目前中长期水火发电调度面临的难题。利用现代整数代数建模技术,建立发电计划和检修计划协调优化的多场景调度模型。在该模型中,鉴于设备检修计划的连续性,在预测场景树的基础上,将场景节点划分成不同的场景,通过节点和场景关联矩阵,实现多场景下设备检修模型的构建。同时,鉴于中长期调度计划中发电计划和检修计划对时段间隔要求的不同,分别设置电量相关节点和电力相关节点,实现中长期发电计划和检修计划的协调。上述模型是一个大规模混合整数线性规划(mixed integer linear programming,MILP)问题,采用商用MILP求解器进行求解。大规模实际水火电系统的实例分析结果表明,所提模型和方法是可行、有效的。 展开更多
关键词 长期优化调度 定期维护 发电系统 水热 电热 能源平衡 建模方法 场景模型
下载PDF
A Feature Weighted Mixed Naive Bayes Model for Monitoring Anomalies in the Fan System of a Thermal Power Plant 被引量:1
10
作者 Min Wang Li Sheng +1 位作者 Donghua Zhou Maoyin Chen 《IEEE/CAA Journal of Automatica Sinica》 SCIE EI CSCD 2022年第4期719-727,共9页
With the increasing intelligence and integration,a great number of two-valued variables(generally stored in the form of 0 or 1)often exist in large-scale industrial processes.However,these variables cannot be effectiv... With the increasing intelligence and integration,a great number of two-valued variables(generally stored in the form of 0 or 1)often exist in large-scale industrial processes.However,these variables cannot be effectively handled by traditional monitoring methods such as linear discriminant analysis(LDA),principal component analysis(PCA)and partial least square(PLS)analysis.Recently,a mixed hidden naive Bayesian model(MHNBM)is developed for the first time to utilize both two-valued and continuous variables for abnormality monitoring.Although the MHNBM is effective,it still has some shortcomings that need to be improved.For the MHNBM,the variables with greater correlation to other variables have greater weights,which can not guarantee greater weights are assigned to the more discriminating variables.In addition,the conditional P(x j|x j′,y=k)probability must be computed based on historical data.When the training data is scarce,the conditional probability between continuous variables tends to be uniformly distributed,which affects the performance of MHNBM.Here a novel feature weighted mixed naive Bayes model(FWMNBM)is developed to overcome the above shortcomings.For the FWMNBM,the variables that are more correlated to the class have greater weights,which makes the more discriminating variables contribute more to the model.At the same time,FWMNBM does not have to calculate the conditional probability between variables,thus it is less restricted by the number of training data samples.Compared with the MHNBM,the FWMNBM has better performance,and its effectiveness is validated through numerical cases of a simulation example and a practical case of the Zhoushan thermal power plant(ZTPP),China. 展开更多
关键词 Abnormality monitoring continuous variables feature weighted mixed naive Bayes model(FWMNBM) two-valued variables thermal power plant
下载PDF
FGD Capacity Prediction of Thermal Power Plants in China 被引量:1
11
作者 ZhuFahua WangSheng 《Electricity》 2005年第1期43-47,共5页
Through analyzing the proportion of SO2 emission from thermal power plants in the nationwide SO2 emis- sion in USA, Japan etc. developed countries, and the developmental course of thermal power installed capacity and ... Through analyzing the proportion of SO2 emission from thermal power plants in the nationwide SO2 emis- sion in USA, Japan etc. developed countries, and the developmental course of thermal power installed capacity and the FGD capacity in USA, the FGD capacity of thermal power plants in China is forecasted from two angles. One is to predict FGD capacity in accordance with the policy in force in China. The other is to predict FGD capacity based upon the emission right trading policy. As compared, it is held that FGD equipment should be mainly installed on the large size units burning high sulfur coal according to the emission right trading policy. Such a method of work not only can economize large amount of investments and operation costs, but also can realize the same environmental effect. 展开更多
关键词 thermal power plant flue gas desulfurization FGD capacity emission right trading
下载PDF
Getting and X-ray Diffraction Analysis of the Microsphere Catalyst U, Nd on the Basis Fly Ash of Thermal Power Plants
12
作者 Aibassov Erkln Zhakenovlch Yemelyanova Valentina Stepanovna Shakieva Tatyana Vladimirovna Tussupbaev Nessipbay Kuandykovich Blagikh Evgeniy 《Journal of Chemistry and Chemical Engineering》 2014年第5期544-546,共3页
To study the physical and chemical properties of aluminosilicate microsphere catalyst by impregnation and calcination us was first obtained aluminosilicate microsphere catalyst U, Nd for petrochemical processes. The m... To study the physical and chemical properties of aluminosilicate microsphere catalyst by impregnation and calcination us was first obtained aluminosilicate microsphere catalyst U, Nd for petrochemical processes. The method of X-ray structure has been studied for the microsphere catalyst U, Nd. 展开更多
关键词 thermal power plant ash aluminosilicate microspheres catalyst U ND X-ray analysis.
下载PDF
Application of Combined Cycle in Modernized Retrofit of Old Thermal Power Plants
13
作者 Jia Nansong Liu Dongyuan Longyuan Electric Power Group Corporation 《Electricity》 2000年第2期37-41,共5页
This article expounds the advantages and three schemes of applying combined cycle to the modernized retrofit of old thermal power plants. Through analyzing and comparing technical economics of these three schemes, it ... This article expounds the advantages and three schemes of applying combined cycle to the modernized retrofit of old thermal power plants. Through analyzing and comparing technical economics of these three schemes, it is concluded that to use feedwater heating and heat recovery steam generator (HRSG) is suitable for the units with unit capacity below 100 MW, while to use exhaust gas reburning is suitable for units with unit capacity of 125 MW, 200 MW and above. 展开更多
关键词 combined CYCLE RETRofIT of OLD thermal power plants analysis of TECHNICAL ECONOMY
下载PDF
A Theoretical Investigation of Efficiency Enhancement in Thermal Power Plants
14
作者 Venkata Seshendra Kumar Karri 《Modern Mechanical Engineering》 2012年第3期106-113,共8页
The need to operate a boiler efficiently in today’s environment is at the top of many plant owners and operators lists. Unfortunately, operating a boiler efficiently and meeting local emission regulations do not alwa... The need to operate a boiler efficiently in today’s environment is at the top of many plant owners and operators lists. Unfortunately, operating a boiler efficiently and meeting local emission regulations do not always go hand in hand. However, advances in boiler system design and technology have made this a much more achievable task. The potential for energy improvements and cost savings is substantial when considered that most boilers operating today are performing at efficiencies that are less than 70 percent. The performance calculation and rectification measures are essential for performance evaluation and efficiency enhancement. Since the efficiency decreases from time to time it is required to find out the losses occurring in boiler using proper methodology. The environmental issues and economy are the secondary factors to be considered after finding the losses. Due to increase in fuel price and demand in more energy requirement in everyday life, proper utilization of materials and resources are necessary. This present deals with the aim of estimating the heat losses occurring in thermal power plant boilers and hence finding suitable ways for reducing it, hence allowing plants to achieve more performance, sustainability and cost-effective maintenance operation of a steam system. 展开更多
关键词 thermal power Plant power Enhancement FLUE GAS DESULPHURIZATION Direct METHOD Indirect METHOD FLUE GAS LOSS
下载PDF
FGD Franchising Pilot Project of Thermal Power Plants
15
作者 Wang Zhixuan,Pan Li and Zhang Jingyi China Electricity Council Wang Ying 《Electricity》 2009年第4期41-47,共7页
According to the national policy on enhancing environmental protection,the five major power generation companies are required to carry out flue gas desulphurization(FGD) franchising pilot project in thermal power plan... According to the national policy on enhancing environmental protection,the five major power generation companies are required to carry out flue gas desulphurization(FGD) franchising pilot project in thermal power plants.This paper introduces the development of this pilot project,including the foundation,purpose,objects,demands and procedures.It also discusses some main problems encountered during implementation,involving the understanding,legislation,financing,taxation,pricing and management of franchise.At the end,it puts forward some suggestions and countermeasures with regard to laws,regulations,taxation policy and electricity pricing policy. 展开更多
关键词 FGD Franchising Pilot Project of thermal power plants PROJECT
下载PDF
Difficulties and Solutions for Desulphurization of Thermal Power Plants in China
16
作者 Yu Laifu Liaoning Electric Power Industry Association Wang Ningling 《Electricity》 2008年第1期46-48,共3页
As coal is the most important primary energy in China, SO2 , the main pollutant of coal-fired power plantsseriously pollutes the environment in the course of energy utilization and conversion. Flue gas desulphurizatio... As coal is the most important primary energy in China, SO2 , the main pollutant of coal-fired power plantsseriously pollutes the environment in the course of energy utilization and conversion. Flue gas desulphurization is inevitable in China, however, it is rather difficult to reach the stipulated standards without any compulsory administrative measures of the government. What are the exact difficulties and solutions for the desulphurization in power plants? 展开更多
关键词 FGD Difficulties and Solutions for Desulphurization of thermal power plants in China
下载PDF
ISSUES AND SUGGESTIONS ON LEVYING SO_2 EMISSION GHARGES TO THERMAL POWER PLANTS
17
作者 王志轩 《Electricity》 2002年第4期3-6,共4页
This paper analyzes 9 essentials in trial collecting SO2 emission charges based on the relevant legislative policies, summarizes and analyzes the actual practices of collecting and using SO2 emission charges in power ... This paper analyzes 9 essentials in trial collecting SO2 emission charges based on the relevant legislative policies, summarizes and analyzes the actual practices of collecting and using SO2 emission charges in power industry, and combining the status of power system reform, puts forward some recommendations about reasonably collecting and using SO2 emission charges and prompting power plants to take measures of desulfurization. 展开更多
关键词 thermal power plant SO2 control emission charges POLICY
下载PDF
Distribution of bromine and iodine in thermal power plant 被引量:2
18
作者 Bing-Xian PENG Lan LI Dai-She WU 《Journal of Coal Science & Engineering(China)》 2013年第3期387-391,共5页
The bromine (Br) and iodine (I) in raw coal, bottom ash (BA) and fly ash (FA) from seven thermal power plants (TPP) digested with pyrohydrolysis were determined by using inductively coupled plasma mass spect... The bromine (Br) and iodine (I) in raw coal, bottom ash (BA) and fly ash (FA) from seven thermal power plants (TPP) digested with pyrohydrolysis were determined by using inductively coupled plasma mass spectrometry (ICP-MS). The distribution behavior of Br and I during coal combustion were researched and the environmental effects of Br and I in BA, FA and gas phase were analyzed. The results show that both elements Br and I in combustion products from TPP are usually pre- sent in decreasing order of the distribution rate as gas phase, FA and BA. In FA and BA, the distribution rate of Br (8.11% and 1.68%, respectively) are generally lower than that of I (9.26% and 4.67%, respectively); on the contrary, in gas phase, the former (90.2%) is higher than the latter (86.9%). In addition, for gas phase, the percentage of Br: (2.0%-75%) in total Br is generally larger than that of I2 (1.0%-10%) in total I. The environmental effects for Br and I emitted into atmosphere from TPP may be larger than those remained and captured by both FA and BA. 展开更多
关键词 thermal power plant BROMINE IODINE DISTRIBUTION
下载PDF
Flow Characteristics Diagnosis and Optimization for Dust Collectors Inflow Duct in Thermal Power Plants 被引量:22
19
作者 LIU Ming MENG Guixiang +4 位作者 YAN Junjie CHEN Weixiong LI Weidong CHONG Daotong LIU Jiping 《中国电机工程学报》 EI CSCD 北大核心 2013年第11期I0001-I0001,共1页
火电厂烟风道用于输送烟气、冷风等介质,其设计优化水平不但影响火电厂烟风系统阻力的大小,而且影响与烟风道直接相连的各个设备的运行状态。某600MW机组除尘器前烟道设计不合理,存在磨损严重、进入除尘器烟气分配不均等问题,文中... 火电厂烟风道用于输送烟气、冷风等介质,其设计优化水平不但影响火电厂烟风系统阻力的大小,而且影响与烟风道直接相连的各个设备的运行状态。某600MW机组除尘器前烟道设计不合理,存在磨损严重、进入除尘器烟气分配不均等问题,文中采用标准缸£模型,利用Fluent求解器对该部分烟道的流场进行数值计算,诊断分析其存在的主要问题,提出的3个改造方案均可使烟道阻力大幅度下降、烟道磨损减轻、进入除尘器烟气分配均匀。同时,研究了缓转半径及烟气流速对该段烟道阻力和烟气分配的影响情况,计算结果表明该段烟道缓转半径宜选在0.875以上,烟气流速对该段烟道的性能基本没有影响。 展开更多
关键词 火电厂 流量特性 集尘 优化 诊断 能源消费 氮氧化物 二氧化硫
下载PDF
Model and Design of Cogeneration System for Different Demands of Desalination Water, Heat and Power Production 被引量:1
20
作者 吴现力 胡仰栋 +1 位作者 伍联营 李红 《Chinese Journal of Chemical Engineering》 SCIE EI CAS CSCD 2014年第3期330-338,共9页
In order to improve the energy efficiency, reduce the CO2 emission and decrease the cost, a cogenera- tion system for desalination water, heat and power production was studied in this paper. The superstructure of the ... In order to improve the energy efficiency, reduce the CO2 emission and decrease the cost, a cogenera- tion system for desalination water, heat and power production was studied in this paper. The superstructure of the cogeneration system consisted of a coal-based thermal power plant (TPP), a multi-stage flash desalination (MSF) module and reverse osmosis desalination (RO) module. For different demands of water, heat and power production, the corresponding optimal production structure was different. After reasonable simplification, the process model ot each unit was built. The economical model, including the unit investment, and operation and maintenance cost, was presented. By solving this non-linear programming (NLP) model, whose objective is to minimize the annual cost, an optimal cogeneration system can be obtained. Compared to separate production systems, the optimal system can reduce 16.1%-21.7% of the total annual cost. showing this design method was effective. 展开更多
关键词 cogeneration system thermal power plant multi-stage flash desalination reverse osmosis desalination non-linear programming optimal design
下载PDF
上一页 1 2 250 下一页 到第
使用帮助 返回顶部