A series of single hole blasting crater experiments and a variable distance multi-hole simultaneous blasting experiment was carried in the Yunfu Troilite Mine,according to the Livingston blasting crater theory.We intr...A series of single hole blasting crater experiments and a variable distance multi-hole simultaneous blasting experiment was carried in the Yunfu Troilite Mine,according to the Livingston blasting crater theory.We introduce in detail,our methodology of data collection and processing from our experiments.Based on the burying depth of the explosives,the blasting crater volume was fitted by the method of least squares and the characteristic curve of the blasting crater was obtained using the MATLAB soft- ware.From this third degree polynomial,we have derived the optimal burying depth,the critical burying depth and the optimal explosive specific charge of the blasting crater.展开更多
Battery energy storage systems(BESSs)can provide instantaneous support for frequency regulation(FR)because of their fast response characteristics.However,purely pursuing a better FR effect calls for continually rapid ...Battery energy storage systems(BESSs)can provide instantaneous support for frequency regulation(FR)because of their fast response characteristics.However,purely pursuing a better FR effect calls for continually rapid cycles of BESSs,which shortens their lifetime and deteriorates the operational economy.To coordinate the lifespan savings and the FR effect,this paper presents a control strategy for the FR of BESSs based on fuzzy logic and hierarchical controllers.The fuzzy logic controller improves the effect of FR by adjusting the charging/discharging power of the BESS with a higher response speed and precision based on the area control error(ACE)signal and the change rate of ACE in a non-linear way.Hierarchical controllers effectively reduce the life loss by optimizing the depth of discharge,which ensures that the state of charge(SOC)of BESS is always in the optimal operating range,and the total FR cost is the lowest at this time.The proposed method can achieve the optimal balance between ACE reduction and operational economy of BESS.The effectiveness of the proposed strategy is verified in a two-area power system.展开更多
文摘A series of single hole blasting crater experiments and a variable distance multi-hole simultaneous blasting experiment was carried in the Yunfu Troilite Mine,according to the Livingston blasting crater theory.We introduce in detail,our methodology of data collection and processing from our experiments.Based on the burying depth of the explosives,the blasting crater volume was fitted by the method of least squares and the characteristic curve of the blasting crater was obtained using the MATLAB soft- ware.From this third degree polynomial,we have derived the optimal burying depth,the critical burying depth and the optimal explosive specific charge of the blasting crater.
基金This work was supported by Open Research Project of State Key Laboratory of Control and Simulation of Power Systems and Generation Equipments,Tsinghua University(No.SKLD20M20)Xinjiang Uygur Autonomous Region Natural Science Key Project of University Research Program(No.XJEDU2020I004).
文摘Battery energy storage systems(BESSs)can provide instantaneous support for frequency regulation(FR)because of their fast response characteristics.However,purely pursuing a better FR effect calls for continually rapid cycles of BESSs,which shortens their lifetime and deteriorates the operational economy.To coordinate the lifespan savings and the FR effect,this paper presents a control strategy for the FR of BESSs based on fuzzy logic and hierarchical controllers.The fuzzy logic controller improves the effect of FR by adjusting the charging/discharging power of the BESS with a higher response speed and precision based on the area control error(ACE)signal and the change rate of ACE in a non-linear way.Hierarchical controllers effectively reduce the life loss by optimizing the depth of discharge,which ensures that the state of charge(SOC)of BESS is always in the optimal operating range,and the total FR cost is the lowest at this time.The proposed method can achieve the optimal balance between ACE reduction and operational economy of BESS.The effectiveness of the proposed strategy is verified in a two-area power system.