The tokamak HT-7U project has been funded as a Chinese national project since 1998. The main object of the project is to build a nuclear fusion experimental device with divertor configuration, which is designed by the...The tokamak HT-7U project has been funded as a Chinese national project since 1998. The main object of the project is to build a nuclear fusion experimental device with divertor configuration, which is designed by the Institute of Plasma Physics, the Chinese Academy of Sciences (ASIPP). It is a full superconducting device, consisting of superconducting toroidal field (TF) coils and superconducting poloidal field (PF) coil. During the operation of the device, the operational parameter of device should be checked by technical diagnosis. This paper describes the design of circuit for checldng short between every two parts of the HT7U device. The main contents of design include circuit of data acquisition and data processing of computer.展开更多
In this paper, the interference checking of three-dimensional objects within a plant is discussed and accomplished, which offers an automated solution to the design problems inherent in multi-user, multi-model environ...In this paper, the interference checking of three-dimensional objects within a plant is discussed and accomplished, which offers an automated solution to the design problems inherent in multi-user, multi-model environments. Also, the collision detection among moving objects is presented and discussed, and some new ideas are proposed. These methods are successfully applied in our Plant Design System (PDS) and are proven to be very practical and efficient.展开更多
A new chaotic genetic hybrid algorithm(CGHA) based on float point coding was put forward in this paper.Firstly,it used chaos optimization to search coarsely and produced a better initial population.Then,a power functi...A new chaotic genetic hybrid algorithm(CGHA) based on float point coding was put forward in this paper.Firstly,it used chaos optimization to search coarsely and produced a better initial population.Then,a power function carrier was adopted to improve the ergodicity and the sufficiency of the chaos optimization.Secondly,the genetic algorithm(GA) was used to search finely and guaranteed the population's evolution.To avoid the search being trapped in local minimum,a chaos degenerate mutation operator was designed to make the search converge to a global optimum quickly.Finally,CGHA was used to solve a typical mechanical optimization problem of shear stress checking for a cylinder helix spring.Compared with traditional penalty function method,chaos-Powell hybrid algorithm and standard GA,CGHA shows better performance in solution precision and convergence speed than those of the algorithms.Therefore,CGHA is a new effective way to solve the problems in mechanical optimization design.展开更多
The construction of International Tourism Island has accelerated the development of Sanya City. The population aggregation and the external extension of urban area have brought a lot of negative effects, such as disco...The construction of International Tourism Island has accelerated the development of Sanya City. The population aggregation and the external extension of urban area have brought a lot of negative effects, such as discontinuities of green space matrix, dysfunction of green wedge permeation, deficiency of eco-corridor, structural imbalance of green space system and so on. The overall layout of Green space system known as "One Belt & Three Bays, One Core & Six Towns, Two Axes & Three Wedges, Two Net Synchronous-construction" strengthens the eco-connection among different groups and green space in central area of the city, and realizes the collaborative construction of both resource corridor and landscape corridor. The eco-layout of green core, green corridor and green patch helps keep the integrity of large vegetation patches, enhances the eco-connection of different types of green space and improves finger-shaped network of urban green space. The most efficient way to promote the circulation of urban ecosystem and the positive development of Sanya City is to plan multilevel and three-dimensional eco-space structure and maximize ecological benefits of green space system.展开更多
China Petroleum Design & Engineering Company (CPDEC) is a new corporation established in the year 2001. The company puts forward its development objectives for becoming a first-class national and international des...China Petroleum Design & Engineering Company (CPDEC) is a new corporation established in the year 2001. The company puts forward its development objectives for becoming a first-class national and international desigh firm within 5 to 10 years. In this paper, the theories and techniques related to the business environment and strategy are used to make an analysis of the companys development objectives. According to the analysis of the environment and internal conditions of CPDEC, we suggest adoping the strategic measures for reaching the development objectives on the basis of the SWOT (the acronym of Strengths, Weaknesses, Opportunities and Threats) analysis method. Some conclusions and recommendations on the companys situation and strategies are given.展开更多
In this study, the overall planning of Ji Townlet in Jianshan Town, Tujia-Miao Autonomous Prefecture was analyzed. The landscape planning & design of small townlets combined with the natural environment, humanist ...In this study, the overall planning of Ji Townlet in Jianshan Town, Tujia-Miao Autonomous Prefecture was analyzed. The landscape planning & design of small townlets combined with the natural environment, humanist resources and ethnic features in ethnic area were discussed.展开更多
In 2014, the National Association of Homebuilders conducted an initial survey about the use of Building Information Modeling (BIM) in residential construction. They found that BIM had not been widely adopted, but ther...In 2014, the National Association of Homebuilders conducted an initial survey about the use of Building Information Modeling (BIM) in residential construction. They found that BIM had not been widely adopted, but there was interest in future use. Four years later, the authors, Prof. Ghosh Dastider and Matt Jefferies at Washington University in St. Louis used a similar methodology to see what has changed. They found a significant increase in BIM’s application in the multifamily residential industry. Based on data collected from the re-conducted survey, the authors concluded with the future predictions on how use of BIM will accelerate in residential construction market in next few years. Few significant findings indicate increased use of BIM among contractors along with design built firms, as well as during the construction phase and life cycle analysis.展开更多
Liuzhou City is located in Guangxi Zhuang Autonomous Region of China. It has a warm and rainy climate and belongs to the middle subtropical monsoon climate. It is a rainstorm and flood-prone area. The work of flood dr...Liuzhou City is located in Guangxi Zhuang Autonomous Region of China. It has a warm and rainy climate and belongs to the middle subtropical monsoon climate. It is a rainstorm and flood-prone area. The work of flood drainage and waterlogging prevention is very important. The “minute to minute” rainfall process data of Liuzhou National Meteorological Observation Station from 1975 to 2014 and the Pilgrim & Cordery method were used to estimate the short-time design rainstorm profile of Liuzhou City, and the profiles of the rainfall lasting for 30, 60, 90, 120, 150, and 180 min were obtained. The research shows that the same rain duration and different recurrence period conditions are consistent with the rainstorm profile. The rainfall duration of 30, 60, 90, 120, and 180 min generally shows single-peak rainstorm profile, and the rainfall duration of 150 min shows double-peak rainstorm profile. Most peaks of each short-time design rainstorm profile are at or ahead of the 1/3 part of the entire rainfall process. During the same recurrence period, the rainfall in peak period fluctuated with the increase of the duration, and the intensity of rainfall increased with the prolonging of the recurrence period.展开更多
As a new product of the development of modern science and technology,the research and development of logistics robot has become the focus of social attention.Robot sorting and handling is the designated project of Jia...As a new product of the development of modern science and technology,the research and development of logistics robot has become the focus of social attention.Robot sorting and handling is the designated project of Jiangsu University Robot Competition.According to the requirements of the competition,this paper designs a kind of logistics robot trolley which can identify and grab materials according to a given path and transport them to a predetermined location.The mechanical structure design,driving motor selection and mechanical checking calculation of the car are mainly completed.According to the later experiments,the results show that the desired results can be achieved.展开更多
With the development of economy, the adjustment of industrial structure, the improvement of people's living standard and the expansion of urbanization, the structure of the city has changed a lot. The proportion of i...With the development of economy, the adjustment of industrial structure, the improvement of people's living standard and the expansion of urbanization, the structure of the city has changed a lot. The proportion of industrial use of electricity decreased year by year, the proportion of household electricity, commercial electricity and public utilities increased year by year, the peak and valley change increased year by year. Therefore, the construction of hydropower project, to improve the current situation of the system of regulating the power grid, has a positive role in promoting. Reinforced rock fill dam with face slab in foreign countries has been built and at the dam more than 50m high dam more than 70 seats, of which more than 100m high dam 18. At present, Brazil estuary aliya rock fill dam is the highest dam in this kind of dam in the world, built in 1980, has been running well. Our reinforced rock fill dam with face slab design and construction technology in the introduction of digestion and absorption of foreign advanced experience in the foundation, the systemic research on a considerable scale. The design level and construction technology of the rock fill dam with face slab in our country have reached the international advanced level by the complete technology of the construction of the 100m level rock fill dam with face slab. This paper mainly from the rock fill dam with face slab, dam type selection and layout of water conservancy project comparison; dam profile design; detail dam; dam high determined; stability analysis; strength calculation; overflow capacity check aspects were studied.展开更多
With the rapid growth of the offshore wind industry, the innovative floating offshore wind turbine is chosen as the most feasible device to harvest the vast wind energy in deep water area. However there is no practica...With the rapid growth of the offshore wind industry, the innovative floating offshore wind turbine is chosen as the most feasible device to harvest the vast wind energy in deep water area. However there is no practical design guide for the floating wind turbine especially the floating foundation. In this paper, based on the investigation on the worldwide floating wind turbine and current available expertise on floating platforms accumulated in offshore O/G (oil and gas) industry, an integrated design methodology is presented according to the specialized characteristics of wind turbine, including the type selection of foundation and mooring system, design standard, design procedure, design conditions, key technologies involved. Finally a semi-submersible floating foundation is designed to support certain megawatt-rating wind turbine of Goldwind and also performance analysis and code checks are performed to validate the design. The design method of the floating foundation provided in this paper is proved feasible and can be adopted in practical engineering design.展开更多
文摘The tokamak HT-7U project has been funded as a Chinese national project since 1998. The main object of the project is to build a nuclear fusion experimental device with divertor configuration, which is designed by the Institute of Plasma Physics, the Chinese Academy of Sciences (ASIPP). It is a full superconducting device, consisting of superconducting toroidal field (TF) coils and superconducting poloidal field (PF) coil. During the operation of the device, the operational parameter of device should be checked by technical diagnosis. This paper describes the design of circuit for checldng short between every two parts of the HT7U device. The main contents of design include circuit of data acquisition and data processing of computer.
文摘In this paper, the interference checking of three-dimensional objects within a plant is discussed and accomplished, which offers an automated solution to the design problems inherent in multi-user, multi-model environments. Also, the collision detection among moving objects is presented and discussed, and some new ideas are proposed. These methods are successfully applied in our Plant Design System (PDS) and are proven to be very practical and efficient.
基金Sponsored by the National Natural Science Foundation of China (50875186)the Research and Development Projects of Tianjin University of Technology and Education (KJ2008028,KJ2008043)
文摘A new chaotic genetic hybrid algorithm(CGHA) based on float point coding was put forward in this paper.Firstly,it used chaos optimization to search coarsely and produced a better initial population.Then,a power function carrier was adopted to improve the ergodicity and the sufficiency of the chaos optimization.Secondly,the genetic algorithm(GA) was used to search finely and guaranteed the population's evolution.To avoid the search being trapped in local minimum,a chaos degenerate mutation operator was designed to make the search converge to a global optimum quickly.Finally,CGHA was used to solve a typical mechanical optimization problem of shear stress checking for a cylinder helix spring.Compared with traditional penalty function method,chaos-Powell hybrid algorithm and standard GA,CGHA shows better performance in solution precision and convergence speed than those of the algorithms.Therefore,CGHA is a new effective way to solve the problems in mechanical optimization design.
基金Sponsored by Hainan Provincial Natural Science Fund(411095)Hainan Provincial Philosophical and Social Science Planning Program(HNSK(JD)11-1)Sanya University-Local Goverment Science&Technology Cooperation Program(2013YD53)
文摘The construction of International Tourism Island has accelerated the development of Sanya City. The population aggregation and the external extension of urban area have brought a lot of negative effects, such as discontinuities of green space matrix, dysfunction of green wedge permeation, deficiency of eco-corridor, structural imbalance of green space system and so on. The overall layout of Green space system known as "One Belt & Three Bays, One Core & Six Towns, Two Axes & Three Wedges, Two Net Synchronous-construction" strengthens the eco-connection among different groups and green space in central area of the city, and realizes the collaborative construction of both resource corridor and landscape corridor. The eco-layout of green core, green corridor and green patch helps keep the integrity of large vegetation patches, enhances the eco-connection of different types of green space and improves finger-shaped network of urban green space. The most efficient way to promote the circulation of urban ecosystem and the positive development of Sanya City is to plan multilevel and three-dimensional eco-space structure and maximize ecological benefits of green space system.
文摘China Petroleum Design & Engineering Company (CPDEC) is a new corporation established in the year 2001. The company puts forward its development objectives for becoming a first-class national and international desigh firm within 5 to 10 years. In this paper, the theories and techniques related to the business environment and strategy are used to make an analysis of the companys development objectives. According to the analysis of the environment and internal conditions of CPDEC, we suggest adoping the strategic measures for reaching the development objectives on the basis of the SWOT (the acronym of Strengths, Weaknesses, Opportunities and Threats) analysis method. Some conclusions and recommendations on the companys situation and strategies are given.
文摘In this study, the overall planning of Ji Townlet in Jianshan Town, Tujia-Miao Autonomous Prefecture was analyzed. The landscape planning & design of small townlets combined with the natural environment, humanist resources and ethnic features in ethnic area were discussed.
文摘In 2014, the National Association of Homebuilders conducted an initial survey about the use of Building Information Modeling (BIM) in residential construction. They found that BIM had not been widely adopted, but there was interest in future use. Four years later, the authors, Prof. Ghosh Dastider and Matt Jefferies at Washington University in St. Louis used a similar methodology to see what has changed. They found a significant increase in BIM’s application in the multifamily residential industry. Based on data collected from the re-conducted survey, the authors concluded with the future predictions on how use of BIM will accelerate in residential construction market in next few years. Few significant findings indicate increased use of BIM among contractors along with design built firms, as well as during the construction phase and life cycle analysis.
文摘Liuzhou City is located in Guangxi Zhuang Autonomous Region of China. It has a warm and rainy climate and belongs to the middle subtropical monsoon climate. It is a rainstorm and flood-prone area. The work of flood drainage and waterlogging prevention is very important. The “minute to minute” rainfall process data of Liuzhou National Meteorological Observation Station from 1975 to 2014 and the Pilgrim & Cordery method were used to estimate the short-time design rainstorm profile of Liuzhou City, and the profiles of the rainfall lasting for 30, 60, 90, 120, 150, and 180 min were obtained. The research shows that the same rain duration and different recurrence period conditions are consistent with the rainstorm profile. The rainfall duration of 30, 60, 90, 120, and 180 min generally shows single-peak rainstorm profile, and the rainfall duration of 150 min shows double-peak rainstorm profile. Most peaks of each short-time design rainstorm profile are at or ahead of the 1/3 part of the entire rainfall process. During the same recurrence period, the rainfall in peak period fluctuated with the increase of the duration, and the intensity of rainfall increased with the prolonging of the recurrence period.
基金This paper is sponsored by the“Qinglan Project”of Jiangsu University,the General Natural Science Research Project of Jiangsu University(19KJD510005)Guangxi Key Laboratory of Automatic Testing Technology and Instruments will be open to fund in 2021(YQ21207)the Industry-University Cooperative Education Project of the Ministry of Education(201902168015)。
文摘As a new product of the development of modern science and technology,the research and development of logistics robot has become the focus of social attention.Robot sorting and handling is the designated project of Jiangsu University Robot Competition.According to the requirements of the competition,this paper designs a kind of logistics robot trolley which can identify and grab materials according to a given path and transport them to a predetermined location.The mechanical structure design,driving motor selection and mechanical checking calculation of the car are mainly completed.According to the later experiments,the results show that the desired results can be achieved.
文摘With the development of economy, the adjustment of industrial structure, the improvement of people's living standard and the expansion of urbanization, the structure of the city has changed a lot. The proportion of industrial use of electricity decreased year by year, the proportion of household electricity, commercial electricity and public utilities increased year by year, the peak and valley change increased year by year. Therefore, the construction of hydropower project, to improve the current situation of the system of regulating the power grid, has a positive role in promoting. Reinforced rock fill dam with face slab in foreign countries has been built and at the dam more than 50m high dam more than 70 seats, of which more than 100m high dam 18. At present, Brazil estuary aliya rock fill dam is the highest dam in this kind of dam in the world, built in 1980, has been running well. Our reinforced rock fill dam with face slab design and construction technology in the introduction of digestion and absorption of foreign advanced experience in the foundation, the systemic research on a considerable scale. The design level and construction technology of the rock fill dam with face slab in our country have reached the international advanced level by the complete technology of the construction of the 100m level rock fill dam with face slab. This paper mainly from the rock fill dam with face slab, dam type selection and layout of water conservancy project comparison; dam profile design; detail dam; dam high determined; stability analysis; strength calculation; overflow capacity check aspects were studied.
文摘With the rapid growth of the offshore wind industry, the innovative floating offshore wind turbine is chosen as the most feasible device to harvest the vast wind energy in deep water area. However there is no practical design guide for the floating wind turbine especially the floating foundation. In this paper, based on the investigation on the worldwide floating wind turbine and current available expertise on floating platforms accumulated in offshore O/G (oil and gas) industry, an integrated design methodology is presented according to the specialized characteristics of wind turbine, including the type selection of foundation and mooring system, design standard, design procedure, design conditions, key technologies involved. Finally a semi-submersible floating foundation is designed to support certain megawatt-rating wind turbine of Goldwind and also performance analysis and code checks are performed to validate the design. The design method of the floating foundation provided in this paper is proved feasible and can be adopted in practical engineering design.