In recent years,China’s landscaping projects have developed vigorously,and the growth rate of urban garden green space areas has been maintained at about 5%.Overall,with the development of the national economy and th...In recent years,China’s landscaping projects have developed vigorously,and the growth rate of urban garden green space areas has been maintained at about 5%.Overall,with the development of the national economy and the support of macro policies,people’s demand for close to nature and beautify the environment is gradually increasing,which has brought new growth momentum for the development of the landscaping industry.Simultaneously,from the perspective of future economic development and urban development,the landscaping industry still has a lot of room for development.However,with the rapid development of landscape engineering,the problem of cost control of landscape engineering is becoming more prominent,the phenomenon of budget overestimation is common,and there are many factors affecting the cost of landscape engineering,which brings difficulties and challenges to the analysis of its influencing factors and cost management.How to scientifically analyze the influencing factors and control the cost has become an important link in the landscaping project.To solve the above problems,this paper takes the design stage of landscaping engineering as the background,takes the design estimate of landscaping engineering as the research object,through literature research and data collection,fully excavates the main influencing factors of the design estimate stage of landscaping engineering,analyzes the key points of cost control,and provides reference ideas and directions for the later cost management and control.展开更多
By considering the identification problem of unknown but fixed Hamiltonian H = S0σ0 +∑i=x,y,z Siσi where σi (i = x, y, z) are pauli matrices and σ0=I, we explore the feasibility and limitation of empirically d...By considering the identification problem of unknown but fixed Hamiltonian H = S0σ0 +∑i=x,y,z Siσi where σi (i = x, y, z) are pauli matrices and σ0=I, we explore the feasibility and limitation of empirically determining the Hamiltonian parameters for quantum systems under experimental conditions imposed by projective measurements and initialization procedures. It may be unsurprising to physicists that one can not obtain the knowledge of So no matter what kind of projective measurements and initialization are permitted, but the observation draws our attention to the importance of the parameter identifiability under different experimental condition. It has also been revealed that one can obtain the knowledge of |Sz| and Sx^2+Sy^2 at most when only the projective measurement {|0/(0|, |1/(1|} is permitted to perform on and initialize the qubit. Further more, we demonstrated that it is feasible to distinguish |Sx|, |Sy|, and |Sz| even without any a priori information about Hamiltonian if at least two kinds of projective measurement or initialization procedures are permitted. It should be emphasized that both projective measurements and initialization procedures play an important role in quantum system identification.展开更多
文摘In recent years,China’s landscaping projects have developed vigorously,and the growth rate of urban garden green space areas has been maintained at about 5%.Overall,with the development of the national economy and the support of macro policies,people’s demand for close to nature and beautify the environment is gradually increasing,which has brought new growth momentum for the development of the landscaping industry.Simultaneously,from the perspective of future economic development and urban development,the landscaping industry still has a lot of room for development.However,with the rapid development of landscape engineering,the problem of cost control of landscape engineering is becoming more prominent,the phenomenon of budget overestimation is common,and there are many factors affecting the cost of landscape engineering,which brings difficulties and challenges to the analysis of its influencing factors and cost management.How to scientifically analyze the influencing factors and control the cost has become an important link in the landscaping project.To solve the above problems,this paper takes the design stage of landscaping engineering as the background,takes the design estimate of landscaping engineering as the research object,through literature research and data collection,fully excavates the main influencing factors of the design estimate stage of landscaping engineering,analyzes the key points of cost control,and provides reference ideas and directions for the later cost management and control.
基金Supported by the National Nature Science Foundation of China under Grant No.60674040
文摘By considering the identification problem of unknown but fixed Hamiltonian H = S0σ0 +∑i=x,y,z Siσi where σi (i = x, y, z) are pauli matrices and σ0=I, we explore the feasibility and limitation of empirically determining the Hamiltonian parameters for quantum systems under experimental conditions imposed by projective measurements and initialization procedures. It may be unsurprising to physicists that one can not obtain the knowledge of So no matter what kind of projective measurements and initialization are permitted, but the observation draws our attention to the importance of the parameter identifiability under different experimental condition. It has also been revealed that one can obtain the knowledge of |Sz| and Sx^2+Sy^2 at most when only the projective measurement {|0/(0|, |1/(1|} is permitted to perform on and initialize the qubit. Further more, we demonstrated that it is feasible to distinguish |Sx|, |Sy|, and |Sz| even without any a priori information about Hamiltonian if at least two kinds of projective measurement or initialization procedures are permitted. It should be emphasized that both projective measurements and initialization procedures play an important role in quantum system identification.