Selecting the optimal one from similar schemes is a paramount work in equipment design.In consideration of similarity of schemes and repetition of characteristic indices,the theory of set pair analysis(SPA)is proposed...Selecting the optimal one from similar schemes is a paramount work in equipment design.In consideration of similarity of schemes and repetition of characteristic indices,the theory of set pair analysis(SPA)is proposed,and then an optimal selection model is established.In order to improve the accuracy and flexibility,the model is modified by the contribution degree.At last,this model has been validated by an example,and the result demonstrates the method is feasible and valuable for practical usage.展开更多
The China National Machinery Import and Export Corporation (CMC), founded in 1950, is a large state-owned foreign trade enterprise subordinated to the Ministry of Foreign Trade and Economic Cooperation (MOFTEC). The c...The China National Machinery Import and Export Corporation (CMC), founded in 1950, is a large state-owned foreign trade enterprise subordinated to the Ministry of Foreign Trade and Economic Cooperation (MOFTEC). The corporation focuses on the import and export of mechanical and electrical products. It has maintained an annual trade volume of more than US$ 2 billion for many years and ranks among the top 10 foreign trade companies in the country.展开更多
The paper introduced complete sets of automatic equipment and technology used in thin seam coal face, and proposed the comprehensive mechanization and automation of safe and high efficiency mining models based on the ...The paper introduced complete sets of automatic equipment and technology used in thin seam coal face, and proposed the comprehensive mechanization and automation of safe and high efficiency mining models based on the thin seam drum shearer. The key technology of short length and high power thin seam drum shearer, and new type roof support with big extension ratio and plate canopy were introduced. The new research achievement on automatic control system of complete sets of equipment for the thin seam coal, which composed of electronic-hydraulic system, compact thin seam roof supports, high effective shearer with intelligent control system, and characterized by automatical follow-up and remote control technology, was described in this paper..展开更多
In view of complex geological characteristics and alternating loading conditions associated with cyclic large amount of gas injection and withdrawal in underground gas storage(UGS) of China, a series of key gas storag...In view of complex geological characteristics and alternating loading conditions associated with cyclic large amount of gas injection and withdrawal in underground gas storage(UGS) of China, a series of key gas storage construction technologies were established, mainly including UGS site selection and evaluation, key index design, well drilling and completion, surface engineering and operational risk warning and assessment, etc. The effect of field application was discussed and summarized. Firstly, trap dynamic sealing capacity evaluation technology for conversion of UGS from the fault depleted or partially depleted gas reservoirs. A key index design method mainly based on the effective gas storage capacity design for water flooded heterogeneous gas reservoirs was proposed. To effectively guide the engineering construction of UGS, the safe well drilling, high quality cementing and high pressure and large flow surface injection and production engineering optimization suitable for long-term alternate loading condition and ultra-deep and ultra-low temperature formation were developed. The core surface equipment like high pressure gas injection compressor can be manufactured by our own. Last, the full-system operational risk warning and assessment technology for UGS was set up. The above 5 key technologies have been utilized in site selection, development scheme design, engineering construction and annual operations of 6 UGS groups, e.g. the Hutubi UGS in Xinjiang. To date, designed main indexes are highly consistent with actural performance, the 6 UGS groups have the load capacity of over 7.5 billion cubic meters of working gas volume and all the storage facilities have been running efficiently and safely.展开更多
文摘Selecting the optimal one from similar schemes is a paramount work in equipment design.In consideration of similarity of schemes and repetition of characteristic indices,the theory of set pair analysis(SPA)is proposed,and then an optimal selection model is established.In order to improve the accuracy and flexibility,the model is modified by the contribution degree.At last,this model has been validated by an example,and the result demonstrates the method is feasible and valuable for practical usage.
文摘The China National Machinery Import and Export Corporation (CMC), founded in 1950, is a large state-owned foreign trade enterprise subordinated to the Ministry of Foreign Trade and Economic Cooperation (MOFTEC). The corporation focuses on the import and export of mechanical and electrical products. It has maintained an annual trade volume of more than US$ 2 billion for many years and ranks among the top 10 foreign trade companies in the country.
基金Supported by the National Natural Science Foundation of China (50375026, 50375028) the National High-tech R&D Program of China (863 Program) (2012AA06A407)
文摘The paper introduced complete sets of automatic equipment and technology used in thin seam coal face, and proposed the comprehensive mechanization and automation of safe and high efficiency mining models based on the thin seam drum shearer. The key technology of short length and high power thin seam drum shearer, and new type roof support with big extension ratio and plate canopy were introduced. The new research achievement on automatic control system of complete sets of equipment for the thin seam coal, which composed of electronic-hydraulic system, compact thin seam roof supports, high effective shearer with intelligent control system, and characterized by automatical follow-up and remote control technology, was described in this paper..
基金Supported by the CNPC Science and Technology Major Project(2015E-4002)
文摘In view of complex geological characteristics and alternating loading conditions associated with cyclic large amount of gas injection and withdrawal in underground gas storage(UGS) of China, a series of key gas storage construction technologies were established, mainly including UGS site selection and evaluation, key index design, well drilling and completion, surface engineering and operational risk warning and assessment, etc. The effect of field application was discussed and summarized. Firstly, trap dynamic sealing capacity evaluation technology for conversion of UGS from the fault depleted or partially depleted gas reservoirs. A key index design method mainly based on the effective gas storage capacity design for water flooded heterogeneous gas reservoirs was proposed. To effectively guide the engineering construction of UGS, the safe well drilling, high quality cementing and high pressure and large flow surface injection and production engineering optimization suitable for long-term alternate loading condition and ultra-deep and ultra-low temperature formation were developed. The core surface equipment like high pressure gas injection compressor can be manufactured by our own. Last, the full-system operational risk warning and assessment technology for UGS was set up. The above 5 key technologies have been utilized in site selection, development scheme design, engineering construction and annual operations of 6 UGS groups, e.g. the Hutubi UGS in Xinjiang. To date, designed main indexes are highly consistent with actural performance, the 6 UGS groups have the load capacity of over 7.5 billion cubic meters of working gas volume and all the storage facilities have been running efficiently and safely.