Mathematical models and simulation are considered a powerful tool in engineering practice. Those tools are becoming increasingly used for the improvement of wastewater treatment plants design because the conceptual de...Mathematical models and simulation are considered a powerful tool in engineering practice. Those tools are becoming increasingly used for the improvement of wastewater treatment plants design because the conceptual design is complex and ill-defined. In this paper, three alternatives: 1) complete mix activated sludge without nitrogen removal (CAS);2) complete mix activated sludge with nitrogen removal (CAS-N) and;3) membrane bioreactor (MBR) processes were designed into two steps: first concept design to calculate the size of process units, then second implement modeling and simulation to improve the accuracy of the conceptual design. In brief, the treatment process design has been verified by using the activated sludge model No. 1 (ASM1) in GPS-X (v.7) simulation software. This application helps not only in sizing the treatment units but also in understanding the plant’s capacity. In the same time, it can assist in studying the future expansion works required for increased hydraulic and organic loadings. For this purpose, Tikrit WWTP was selected as a case study. The used model was validated by comparing the designed values of the plant and the modeling data. The verification of the obtained results from both hand calculations and the results of the program showed a good agreement. A significant difference in the volume of secondary treatment was obtained from design calculations, where the CAS without denitrification system was 9244 m3 (aerobic and secondary tanks), CAS with denitrification system was 11,324 m3 (anoxic, aerobic and secondary tanks) and for MBR system was 7468 m3 (anoxic, aerobic and immersed membrane tanks). From the obtained results point of view, it can be concluded that mathematical models can be considered as worthy tools to complement the established wastewater treatment plant design procedures.展开更多
A newly developed model for the optimum municipal wastewater treatment plant(MWTP) design is presented. Through introducing the interval variables, the model attempts to consider the effects of uncertainties caused by...A newly developed model for the optimum municipal wastewater treatment plant(MWTP) design is presented. Through introducing the interval variables, the model attempts to consider the effects of uncertainties caused by the fluctuation of the wastewater quality and quantity during the design of MWTP. The model solution procedure is illustrated in detail, and a numerical example is given to verify the feasibility and advantage of the model. Furthermore, the possibility of the model application is briefly outlined.展开更多
文摘Mathematical models and simulation are considered a powerful tool in engineering practice. Those tools are becoming increasingly used for the improvement of wastewater treatment plants design because the conceptual design is complex and ill-defined. In this paper, three alternatives: 1) complete mix activated sludge without nitrogen removal (CAS);2) complete mix activated sludge with nitrogen removal (CAS-N) and;3) membrane bioreactor (MBR) processes were designed into two steps: first concept design to calculate the size of process units, then second implement modeling and simulation to improve the accuracy of the conceptual design. In brief, the treatment process design has been verified by using the activated sludge model No. 1 (ASM1) in GPS-X (v.7) simulation software. This application helps not only in sizing the treatment units but also in understanding the plant’s capacity. In the same time, it can assist in studying the future expansion works required for increased hydraulic and organic loadings. For this purpose, Tikrit WWTP was selected as a case study. The used model was validated by comparing the designed values of the plant and the modeling data. The verification of the obtained results from both hand calculations and the results of the program showed a good agreement. A significant difference in the volume of secondary treatment was obtained from design calculations, where the CAS without denitrification system was 9244 m3 (aerobic and secondary tanks), CAS with denitrification system was 11,324 m3 (anoxic, aerobic and secondary tanks) and for MBR system was 7468 m3 (anoxic, aerobic and immersed membrane tanks). From the obtained results point of view, it can be concluded that mathematical models can be considered as worthy tools to complement the established wastewater treatment plant design procedures.
文摘A newly developed model for the optimum municipal wastewater treatment plant(MWTP) design is presented. Through introducing the interval variables, the model attempts to consider the effects of uncertainties caused by the fluctuation of the wastewater quality and quantity during the design of MWTP. The model solution procedure is illustrated in detail, and a numerical example is given to verify the feasibility and advantage of the model. Furthermore, the possibility of the model application is briefly outlined.