期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Analysis on the multi-phase flow characterization in cross-measure borehole during coal hydraulic slotting 被引量:2
1
作者 Chunshan Zheng Baiquan Lin +3 位作者 Mehmet S.Kizil Saiied M.Aminossadati He Li Zhongwei Chen 《International Journal of Mining Science and Technology》 EI CSCD 2018年第4期692-696,共5页
Hydraulic slotting in a gas drainage borehole is an effective method of enhancing gas drainage perfor- mance. However, it frequently occurs that a large amount of slotting products (mainly the coal slurry and gas) i... Hydraulic slotting in a gas drainage borehole is an effective method of enhancing gas drainage perfor- mance. However, it frequently occurs that a large amount of slotting products (mainly the coal slurry and gas) intensely spurt out of the borehole during the slotting, which adversely affects the slotting efficiency. Despite extensive previous investigations on the mechanism and prevention-device design of the spurt during ordinary borehole drilling, a very few studies has focused on the spurt in the s Ottlng pro ] " _ cess. The slotting spurt is mainly caused by two reasons: the coal and gas outburst in the borehole and the borehole deslagging blockage. This paper focuses on the second reason, and investigates the hydraulic deslagging flow patterns in the annular space between the drill pipe and borehole wall Results show that there are six deslagging flow patterns when the drill pipe is still: pure slurry flow, pure gas flow, bubble flow, intermittent flow, layering flow and annular flow. When the drill pipe rotates, each of those six flow patterns changes due to the Taylor vortex effect. Outcomes of this study could help to better understand the slotting-spurt mechanism and provide guidance on the anti-spurt strategies through eliminating the borehole deslagging blockage. 展开更多
关键词 Coal hydraulic slotting Cross-measure borehole Borehole spurt deslagging flow pattern
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部