The nuclear power plant is suitable for base-load operation, while the pumped-storage unit mainly gives play to capacity benefit in the electric power system;hence, the integrated development and hybrid operation mode...The nuclear power plant is suitable for base-load operation, while the pumped-storage unit mainly gives play to capacity benefit in the electric power system;hence, the integrated development and hybrid operation mode of the two can better meet the needs of the electric power system. This article first presents an analysis of the necessity and superiority of such mode, then explains its meaning and analyzes the working routes. Finally, it proposes the business modes as follows: low price pumping water electricity plus nuclear power in the near term;nuclear power shifted to pumped storage power participating in market competition in the middle term;and, in the long term, nuclear power shifted to pumped storage power as primary and serving as an electric power system when needed.展开更多
This paper briefs the development policies and focal construction points of powerindustry in China in 10th Five-year Plan period, and in accordance with the developmentaltrends of international power technology, puts ...This paper briefs the development policies and focal construction points of powerindustry in China in 10th Five-year Plan period, and in accordance with the developmentaltrends of international power technology, puts forward the key technological problems tobe studies in China power industry currently.[展开更多
Developer and owner:China Three Gorges Corporation(CTG)Engineering management:China Three Gorges Projects Development Corporation(CTGPC)Designer:Chengdu Engineering Corporation Co.,Ltd.,Power
为解决电力系统暂态过电压风险评估中输入特征集构建合理性不足、强相关性差等问题,提出一种考虑新能源多场站短路比MRSCR(multiple renewable energy stations short circuit ratio)的暂态过电压风险评估方法。首先,通过分析暂态过电...为解决电力系统暂态过电压风险评估中输入特征集构建合理性不足、强相关性差等问题,提出一种考虑新能源多场站短路比MRSCR(multiple renewable energy stations short circuit ratio)的暂态过电压风险评估方法。首先,通过分析暂态过电压数学模型,发现MRSCR与暂态过电压呈负相关性;然后,综合考虑MRSCR与其他影响系统暂态过电压的关键因素,构建多维输入特征集;最后,通过卷积神经网络建立输入特征与暂态过电压的高维映射,实现系统暂态过电压风险的快速、准确评估,并通过算例分析验证了所提方法的有效性、可行性。展开更多
基金funded by the Project “Resource Characteristics of Main Watersheds and Key Issues in Development and Utilization of Hydroelectricity in South America and Africa”the National Science Foundation of China (U1766201)
文摘The nuclear power plant is suitable for base-load operation, while the pumped-storage unit mainly gives play to capacity benefit in the electric power system;hence, the integrated development and hybrid operation mode of the two can better meet the needs of the electric power system. This article first presents an analysis of the necessity and superiority of such mode, then explains its meaning and analyzes the working routes. Finally, it proposes the business modes as follows: low price pumping water electricity plus nuclear power in the near term;nuclear power shifted to pumped storage power participating in market competition in the middle term;and, in the long term, nuclear power shifted to pumped storage power as primary and serving as an electric power system when needed.
文摘This paper briefs the development policies and focal construction points of powerindustry in China in 10th Five-year Plan period, and in accordance with the developmentaltrends of international power technology, puts forward the key technological problems tobe studies in China power industry currently.[
文摘Developer and owner:China Three Gorges Corporation(CTG)Engineering management:China Three Gorges Projects Development Corporation(CTGPC)Designer:Chengdu Engineering Corporation Co.,Ltd.,Power
文摘为解决电力系统暂态过电压风险评估中输入特征集构建合理性不足、强相关性差等问题,提出一种考虑新能源多场站短路比MRSCR(multiple renewable energy stations short circuit ratio)的暂态过电压风险评估方法。首先,通过分析暂态过电压数学模型,发现MRSCR与暂态过电压呈负相关性;然后,综合考虑MRSCR与其他影响系统暂态过电压的关键因素,构建多维输入特征集;最后,通过卷积神经网络建立输入特征与暂态过电压的高维映射,实现系统暂态过电压风险的快速、准确评估,并通过算例分析验证了所提方法的有效性、可行性。