The market development and policy matching of existing building energy-saving retrofits determine the effectiveness of policies in promoting the operation of existing building energy-saving retrofit market.Based on th...The market development and policy matching of existing building energy-saving retrofits determine the effectiveness of policies in promoting the operation of existing building energy-saving retrofit market.Based on the perspective of market development to evaluate the effectiveness of existing building energy-saving transformation policy,it is necessary to clarify the basic connotation of the effectiveness of existing building energy-saving transformation policy,systematically analyze the evaluation content,construct a multi-level evaluation index system,and select scientific and effective quantitative evaluation methods to implement a strict evaluation process.展开更多
ESCO is the internal driving force for the development of the existing building energy-saving renovation market,and the driving effect of the ESCO market depends on scientific and effective comprehensive benefit evalu...ESCO is the internal driving force for the development of the existing building energy-saving renovation market,and the driving effect of the ESCO market depends on scientific and effective comprehensive benefit evaluation.Based on analysis of the status qua at home and abroad,this paper reveals the necessity and value of research existing Building Energy Saving ESCO market development driving force effectiveness evaluation.The purpose of ESCO driving force benefit evaluation-oriented,establish the basic principles of evaluation index system of choice.Through the analysis of the evaluation content of the three dimensions of economic benefit,environmental benefit and social benefit,the comprehensive evaluation index system of the target level,criterion level and index level of the benefit evaluation of the existing building energy-saving renovation market development is constructed.AHP and fuzzy comprehensive evaluation of the combination,construct quantitative models of energy-saving drive ESCO market development role in the evaluation of the effectiveness of existing buildings.Based on the quantitative evaluation process of ESCO’s role in the development of our country’s existing building energysaving renovation market,it is necessary to scientifically understand the current status of ESCO’s driving role,and reveal the path to improve the efficiency of ESCO-driven development of the existing building’s energy-saving renovation market,in order to enhance the internal driving force of ESCO to promote.The existing building energy-saving renovation market is developing in a healthy and orderly manner.展开更多
The quality of the existing building energy-saving renovation market determines the inherent inevitability of incentive,while unique requirements for the incentive should be satisfied by stage characteristics and indi...The quality of the existing building energy-saving renovation market determines the inherent inevitability of incentive,while unique requirements for the incentive should be satisfied by stage characteristics and individualization of the three entities of the existing building energy-saving renovation market development.Firstly,the analysis of internal and external factors’composition and system influencing the existing construction market development incentive structure was performed.Then,system dynamics was implemented to build the feedback model of incentive effects of market development of existing buildings energy-saving reconstruction.Discussions on the realization path of the incentive for the development of the existing energy-saving building market were also pointed out.Finally,this paper conducted the analysis of the dynamic feedback characteristics and key incentive factors of the incentive for the development of the existing building energy-saving renovation market.Based on the analyses and discussions above,this paper provides methodological guidance and implementation approach for the incentive path selection and policy-making of the existing building energy-saving transformation market,trying to help improve the incentive effectiveness of the market,and also promote healthy and sustainable development of the existing building energy-saving renovation market.展开更多
The development of the existing building energy-saving transformation market is inseparable from the internal driving force of ESCO.Giving full play to the driving role of ESCO scientifically is the internal requireme...The development of the existing building energy-saving transformation market is inseparable from the internal driving force of ESCO.Giving full play to the driving role of ESCO scientifically is the internal requirement to promote the healthy and orderly operation of the existing building energy-saving transformation market.This paper summarizes the practical experience of developing ESCO driving force operation in foreign existing building energy-saving transformation market,analyzes the bottleneck of developing ESCO driving force operation in China’s existing building energy-saving transformation market,and puts forward useful practical enlightenment based on the comparison between home and abroad;According to the optimization principle of ESCO driving force operation in the development of existing building energy-saving transformation market,the optimization design framework of ESCO driving force is proposed,and the implementation strategy of ESCO driving force optimization in the development of existing building energy-saving transformation market is planned.In order to optimize and improve the effectiveness of the operation and development of the energy-saving transformation market of existing buildings with the internal driving force of ESCO.展开更多
The development of existing building energy saving reconstruction market depends on the interaction among service market, capital market and technology market. Analysis of the characteristics of both building energy-s...The development of existing building energy saving reconstruction market depends on the interaction among service market, capital market and technology market. Analysis of the characteristics of both building energy-saving service market, capital market and technology market, and analysis on the role of existing building energy saving reconstruction market development in energy conservation and emission reduction development strategy, energy-saving transformation policy implementation and promotion of other industries landing, will be conducive to energy-saving renovation of existing buildings market cultivation and development.展开更多
The dual functions of government participation and governance in the development of the existing building energy-saving renovation market determine the importance of the government’s scientific and effective actions....The dual functions of government participation and governance in the development of the existing building energy-saving renovation market determine the importance of the government’s scientific and effective actions.Continuously improving the government’s role is to promote the effective operation of the existing building energy-saving renovation market.Based on the inherent requirements of improving the government governance capacity in the development of the existing building energy-saving renovation market,this paper constructs the implementation path for the development of the existing building’s energy-saving renovation market from the three dimensions of practical concept,practical process and practical methods.From the four aspects of improving the legal and regulatory system,building a market information sharing platform,establishing a sound market supervision mechanism,and consolidating and improving the market accountability system,we will structure the existing building energysaving renovation market development to improve the government’s ability to restrain and implement measures.From the four levels of improving the market incentive mechanism,optimizing the market financing environment,clarifying the position of market resource allocation,and building a social operation platform,design measures to improve government incentives in the development of the existing building energy conservation renovation market.From the shaping of governance yuan organizational roles,governance capacity and responsibilities of departments at all levels to define boundaries,to build four main interactive platform governance perspective,the main parties demand balance the interests of both the governance capacity development planning in the government market,building energy-saving market to enhance the implementation of countermeasures.In order to promote the healthy and sustainable development of the existing building energy-saving renovation market based on the enhancement of government governance capacity.展开更多
The existing building energy-saving renovation project with quasi-public goods attributes has inherently defined the characteristics of market externality and information asymmetry, leading to the existing building en...The existing building energy-saving renovation project with quasi-public goods attributes has inherently defined the characteristics of market externality and information asymmetry, leading to the existing building energy-saving renovation market failure. Improve the existing building energy-saving market development guarantee system is the foundation of promoting market cultivation, and healthy development, which need to improve the legal system, rich incentive policies, clear quality standards and implement energy efficiency labeling.展开更多
基金supported by the National Natural Fund of China(Grant No.71872122)Later Stage Support Project of Philosophy and Social Sciences Research of the Ministry of Education of China(Grant No.16JHQ031)+1 种基金Later Stage Support Project of Tianjin Social Science Planning(Grant No.TJGLHQ1403)Higher Education Innovation Team of Tianjin(Grant No.TD13-5006)。
文摘The market development and policy matching of existing building energy-saving retrofits determine the effectiveness of policies in promoting the operation of existing building energy-saving retrofit market.Based on the perspective of market development to evaluate the effectiveness of existing building energy-saving transformation policy,it is necessary to clarify the basic connotation of the effectiveness of existing building energy-saving transformation policy,systematically analyze the evaluation content,construct a multi-level evaluation index system,and select scientific and effective quantitative evaluation methods to implement a strict evaluation process.
基金supported by the National Natural Science Foundation of China(Grant No.71872122)Late-stage Subsidy Project of Humanities and Social Sciences of the Ministry of Education of China(20JHQ095)Higher Education Innovation Team of Tianjin(TD13-5006).
文摘ESCO is the internal driving force for the development of the existing building energy-saving renovation market,and the driving effect of the ESCO market depends on scientific and effective comprehensive benefit evaluation.Based on analysis of the status qua at home and abroad,this paper reveals the necessity and value of research existing Building Energy Saving ESCO market development driving force effectiveness evaluation.The purpose of ESCO driving force benefit evaluation-oriented,establish the basic principles of evaluation index system of choice.Through the analysis of the evaluation content of the three dimensions of economic benefit,environmental benefit and social benefit,the comprehensive evaluation index system of the target level,criterion level and index level of the benefit evaluation of the existing building energy-saving renovation market development is constructed.AHP and fuzzy comprehensive evaluation of the combination,construct quantitative models of energy-saving drive ESCO market development role in the evaluation of the effectiveness of existing buildings.Based on the quantitative evaluation process of ESCO’s role in the development of our country’s existing building energysaving renovation market,it is necessary to scientifically understand the current status of ESCO’s driving role,and reveal the path to improve the efficiency of ESCO-driven development of the existing building’s energy-saving renovation market,in order to enhance the internal driving force of ESCO to promote.The existing building energy-saving renovation market is developing in a healthy and orderly manner.
基金supported by the National Natural Science Foundation of China(Grant No.71872122)Late-stage Subsidy Project of Humanities and Social Sciences of the Ministry of Education of China(Grant No.20JHQ095)+2 种基金Late-stage Subsidy Project of Humanities and Social Sciences of the Ministry of Education of China(Grant No.16JHQ031)Social Science Planning Later Project of Tianjin Province(Grant No.TJGLHQ1403)Higher Education Innovation Team of Tianjin(Grant No.TD13-5006)
文摘The quality of the existing building energy-saving renovation market determines the inherent inevitability of incentive,while unique requirements for the incentive should be satisfied by stage characteristics and individualization of the three entities of the existing building energy-saving renovation market development.Firstly,the analysis of internal and external factors’composition and system influencing the existing construction market development incentive structure was performed.Then,system dynamics was implemented to build the feedback model of incentive effects of market development of existing buildings energy-saving reconstruction.Discussions on the realization path of the incentive for the development of the existing energy-saving building market were also pointed out.Finally,this paper conducted the analysis of the dynamic feedback characteristics and key incentive factors of the incentive for the development of the existing building energy-saving renovation market.Based on the analyses and discussions above,this paper provides methodological guidance and implementation approach for the incentive path selection and policy-making of the existing building energy-saving transformation market,trying to help improve the incentive effectiveness of the market,and also promote healthy and sustainable development of the existing building energy-saving renovation market.
基金supported by the National Natural Science Foundation of China (Grant No.71872122)Late-stage Subsidy Project of Humanities and Social Sciences of the Education Department of China (Grant No. 20JHQ095)
文摘The development of the existing building energy-saving transformation market is inseparable from the internal driving force of ESCO.Giving full play to the driving role of ESCO scientifically is the internal requirement to promote the healthy and orderly operation of the existing building energy-saving transformation market.This paper summarizes the practical experience of developing ESCO driving force operation in foreign existing building energy-saving transformation market,analyzes the bottleneck of developing ESCO driving force operation in China’s existing building energy-saving transformation market,and puts forward useful practical enlightenment based on the comparison between home and abroad;According to the optimization principle of ESCO driving force operation in the development of existing building energy-saving transformation market,the optimization design framework of ESCO driving force is proposed,and the implementation strategy of ESCO driving force optimization in the development of existing building energy-saving transformation market is planned.In order to optimize and improve the effectiveness of the operation and development of the energy-saving transformation market of existing buildings with the internal driving force of ESCO.
基金supported by the National Natural Science Foundation of China (Grant No. 71573188)the Soft Science Research Project of Ministry of Housing and Urban - Rural Development (Grant No. 2013-R1-14)Tianjin Social Sciences Planning Post-funded Projects (Grant No. TJGLHQ1403)
文摘The development of existing building energy saving reconstruction market depends on the interaction among service market, capital market and technology market. Analysis of the characteristics of both building energy-saving service market, capital market and technology market, and analysis on the role of existing building energy saving reconstruction market development in energy conservation and emission reduction development strategy, energy-saving transformation policy implementation and promotion of other industries landing, will be conducive to energy-saving renovation of existing buildings market cultivation and development.
基金the National Natural Science Foundation of China(Grant No.71872122)Late-stage Subsidy Project of Humanities and Social Sciences of the Education Department of China(Grant No.20JHQ095)Higher Education Innovation Team of Tianjin(Grant No.TD13-5006)
文摘The dual functions of government participation and governance in the development of the existing building energy-saving renovation market determine the importance of the government’s scientific and effective actions.Continuously improving the government’s role is to promote the effective operation of the existing building energy-saving renovation market.Based on the inherent requirements of improving the government governance capacity in the development of the existing building energy-saving renovation market,this paper constructs the implementation path for the development of the existing building’s energy-saving renovation market from the three dimensions of practical concept,practical process and practical methods.From the four aspects of improving the legal and regulatory system,building a market information sharing platform,establishing a sound market supervision mechanism,and consolidating and improving the market accountability system,we will structure the existing building energysaving renovation market development to improve the government’s ability to restrain and implement measures.From the four levels of improving the market incentive mechanism,optimizing the market financing environment,clarifying the position of market resource allocation,and building a social operation platform,design measures to improve government incentives in the development of the existing building energy conservation renovation market.From the shaping of governance yuan organizational roles,governance capacity and responsibilities of departments at all levels to define boundaries,to build four main interactive platform governance perspective,the main parties demand balance the interests of both the governance capacity development planning in the government market,building energy-saving market to enhance the implementation of countermeasures.In order to promote the healthy and sustainable development of the existing building energy-saving renovation market based on the enhancement of government governance capacity.
基金supported by National Natural Science Foundation of China(Grant No.71171141)Soft Science Research Project of Ministry of Housing and Urban-Rural Development of the People’s Republic of China(Grant No.2013-R1-14)Social Science Planning Project in Tianjin City(Grant No.TJGLHQ1403)
文摘The existing building energy-saving renovation project with quasi-public goods attributes has inherently defined the characteristics of market externality and information asymmetry, leading to the existing building energy-saving renovation market failure. Improve the existing building energy-saving market development guarantee system is the foundation of promoting market cultivation, and healthy development, which need to improve the legal system, rich incentive policies, clear quality standards and implement energy efficiency labeling.