As the stiffness discontinuous of large diameter steel tube and concrete combined pile, the complicated stress state is caused by the combination of the pile foundation and the base rock, the steel casing and the bedr...As the stiffness discontinuous of large diameter steel tube and concrete combined pile, the complicated stress state is caused by the combination of the pile foundation and the base rock, the steel casing and the bedrock structure. It is needed to put forward a scientific basis to determine the pile foundation effective depth of embedded. For this purpose, the physical model and the numerical model of single pile with large diameter steel tube and reinforced concrete combined force are established. Through numerical simulation and contrast test of a large number of variable parameters, the various factors that affect the lateral bearing capacity of the embedded piles are discussed in detail, the mechanical properties of the foundation under the action of the steel tube and the pile foundation are obtained.展开更多
文摘As the stiffness discontinuous of large diameter steel tube and concrete combined pile, the complicated stress state is caused by the combination of the pile foundation and the base rock, the steel casing and the bedrock structure. It is needed to put forward a scientific basis to determine the pile foundation effective depth of embedded. For this purpose, the physical model and the numerical model of single pile with large diameter steel tube and reinforced concrete combined force are established. Through numerical simulation and contrast test of a large number of variable parameters, the various factors that affect the lateral bearing capacity of the embedded piles are discussed in detail, the mechanical properties of the foundation under the action of the steel tube and the pile foundation are obtained.