To improve the resilience of a distribution system against extreme weather,a fuel-based distributed generator(DG)allocation model is proposed in this study.In this model,the DGs are placed at the planning stage.When a...To improve the resilience of a distribution system against extreme weather,a fuel-based distributed generator(DG)allocation model is proposed in this study.In this model,the DGs are placed at the planning stage.When an extreme event occurs,the controllable generators form temporary microgrids(MGs)to restore the load maximally.Simultaneously,a demand response program(DRP)mitigates the imbalance between the power supply and demand during extreme events.To cope with the fault uncertainty,a robust optimization(RO)method is applied to reduce the long-term investment and short-term operation costs.The optimization is formulated as a tri-level defenderattacker-defender(DAD)framework.At the first level,decision-makers work out the DG allocation scheme;at the second level,the attacker finds the optimal attack strategy with maximum damage;and at the third level,restoration measures,namely distribution network reconfiguration(DNR)and demand response are performed.The problem is solved by the nested column and constraint generation(NC&CG)method and the model is validated using an IEEE 33-node system.Case studies validate the effectiveness and superiority of the proposed model according to the enhanced resilience and reduced cost.展开更多
We present a new approach based on honey-bee mating optimization to estimate the state variables in distribution networks including distributed generators. The proposed method considers practical models of electrical ...We present a new approach based on honey-bee mating optimization to estimate the state variables in distribution networks including distributed generators. The proposed method considers practical models of electrical equipments such as static var compensators, voltage regulators, and under-load tap changer transformers, which have usually nonlinear and discrete characteristics. The feasibility of the proposed approach is demonstrated by comparison with the methods based on neural networks, ant colony optimization, and genetic algorithms for two test systems, a network with 34-bus radial test feeders and a realistic 80-bus 20 kV network.展开更多
A consensus-based distributed control method of coordinated VSGs with communication time delays in isolate microgrid is proposed. When time delays are considered in communication, there are some effects on frequency r...A consensus-based distributed control method of coordinated VSGs with communication time delays in isolate microgrid is proposed. When time delays are considered in communication, there are some effects on frequency restoration and active power output allocation. In the control structure, only local information exchange is needed, while the final frequency can be controlled to the nominal value and the VSGs can automatically share loads according to their rated values. An AC microgrid with three VSGs and some loads is implemented. The proposed control strategy is verified by MATLAB/ Simulink simulation results.展开更多
In this paper,a fault location method for the petal-shaped distribution network(PSDN)with inverter-interfaced distributed generators(IIDGs)is proposed to shorten the time of manual inspection.In order to calculate the...In this paper,a fault location method for the petal-shaped distribution network(PSDN)with inverter-interfaced distributed generators(IIDGs)is proposed to shorten the time of manual inspection.In order to calculate the fault position,the closed-loop structure of the PSDN is skillfully exploited,and the common control strategies of IIDGs are considered.For asymmetrical faults,a fault line identification formula based on the negative-sequence current phase differences is presented,and a fault location formula only utilizing the negative-sequence current amplitudes is derived to calculated the fault position.For symmetrical faults,the positive-sequence current at both ends of lines and the current output from IIDGs are used to identify the fault line,and the positive-sequence current on multiple lines are used to pinpoint the fault position.In this method,corresponding current phasors are separated into amplitudes and phases to satisfy the limitation of communication level.The simulation results show that the error is generally less than 1%,and the accuracy of the proposed method is not affected by the fault type,fault position,fault resistance,load current,and the IIDG penetration.展开更多
In this paper a short-circuit computation(SCC) procedure for large-scale distribution systems with high penetration of distributed generators based on contemporary technologies is proposed. The procedure is suitable f...In this paper a short-circuit computation(SCC) procedure for large-scale distribution systems with high penetration of distributed generators based on contemporary technologies is proposed. The procedure is suitable for real-time calculations.Modeling of modern distributed generators differs from the modeling of traditional synchronous and induction generators.Hence, SCC procedures found on the presumption of distribution systems with only traditional generators are not suitable in nowadays systems. In the work presented in this paper, for computation of the state of the system with short-circuit, the improved backward/forward sweep(IBFS) procedure is used.Computation results show that the IBFS procedure is much more robust than previous SCC procedures, as it takes into account all distribution system elements, including modern distributed generators.展开更多
Installation of Distributed Generator (DG) is a well accepted method to improve power system operation from the point of reducing congestion and improving voltage profiles. For best results, Distributed Generators sho...Installation of Distributed Generator (DG) is a well accepted method to improve power system operation from the point of reducing congestion and improving voltage profiles. For best results, Distributed Generators should be placed at strategic locations to exploit maximum benefits out of them. The (N-1) contingency criterion has been taken into account in this work. Most congested lines of the grids are ranked by congestion Index and considered to study the impact of DG penetration on congestion. The present paper proposes contribution factors of Distributed Generators for the placement of DG to keep the line flow within the capacity of each transmission line of the network. The results obtained from IEEE 30-bus test system indicate that the proposed methods are capable of identifying desirable DG location and its maximum allowable size. The influence of DG on bus voltage profile has also been demonstrated in this paper.展开更多
A microgrid is hard to control due to its reduced inertia and increased uncertainties. To overcome the challenges of microgrid control, advanced controllers need to be developed.In this paper, a distributed, two-level...A microgrid is hard to control due to its reduced inertia and increased uncertainties. To overcome the challenges of microgrid control, advanced controllers need to be developed.In this paper, a distributed, two-level, communication-economic control scheme is presented for multiple-bus microgrids with each bus having multiple distributed generators(DGs) connected in parallel. The control objective of the upper level is to calculate the voltage references for one-bus subsystems. The objectives of the lower control level are to make the subsystems' bus voltages track the voltage references and to enhance load current sharing accuracy among the local DGs. Firstly, a distributed consensusbased power sharing algorithm is introduced to determine the power generations of the subsystems. Secondly, a discrete-time droop equation is used to adjust subsystem frequencies for voltage reference calculations. Finally, a Lyapunov-based decentralized control algorithm is designed for bus voltage regulation and proportional load current sharing. Extensive simulation studies with microgrid models of different levels of detail are performed to demonstrate the merits of the proposed control scheme.展开更多
In this paper, the authors analyze the influence that connection of many distributed generators (DGs) has on the harmonics of the distribution network from the viewpoints of harmonic current, harmonic voltage, and v...In this paper, the authors analyze the influence that connection of many distributed generators (DGs) has on the harmonics of the distribution network from the viewpoints of harmonic current, harmonic voltage, and voltage total harmonic distortion (THD), when it is assumed that the harmonic voltages or the harmonic currents in a distribution network increases by connection of many DGs through the inverters. The analysis on the influence of DGs is carried out by using a standard analytical model of distribution network with DGs based on the practical data. The authors evaluate quantitatively the influence which harmonics generated from DGs has on the harmonics of the distribution network, and analyze visually about propagation of harmonics within the distribution network. In addition, the authors also verify about the restraint effect of the harmonics in the network scale by the active filters installation.展开更多
This paper presents a powerful approach to find the optimal size and location of distributed generation units in a distribution system using GA (Genetic Optimization algorithm). It is proved that GA method is fast a...This paper presents a powerful approach to find the optimal size and location of distributed generation units in a distribution system using GA (Genetic Optimization algorithm). It is proved that GA method is fast and easy tool to enable the planners to select accurate and the optimum size of generators to improve the system voltage profile in addition to reduce the active and reactive power loss. GA fitness function is introduced including the active power losses, reactive power losses and the cumulative voltage deviation variables with selecting weight of each variable. GA fitness function is subjected to voltage constraints, active and reactive power losses constraints and DG size constraint.展开更多
This paper presents practical distribution system equipment models such as various distributed generators, voltage regulators, and loads for fast three phase unbalanced load flow calculation in distribution systems. T...This paper presents practical distribution system equipment models such as various distributed generators, voltage regulators, and loads for fast three phase unbalanced load flow calculation in distribution systems. The method can calculate voltage and current of distribution systems, in which distributed generators are introduced. The calculation time of the proposed method is about 40 times faster than that of the Newton-Raphson method. Moreover, an introduction effect evaluation tool for distributed generators using the proposed three phase unbalanced load flow calculation is presented. It provides various functions such as a power system network diagram creation function and a voltage profile chart display function. Therefore, the introduction effect evaluation of distributed generators in distribution systems can be evaluated quite easily.展开更多
To integrate different renewable energy resources effectively in a microgrid, a configuration optimization model of a multi-energy distributed generation(DG) system and its auxiliary equipment is proposed. The model...To integrate different renewable energy resources effectively in a microgrid, a configuration optimization model of a multi-energy distributed generation(DG) system and its auxiliary equipment is proposed. The model mainly consists of two parts, the determination of initial configuration schemes according to user preference and the selection of the optimal scheme. The comprehensive evaluation index(CEI), which is acquired through the analytic hierarchy process(AHP) weight calculation method, is adopted as the evaluation criterion to rank the initial schemes. The optimal scheme is obtained according to the ranking results. The proposed model takes the diversity of different equipment parameters and investment cost into consideration and can give relatively suitable and economical suggestions for system configuration.Additionally, unlike Homer Pro, the proposed model considers the complementation of different renewable energy resources, and thus the rationality of the multi-energy DG system is improved compared with the single evaluation criterion method which only considers the total cost.展开更多
In the current electricity paradigm, the rapid elevation of demands in industrial sector and the process of restructuring are the main causes for the overuse of transmission systems. Hence, the evolution of novel tech...In the current electricity paradigm, the rapid elevation of demands in industrial sector and the process of restructuring are the main causes for the overuse of transmission systems. Hence, the evolution of novel technology is the ultimate need to avoid the damages in the available transmission systems. An appreciable volume of renewable energy sources is used to produce electric power, after the implementation of deregulation in power system. Even though, they are intended to improve the reliability of power system, the unpredictable outages of generators or transmission lines, an impulsive increase in demand and the sudden failures of vital equipment cause transmission congestion in one or some transmission lines. Generation rescheduling and load shedding can be used to alleviate congestion, but some cases require quite few improved methods. With the extensive application of Distributed Generation (DG), congestion management is also performed by the optimal placement of DGs. Therefore, this research employs a Line Flow Sensitivity Factor (LFSF) and Particle Swarm Optimization (PSO) for the determination of optimal location and size of multiple DG units, respectively. This proposed problem is formulated to minimize the total system losses and real power flow performance index. This approach is experimented in modified IEEE-30 bus test system. The results of N-1 contingency analysis with DG units prove the competence of this proposed approach, since the total numbers of congested lines get reduced from 15 to 2. Hence, the results show that the proposed approach is robust and simple in alleviating transmission congestion by the optimal placement and sizing of multiple DG units.展开更多
The composite channel models of the generalized distributed antenna system (GDAS) such as Rayleigh-lognormal fading are studied. Then comparisons are performed between the GDAS and the traditional multiple-input mul...The composite channel models of the generalized distributed antenna system (GDAS) such as Rayleigh-lognormal fading are studied. Then comparisons are performed between the GDAS and the traditional multiple-input multiple-output (MIMO) system to analyze the ergodic capacity of the GDAS and make conclusions that it is impossible to achieve an analytical expression for the ergodic capacity of the GDAS. Moreover, in order to evaluate the performance of the ergodic capacity of the GDAS conveniently, the analytical lower bound and upper bound of the ergodic capacity of the GDAS are derived by using the results from multivariate statistics and matrix inequalities, under the scenarios of Rayleigh-lognormal fading and equal power allocation scheme at transmitter. Finally, the analytical bounds are verified by comparisons with the numerical results.展开更多
The rapid growth of distributed generator(DG)capacities has introduced additional controllable assets to improve the performance of distribution systems in terms of service restoration.Renewable DGs are of particular ...The rapid growth of distributed generator(DG)capacities has introduced additional controllable assets to improve the performance of distribution systems in terms of service restoration.Renewable DGs are of particular interest to utility companies,but the stochastic nature of intermittent renewable DGs could have a negative impact on the electric grid if they are not properly handled.In this study,we investigate distribution system service restoration using DGs as the primary power source,and we develop an effective approach to handle the uncertainty of renewable DGs under extreme conditions.The distribution system service restoration problem can be described as a mixed-integer second-order cone programming model by modifying the radial topology constraints and power flow equations.The uncertainty of renewable DGs will be modeled using a chance-constrained approach.Furthermore,the forecast errors and noises in real-time operation are solved using a novel model-free control algorithm that can automatically track the trajectory of real-time DG output.The proposed service restoration strategy and model-free control algorithm are validated using an IEEE 123-bus test system.展开更多
Spectrum distribution of the second order generalized distributed parameter system was discussed via the functional analysis and operator theory in Hilbert space. The solutions of the problem and the constructive expr...Spectrum distribution of the second order generalized distributed parameter system was discussed via the functional analysis and operator theory in Hilbert space. The solutions of the problem and the constructive expression of the solutions are given by the generalized inverse one of bounded linear operator. This is theoretically important for studying the stabilization and asymptotic stability of the second order generalized distributed parameter system.展开更多
Islanding detection is an essential function for safety and reliability in grid-connected distributed generation (DG) systems. Several methods for islanding detection are proposed, but most of them may fail under mult...Islanding detection is an essential function for safety and reliability in grid-connected distributed generation (DG) systems. Several methods for islanding detection are proposed, but most of them may fail under multi-source configurations, or they may produce important power quality degradation which gets worse with increasing DG penetration. This paper presents an active islanding detection algorithm for Voltage Source Inverter (VSI) based multi-source DG systems. The proposed method is based on the Voltage Positive Feedback (VPF) theory to generate a limited active power perturbation. Theoretical analyses were performed and simulations by MATLAB /Simulink /SimPowerSystems were used to evaluate the algorithm’s performance and its advantages concerning the time response and the effects on power quality, which turned out to be negligible. The algorithm performance was tested under critical conditions: load with unity power factor, load with high quality factor, and load matching DER’s powers.展开更多
Due to the increasing demand of energy and the need for nonconventional energy sources, distributed generation (DG) has come into play. The trend of unidirectional power flow has been gradually shifting. With new tech...Due to the increasing demand of energy and the need for nonconventional energy sources, distributed generation (DG) has come into play. The trend of unidirectional power flow has been gradually shifting. With new technology comes new challenges, the introduction of DG into the conventional power system brings various challenges;one of the major challenges is system protection under DG sources. These sources pose a significant challenge due to bidirectional flows from DGs as well as lower fault current contribution from inverter interfaced DGs. This paper reviews existing protection schemes that have been suggested for active distribution networks. Most of these protection strategies apply only to smaller distribution systems implying that they may need to be extended to larger systems with a much higher penetration of distributed generation. In the end, a potential protection scheme has also been recommended as a future work.展开更多
Distributed generation (DG) is the future of energy. This technology allows the bidirectional flow of power within an electrical network. Researchers are faced with many challenges to the accurate implementation of pr...Distributed generation (DG) is the future of energy. This technology allows the bidirectional flow of power within an electrical network. Researchers are faced with many challenges to the accurate implementation of protection schemes for DG-connected distribution network. The schemes designed must satisfy the performance requirements of selectivity, reliability, and sensitivity. Most researchers opine that conventional protection schemes based on over current detection are insufficient to completely and accurately protect a DG-connected distributed power system. There are many challenges?that?need to be tackled before embarking upon the journey to successfully implement these schemes. This paper summarizes the major challenges which one can encounter while designing protection schemes for DG-connected distribution networks. Some possible solutions from the literature are also mentioned. Moreover, a suggested solution for protecting future active distribution networks is provided. It is expected that this paper will act as a benchmark for future researchers in this field to tackle the challenges related to the protection of active distribution networks.展开更多
In this paper, the optimal variational generalized Nash equilibrium(v-GNE) seeking problem in merely monotone games with linearly coupled cost functions is investigated, in which the feasible strategy domain of each a...In this paper, the optimal variational generalized Nash equilibrium(v-GNE) seeking problem in merely monotone games with linearly coupled cost functions is investigated, in which the feasible strategy domain of each agent is coupled through an affine constraint. A distributed algorithm based on the hybrid steepest descent method is first proposed to seek the optimal v-GNE. Then, an accelerated algorithm with relaxation is proposed and analyzed, which has the potential to further improve the convergence speed to the optimal v-GNE. Some sufficient conditions in both algorithms are obtained to ensure the global convergence towards the optimal v-GNE. To illustrate the performance of the algorithms, numerical simulation is conducted based on a networked Nash-Cournot game with bounded market capacities.展开更多
Recently, the distributed generator (DG) has been successfully studied and applied in distribution system at many countries around the world. Many planning models of the DG integrated distribution system have been pro...Recently, the distributed generator (DG) has been successfully studied and applied in distribution system at many countries around the world. Many planning models of the DG integrated distribution system have been proposed. These models can choose the optimization locations, capacities and technologies of DG with the objective function minimizing power loss, investment costs or total life cycle costs of the investment project. However, capacity of DG that uses renewable energy resources is natural variability according to primary energy. This study proposed a planning model of optimized distribution system that integrates DG in the competitive electricity market. Model can determine equipment sizing and timeframe requiring for upgrading equipment of distribution system as well as select DG technologies with power variable constraints of DG. The objective function is minimizing total life cycle cost of the investment project. The proposed model is calculated and tested for a 48-bus radial distribution system in the GAMS programming language.展开更多
基金supported by the Technology Project of State Grid Jiangsu Electric Power Co.,Ltd.,China (J2022160,Research on Key Technologies of Distributed Power Dispatching Control for Resilience Improvement of Distribution Networks).
文摘To improve the resilience of a distribution system against extreme weather,a fuel-based distributed generator(DG)allocation model is proposed in this study.In this model,the DGs are placed at the planning stage.When an extreme event occurs,the controllable generators form temporary microgrids(MGs)to restore the load maximally.Simultaneously,a demand response program(DRP)mitigates the imbalance between the power supply and demand during extreme events.To cope with the fault uncertainty,a robust optimization(RO)method is applied to reduce the long-term investment and short-term operation costs.The optimization is formulated as a tri-level defenderattacker-defender(DAD)framework.At the first level,decision-makers work out the DG allocation scheme;at the second level,the attacker finds the optimal attack strategy with maximum damage;and at the third level,restoration measures,namely distribution network reconfiguration(DNR)and demand response are performed.The problem is solved by the nested column and constraint generation(NC&CG)method and the model is validated using an IEEE 33-node system.Case studies validate the effectiveness and superiority of the proposed model according to the enhanced resilience and reduced cost.
文摘We present a new approach based on honey-bee mating optimization to estimate the state variables in distribution networks including distributed generators. The proposed method considers practical models of electrical equipments such as static var compensators, voltage regulators, and under-load tap changer transformers, which have usually nonlinear and discrete characteristics. The feasibility of the proposed approach is demonstrated by comparison with the methods based on neural networks, ant colony optimization, and genetic algorithms for two test systems, a network with 34-bus radial test feeders and a realistic 80-bus 20 kV network.
文摘A consensus-based distributed control method of coordinated VSGs with communication time delays in isolate microgrid is proposed. When time delays are considered in communication, there are some effects on frequency restoration and active power output allocation. In the control structure, only local information exchange is needed, while the final frequency can be controlled to the nominal value and the VSGs can automatically share loads according to their rated values. An AC microgrid with three VSGs and some loads is implemented. The proposed control strategy is verified by MATLAB/ Simulink simulation results.
基金supported by State Grid Science and Technology Project:Research on Key Protection Technologies for New-type Urban Distribution Network with Controllable Sources and Loads(5100-201913019A-0-0-00).
文摘In this paper,a fault location method for the petal-shaped distribution network(PSDN)with inverter-interfaced distributed generators(IIDGs)is proposed to shorten the time of manual inspection.In order to calculate the fault position,the closed-loop structure of the PSDN is skillfully exploited,and the common control strategies of IIDGs are considered.For asymmetrical faults,a fault line identification formula based on the negative-sequence current phase differences is presented,and a fault location formula only utilizing the negative-sequence current amplitudes is derived to calculated the fault position.For symmetrical faults,the positive-sequence current at both ends of lines and the current output from IIDGs are used to identify the fault line,and the positive-sequence current on multiple lines are used to pinpoint the fault position.In this method,corresponding current phasors are separated into amplitudes and phases to satisfy the limitation of communication level.The simulation results show that the error is generally less than 1%,and the accuracy of the proposed method is not affected by the fault type,fault position,fault resistance,load current,and the IIDG penetration.
文摘In this paper a short-circuit computation(SCC) procedure for large-scale distribution systems with high penetration of distributed generators based on contemporary technologies is proposed. The procedure is suitable for real-time calculations.Modeling of modern distributed generators differs from the modeling of traditional synchronous and induction generators.Hence, SCC procedures found on the presumption of distribution systems with only traditional generators are not suitable in nowadays systems. In the work presented in this paper, for computation of the state of the system with short-circuit, the improved backward/forward sweep(IBFS) procedure is used.Computation results show that the IBFS procedure is much more robust than previous SCC procedures, as it takes into account all distribution system elements, including modern distributed generators.
文摘Installation of Distributed Generator (DG) is a well accepted method to improve power system operation from the point of reducing congestion and improving voltage profiles. For best results, Distributed Generators should be placed at strategic locations to exploit maximum benefits out of them. The (N-1) contingency criterion has been taken into account in this work. Most congested lines of the grids are ranked by congestion Index and considered to study the impact of DG penetration on congestion. The present paper proposes contribution factors of Distributed Generators for the placement of DG to keep the line flow within the capacity of each transmission line of the network. The results obtained from IEEE 30-bus test system indicate that the proposed methods are capable of identifying desirable DG location and its maximum allowable size. The influence of DG on bus voltage profile has also been demonstrated in this paper.
基金supported in part by the US Office of Naval Research(N00014-16-1-312,N00014-18-1-2185)in part by the National Natural Science Foundation of China(61673347,U1609214,61751205)
文摘A microgrid is hard to control due to its reduced inertia and increased uncertainties. To overcome the challenges of microgrid control, advanced controllers need to be developed.In this paper, a distributed, two-level, communication-economic control scheme is presented for multiple-bus microgrids with each bus having multiple distributed generators(DGs) connected in parallel. The control objective of the upper level is to calculate the voltage references for one-bus subsystems. The objectives of the lower control level are to make the subsystems' bus voltages track the voltage references and to enhance load current sharing accuracy among the local DGs. Firstly, a distributed consensusbased power sharing algorithm is introduced to determine the power generations of the subsystems. Secondly, a discrete-time droop equation is used to adjust subsystem frequencies for voltage reference calculations. Finally, a Lyapunov-based decentralized control algorithm is designed for bus voltage regulation and proportional load current sharing. Extensive simulation studies with microgrid models of different levels of detail are performed to demonstrate the merits of the proposed control scheme.
文摘In this paper, the authors analyze the influence that connection of many distributed generators (DGs) has on the harmonics of the distribution network from the viewpoints of harmonic current, harmonic voltage, and voltage total harmonic distortion (THD), when it is assumed that the harmonic voltages or the harmonic currents in a distribution network increases by connection of many DGs through the inverters. The analysis on the influence of DGs is carried out by using a standard analytical model of distribution network with DGs based on the practical data. The authors evaluate quantitatively the influence which harmonics generated from DGs has on the harmonics of the distribution network, and analyze visually about propagation of harmonics within the distribution network. In addition, the authors also verify about the restraint effect of the harmonics in the network scale by the active filters installation.
文摘This paper presents a powerful approach to find the optimal size and location of distributed generation units in a distribution system using GA (Genetic Optimization algorithm). It is proved that GA method is fast and easy tool to enable the planners to select accurate and the optimum size of generators to improve the system voltage profile in addition to reduce the active and reactive power loss. GA fitness function is introduced including the active power losses, reactive power losses and the cumulative voltage deviation variables with selecting weight of each variable. GA fitness function is subjected to voltage constraints, active and reactive power losses constraints and DG size constraint.
文摘This paper presents practical distribution system equipment models such as various distributed generators, voltage regulators, and loads for fast three phase unbalanced load flow calculation in distribution systems. The method can calculate voltage and current of distribution systems, in which distributed generators are introduced. The calculation time of the proposed method is about 40 times faster than that of the Newton-Raphson method. Moreover, an introduction effect evaluation tool for distributed generators using the proposed three phase unbalanced load flow calculation is presented. It provides various functions such as a power system network diagram creation function and a voltage profile chart display function. Therefore, the introduction effect evaluation of distributed generators in distribution systems can be evaluated quite easily.
基金The National Natural Science Foundation of China(No.51377021)the Science and Technology Project of State Grid Corporation of China(No.SGTJDK00DWJS1600014)
文摘To integrate different renewable energy resources effectively in a microgrid, a configuration optimization model of a multi-energy distributed generation(DG) system and its auxiliary equipment is proposed. The model mainly consists of two parts, the determination of initial configuration schemes according to user preference and the selection of the optimal scheme. The comprehensive evaluation index(CEI), which is acquired through the analytic hierarchy process(AHP) weight calculation method, is adopted as the evaluation criterion to rank the initial schemes. The optimal scheme is obtained according to the ranking results. The proposed model takes the diversity of different equipment parameters and investment cost into consideration and can give relatively suitable and economical suggestions for system configuration.Additionally, unlike Homer Pro, the proposed model considers the complementation of different renewable energy resources, and thus the rationality of the multi-energy DG system is improved compared with the single evaluation criterion method which only considers the total cost.
文摘In the current electricity paradigm, the rapid elevation of demands in industrial sector and the process of restructuring are the main causes for the overuse of transmission systems. Hence, the evolution of novel technology is the ultimate need to avoid the damages in the available transmission systems. An appreciable volume of renewable energy sources is used to produce electric power, after the implementation of deregulation in power system. Even though, they are intended to improve the reliability of power system, the unpredictable outages of generators or transmission lines, an impulsive increase in demand and the sudden failures of vital equipment cause transmission congestion in one or some transmission lines. Generation rescheduling and load shedding can be used to alleviate congestion, but some cases require quite few improved methods. With the extensive application of Distributed Generation (DG), congestion management is also performed by the optimal placement of DGs. Therefore, this research employs a Line Flow Sensitivity Factor (LFSF) and Particle Swarm Optimization (PSO) for the determination of optimal location and size of multiple DG units, respectively. This proposed problem is formulated to minimize the total system losses and real power flow performance index. This approach is experimented in modified IEEE-30 bus test system. The results of N-1 contingency analysis with DG units prove the competence of this proposed approach, since the total numbers of congested lines get reduced from 15 to 2. Hence, the results show that the proposed approach is robust and simple in alleviating transmission congestion by the optimal placement and sizing of multiple DG units.
基金Foundation item:The National Natural Science Foundation of China(No.60496311)
文摘The composite channel models of the generalized distributed antenna system (GDAS) such as Rayleigh-lognormal fading are studied. Then comparisons are performed between the GDAS and the traditional multiple-input multiple-output (MIMO) system to analyze the ergodic capacity of the GDAS and make conclusions that it is impossible to achieve an analytical expression for the ergodic capacity of the GDAS. Moreover, in order to evaluate the performance of the ergodic capacity of the GDAS conveniently, the analytical lower bound and upper bound of the ergodic capacity of the GDAS are derived by using the results from multivariate statistics and matrix inequalities, under the scenarios of Rayleigh-lognormal fading and equal power allocation scheme at transmitter. Finally, the analytical bounds are verified by comparisons with the numerical results.
基金the National Renewable Energy Laboratory(NREL)operated by Alliance for Sustainable Energy,LLC,for the U.S.Department of Energy(DOE)under Contract No.DE-AC36-08GO28308the U.S.Department of Energy Office of Electricity AOP Distribution Grid Resilience Project.The views expressed in the article do not necessarily represent the views of the DOE or the U.S.Government.The U.S.Government retains and the publisher,by accepting the article for publication,acknowledges that the U.S.Government retains a nonexclusive,paid-up,irrevocable,worldwide license to publish or reproduce the published form of this work,or allow others to do so,for U.S.Government purposes.
文摘The rapid growth of distributed generator(DG)capacities has introduced additional controllable assets to improve the performance of distribution systems in terms of service restoration.Renewable DGs are of particular interest to utility companies,but the stochastic nature of intermittent renewable DGs could have a negative impact on the electric grid if they are not properly handled.In this study,we investigate distribution system service restoration using DGs as the primary power source,and we develop an effective approach to handle the uncertainty of renewable DGs under extreme conditions.The distribution system service restoration problem can be described as a mixed-integer second-order cone programming model by modifying the radial topology constraints and power flow equations.The uncertainty of renewable DGs will be modeled using a chance-constrained approach.Furthermore,the forecast errors and noises in real-time operation are solved using a novel model-free control algorithm that can automatically track the trajectory of real-time DG output.The proposed service restoration strategy and model-free control algorithm are validated using an IEEE 123-bus test system.
文摘Spectrum distribution of the second order generalized distributed parameter system was discussed via the functional analysis and operator theory in Hilbert space. The solutions of the problem and the constructive expression of the solutions are given by the generalized inverse one of bounded linear operator. This is theoretically important for studying the stabilization and asymptotic stability of the second order generalized distributed parameter system.
文摘Islanding detection is an essential function for safety and reliability in grid-connected distributed generation (DG) systems. Several methods for islanding detection are proposed, but most of them may fail under multi-source configurations, or they may produce important power quality degradation which gets worse with increasing DG penetration. This paper presents an active islanding detection algorithm for Voltage Source Inverter (VSI) based multi-source DG systems. The proposed method is based on the Voltage Positive Feedback (VPF) theory to generate a limited active power perturbation. Theoretical analyses were performed and simulations by MATLAB /Simulink /SimPowerSystems were used to evaluate the algorithm’s performance and its advantages concerning the time response and the effects on power quality, which turned out to be negligible. The algorithm performance was tested under critical conditions: load with unity power factor, load with high quality factor, and load matching DER’s powers.
文摘Due to the increasing demand of energy and the need for nonconventional energy sources, distributed generation (DG) has come into play. The trend of unidirectional power flow has been gradually shifting. With new technology comes new challenges, the introduction of DG into the conventional power system brings various challenges;one of the major challenges is system protection under DG sources. These sources pose a significant challenge due to bidirectional flows from DGs as well as lower fault current contribution from inverter interfaced DGs. This paper reviews existing protection schemes that have been suggested for active distribution networks. Most of these protection strategies apply only to smaller distribution systems implying that they may need to be extended to larger systems with a much higher penetration of distributed generation. In the end, a potential protection scheme has also been recommended as a future work.
文摘Distributed generation (DG) is the future of energy. This technology allows the bidirectional flow of power within an electrical network. Researchers are faced with many challenges to the accurate implementation of protection schemes for DG-connected distribution network. The schemes designed must satisfy the performance requirements of selectivity, reliability, and sensitivity. Most researchers opine that conventional protection schemes based on over current detection are insufficient to completely and accurately protect a DG-connected distributed power system. There are many challenges?that?need to be tackled before embarking upon the journey to successfully implement these schemes. This paper summarizes the major challenges which one can encounter while designing protection schemes for DG-connected distribution networks. Some possible solutions from the literature are also mentioned. Moreover, a suggested solution for protecting future active distribution networks is provided. It is expected that this paper will act as a benchmark for future researchers in this field to tackle the challenges related to the protection of active distribution networks.
基金supported by the National Natural Science Foundation of China(Basic Science Center Program)(61988101)the Joint Fund of Ministry of Education for Equipment Pre-research (8091B022234)+3 种基金Shanghai International Science and Technology Cooperation Program (21550712400)Shanghai Pilot Program for Basic Research (22TQ1400100-3)the Fundamental Research Funds for the Central UniversitiesShanghai Artifcial Intelligence Laboratory。
文摘In this paper, the optimal variational generalized Nash equilibrium(v-GNE) seeking problem in merely monotone games with linearly coupled cost functions is investigated, in which the feasible strategy domain of each agent is coupled through an affine constraint. A distributed algorithm based on the hybrid steepest descent method is first proposed to seek the optimal v-GNE. Then, an accelerated algorithm with relaxation is proposed and analyzed, which has the potential to further improve the convergence speed to the optimal v-GNE. Some sufficient conditions in both algorithms are obtained to ensure the global convergence towards the optimal v-GNE. To illustrate the performance of the algorithms, numerical simulation is conducted based on a networked Nash-Cournot game with bounded market capacities.
文摘Recently, the distributed generator (DG) has been successfully studied and applied in distribution system at many countries around the world. Many planning models of the DG integrated distribution system have been proposed. These models can choose the optimization locations, capacities and technologies of DG with the objective function minimizing power loss, investment costs or total life cycle costs of the investment project. However, capacity of DG that uses renewable energy resources is natural variability according to primary energy. This study proposed a planning model of optimized distribution system that integrates DG in the competitive electricity market. Model can determine equipment sizing and timeframe requiring for upgrading equipment of distribution system as well as select DG technologies with power variable constraints of DG. The objective function is minimizing total life cycle cost of the investment project. The proposed model is calculated and tested for a 48-bus radial distribution system in the GAMS programming language.