With the introduction of the“dual carbon goals,”there has been a robust development of distributed photovoltaic power generation projects in the promotion of their construction.As part of this initiative,a comprehen...With the introduction of the“dual carbon goals,”there has been a robust development of distributed photovoltaic power generation projects in the promotion of their construction.As part of this initiative,a comprehensive and systematic analysis has been conducted to study the overall benefits of photovoltaic power generation projects.The evaluation process encompasses economic,technical,environmental,and social aspects,providing corresponding analysis methods and data references.Furthermore,targeted countermeasures and suggestions are proposed,signifying the research’s importance for the construction and development of subsequent distributed photovoltaic power generation projects.展开更多
This paper presents a comprehensive study that includes the sizing and power flow by series and parallel inverters in a distributed generation system(DGs)that integrates the system of hybrid wind photovoltaic with a u...This paper presents a comprehensive study that includes the sizing and power flow by series and parallel inverters in a distributed generation system(DGs)that integrates the system of hybrid wind photovoltaic with a unified power quality conditioner(UPQC).In addition to supplying active power to the utility grid,the system of hybrid wind photovoltaic functions as a UPQC,compensating reactive power and suppressing the harmonic load currents.Additionally,the load is supplied with harmonic-free,balanced and regulated output voltages.Since PVWind-UPQC is established on a dual compensation scheme,the series inverter works like a sinusoidal current source,while the parallel inverter works like a sinusoidal voltage source.Consequently,a smooth alteration from interconnected operating modes to island operating modes and vice versa can be achieved without load voltage transients.Since PV-Wind-UPQC inverters handle the energy generated through the hybrid wind photovoltaic system and the energy demanded through the load,the converters should be sized cautiously.A detailed study of the flow of power via the PV-Wind-UPQC is imperative to gain a complete understanding of the system operation and the proper design of the converters.Thus,curves that allow the sizing of the power converters according to the power flow via the converters are presented and discussed.Simulation results are presented to assess both steady state and dynamic performances of the grid connected hybrid system of PV-Wind-UPQC.This investigation is verified by simulating and analyzing the results with Matlab/Simulink.展开更多
The analysis of the loss of distributed photovoltaic power generation systems involves the interests of energy users,energy-saving service companies,and power grid companies,so it has always been the focus of the indu...The analysis of the loss of distributed photovoltaic power generation systems involves the interests of energy users,energy-saving service companies,and power grid companies,so it has always been the focus of the industry and society in some manner or another.However,the related analysis for an actual case that considers different cooperative corporations’benefits is lacking in the presently available literature.This paper takes the distributed rooftop photovoltaic power generation project in an industrial park as the object,studies the analysis and calculation methods of line loss and transformer loss,analyzes the change of transformer loss under different temperatures and different load rates,and compares the data and trend of electricity consumption and power generation in industrial parks before and after the photovoltaic operation.This paper explores and practices the analysis method of the operating loss of distributed photovoltaic power generation and provides an essential reference for the benefit analysis and investment cost estimation of distributed photovoltaic power generation systems in industrial parks.The analyzed results reveal that the change loss is stable after the photovoltaic is connected,and there is no additional transformer loss.And before and after the photovoltaic system installation,there was no significant change in the total monthly data difference between the total meter and the sub-meter.展开更多
In the context of clean and Low-carbon energy transformation and new power system,China^photovoltaic power generation will usher in great development.Its large-scale access impacts the safe and stable operation of the...In the context of clean and Low-carbon energy transformation and new power system,China^photovoltaic power generation will usher in great development.Its large-scale access impacts the safe and stable operation of the power grid with increasing significance.In order to strengthen the support and Leading roles of the standards,it is urgent to revise the national standard GB/T 29319-2012,Technical requirements for connecting photovoltaic power system to distribution network,based on the current development trend of photovoltaic power generation and power grid transformation needs.This paper firstly interprets the important technical provisions of the standard,then analyzes the problems in its implementation and finally proposes some revision suggestions in terms of grid adaptability,power control and fault crossing,to facilitate safe and orderly development of photovoltaic power generation in China.展开更多
The rapid spreading of the Photovoltaic (PV) Systems as Distributed Generation (DG) in medium and low voltage networks created many effects and changes on the existing power system networks. In this work, two methods ...The rapid spreading of the Photovoltaic (PV) Systems as Distributed Generation (DG) in medium and low voltage networks created many effects and changes on the existing power system networks. In this work, two methods have been used and applied to determine the optimal allocation and sizing of the PV to be installed as DGs (ranging from 250 kW up to 3 MW). The first one is to determine the location according to the maximal power losses reduction over the feeder. The second one is by using the Harmony Search Algorithm which is claimed to be a powerful technique for optimal allocation of PV systems. The results of the two techniques were compared and found to be nearly closed. Furthermore, investigation on the effects on the feeder in terms of voltage levels, power factor readings, and short circuit current levels has been done. All calculations and simulations are conducted by using the MATLAB Simulation Program. Some field calculations and observations have been expended in order to substantiate the research findings and validation.展开更多
As the share of photovoltaic power generation in power system has increased year by year, the optimization choice of access system schemes become one of the first and most important problems in grid before admitting p...As the share of photovoltaic power generation in power system has increased year by year, the optimization choice of access system schemes become one of the first and most important problems in grid before admitting photovoltaic power generation. Therefore, this article takes a proposed distributed photovoltaic as an example to research and analyze two kinds of high density multiple access points distributed photovoltaic access system schemes. The emphasis is making a comprehensive comparison and selection among the aspect of active power loss and economic benefit, etc. In the premise of ensuring the normal power generation of the photovoltaic system, it puts forward the recommended scheme that can help to spontaneous self-consumption, elimination on the spot, effectively decrease network loss and economic benefit.展开更多
In the future, the power quality will decrease by the introduction of a lot of renewable energy sources. The topic of this research is a new method of operation of PCS (power conditioning systems) in the future dist...In the future, the power quality will decrease by the introduction of a lot of renewable energy sources. The topic of this research is a new method of operation of PCS (power conditioning systems) in the future distribution system. The purpose of this research is development of PCS with a function of improvement of the distribution system. Therefore, the authors propose a method of the power quality improvement of the distribution system by PCS. In addition, the authors construct the control logic to use in PCS The control logic suggests adding harmonic restraint function to conventional control. These were verified by simulation and an experiment. As the results, we confirmed that basic operation of PCS being carried out, harmonics were restrained, and power quality had improved.展开更多
Recently, the number of system interconnection of the renewable energy such as PV (photovoltaic) generation system and wind power generation system has been increasing drastically. A distribution system with the dis...Recently, the number of system interconnection of the renewable energy such as PV (photovoltaic) generation system and wind power generation system has been increasing drastically. A distribution system with the distributed generation must be operated keeping reliability of power supply and power quality. When high-capacity PV systems are interconnected to the distribution system, the system voltages may be deviated from the upper limit or lower limit of proper voltage in the distribution system. In this study, the authors propose a cooperative voltage control method of the distribution system by the power factor control of plural residential PV systems. In order to verify the validity of the proposal method, the numerical calculations are carried out by using an analytical model of distribution system which interconnected residential PV systems.展开更多
Distribution system analysis(DSA)currently faces several challenges due to inclusion of distributed energy resources(DERs),which have many characteristics,such as inherent variability,uncertainty,possibility of flexib...Distribution system analysis(DSA)currently faces several challenges due to inclusion of distributed energy resources(DERs),which have many characteristics,such as inherent variability,uncertainty,possibility of flexible four quadrant converter operations with distributed generation(DG),and the need for efficient operations to improve reliability of the supply system.This article argues for a high degree of case-specificity and discusses its implications in distribution networks with increasing DG penetration.The research is based on the exhaustive yearly simulation analyses of 132 candidate scenarios and investigates the effects of feeder-specific factors,such as geo-electric size and feeder spread,load density,and phase unbalancing.Nineteen(19)feeder variants—with phase-domain detailed modeling of all feeder components,including DGs,are subjected to increasing penetration of photovoltaic generation without altering the type and location of DGs.The objective is to analyze the role of feederspecific factors on feeder response characteristics in terms of annualized operational parameters,such as energy losses,feeder voltage profile,average power factor,and peak demand at a substation node,as well as tap-changer operations of voltage regulating equipment and their interaction with shunt compensation.Recorded annual load profiles—industrial,commercial,and residential—as well as location specific weather data are used to simulate the candidate scenarios based on three IEEE test feeders and one actual spot network in India.Results signify the consideration of feeder-specific factors in the planning exercise of grouping“similar”feeders for formulating the strategies that can improve daily operations of distribution feeders.The demonstrated case-specificity also implies that optimization algorithms for improved operations with DGs will need to be based on an integrated approach that accounts for feeder-specific factors as well as cyclic variability of DERs.展开更多
With the growing number and capacity of photovoltaic(PV)installations connected to distribution networks,power quality issues related to voltage regulation are becoming relevant problems for power distribution compani...With the growing number and capacity of photovoltaic(PV)installations connected to distribution networks,power quality issues related to voltage regulation are becoming relevant problems for power distribution companies and for PV owners.In many countries,like Italy,this has required the revision of the standards concerning the connection to the public distribution network of distributed renewable generation.The new standards require a flexible operation of generation plants that have to be capable to change the active and reactive power dynamically in function of the network parameters(i.e.frequency and network local voltage)in local control or following external commands.Therefore,this paper investigates the use of smart inverter in a critical PV installation,where relevant voltage fluctuations exist.A case study,with real network parameters monitoring data and measurements,is discussed in the paper with the aim of showing how‘smart’features of new inverters can be implemented to increase PV plant integration in low voltage distribution networks.展开更多
Operating in island mode when failure occurs in sure to maintain an uninterrupted power supply to significant loads. A two-stage approach that integrates optimal island partition and power dispatch is proposed in this...Operating in island mode when failure occurs in sure to maintain an uninterrupted power supply to significant loads. A two-stage approach that integrates optimal island partition and power dispatch is proposed in this paper, considering photovoltaics(PVs), batteries(BEs) and electric vehicles(EVs) as the power sources. In the first stage, energy indices are defined to describe the energy demand and the maximum energy that these distributed energy resources(DERs) can provide, and islands are partitioned based on an energy constraint. Considering the variability the loads and PVs, the energy constraint is a necessary but not sufficient condition for island operation,so in the second stage, a power dispatch model is proposed the active distribution network(ADN) is an effective mea-as a test for the island partition result. Sequential power flow is also simulated to guarantee a feasible and optimized island status. The situations when the tests are not passed are analyzed and classified, and corresponding modifications for the first stage model are provided. Multiple levels of constraints based on the energy index are established for the island partition model. The proposed approach has been validated through simulation using a modified IEEE 69-bus system which is divided into three districts with different load variability characteristics.展开更多
As interest in the distributed generation of solar power system in a building fa c,ade continues to increase,its technical performance(i.e.the amount of electricity generation)should be carefully investigated before i...As interest in the distributed generation of solar power system in a building fa c,ade continues to increase,its technical performance(i.e.the amount of electricity generation)should be carefully investigated before its implementation.In this regard,this study aimed to develop the nine-node-based finite element model for estimating the technical performance of the distributed generation of solar power system in a building fa c,ade(FEM9-node),focusing on the improvement of the prediction performance.The developed model(FEM9-node)was proven to be superior to the four-node-based model(FEM4-node),which was developed in the previous study,in terms of both prediction accuracy and standard deviation.In other words,the prediction accuracy(3.55%)and standard deviation(2.93%)of the developed model(FEM9-node)was determined to be superior to those of the previous model(FEM4-node)(i.e.4.54%and 4.39%,respectively).The practical application was carried out to enable a decision maker(e.g.construction manager,facility manager)to understand how the developed model works in a clear way.It is expected that the developed model(FEM9-node)can be used in the early design phase in an easy way within a short time.In addition,it could be extended to any other countries in a global environment.展开更多
文摘With the introduction of the“dual carbon goals,”there has been a robust development of distributed photovoltaic power generation projects in the promotion of their construction.As part of this initiative,a comprehensive and systematic analysis has been conducted to study the overall benefits of photovoltaic power generation projects.The evaluation process encompasses economic,technical,environmental,and social aspects,providing corresponding analysis methods and data references.Furthermore,targeted countermeasures and suggestions are proposed,signifying the research’s importance for the construction and development of subsequent distributed photovoltaic power generation projects.
文摘This paper presents a comprehensive study that includes the sizing and power flow by series and parallel inverters in a distributed generation system(DGs)that integrates the system of hybrid wind photovoltaic with a unified power quality conditioner(UPQC).In addition to supplying active power to the utility grid,the system of hybrid wind photovoltaic functions as a UPQC,compensating reactive power and suppressing the harmonic load currents.Additionally,the load is supplied with harmonic-free,balanced and regulated output voltages.Since PVWind-UPQC is established on a dual compensation scheme,the series inverter works like a sinusoidal current source,while the parallel inverter works like a sinusoidal voltage source.Consequently,a smooth alteration from interconnected operating modes to island operating modes and vice versa can be achieved without load voltage transients.Since PV-Wind-UPQC inverters handle the energy generated through the hybrid wind photovoltaic system and the energy demanded through the load,the converters should be sized cautiously.A detailed study of the flow of power via the PV-Wind-UPQC is imperative to gain a complete understanding of the system operation and the proper design of the converters.Thus,curves that allow the sizing of the power converters according to the power flow via the converters are presented and discussed.Simulation results are presented to assess both steady state and dynamic performances of the grid connected hybrid system of PV-Wind-UPQC.This investigation is verified by simulating and analyzing the results with Matlab/Simulink.
基金supported by the State Grid Corporation of China Science and Technology Project(5216AG21000 K).
文摘The analysis of the loss of distributed photovoltaic power generation systems involves the interests of energy users,energy-saving service companies,and power grid companies,so it has always been the focus of the industry and society in some manner or another.However,the related analysis for an actual case that considers different cooperative corporations’benefits is lacking in the presently available literature.This paper takes the distributed rooftop photovoltaic power generation project in an industrial park as the object,studies the analysis and calculation methods of line loss and transformer loss,analyzes the change of transformer loss under different temperatures and different load rates,and compares the data and trend of electricity consumption and power generation in industrial parks before and after the photovoltaic operation.This paper explores and practices the analysis method of the operating loss of distributed photovoltaic power generation and provides an essential reference for the benefit analysis and investment cost estimation of distributed photovoltaic power generation systems in industrial parks.The analyzed results reveal that the change loss is stable after the photovoltaic is connected,and there is no additional transformer loss.And before and after the photovoltaic system installation,there was no significant change in the total monthly data difference between the total meter and the sub-meter.
文摘In the context of clean and Low-carbon energy transformation and new power system,China^photovoltaic power generation will usher in great development.Its large-scale access impacts the safe and stable operation of the power grid with increasing significance.In order to strengthen the support and Leading roles of the standards,it is urgent to revise the national standard GB/T 29319-2012,Technical requirements for connecting photovoltaic power system to distribution network,based on the current development trend of photovoltaic power generation and power grid transformation needs.This paper firstly interprets the important technical provisions of the standard,then analyzes the problems in its implementation and finally proposes some revision suggestions in terms of grid adaptability,power control and fault crossing,to facilitate safe and orderly development of photovoltaic power generation in China.
文摘The rapid spreading of the Photovoltaic (PV) Systems as Distributed Generation (DG) in medium and low voltage networks created many effects and changes on the existing power system networks. In this work, two methods have been used and applied to determine the optimal allocation and sizing of the PV to be installed as DGs (ranging from 250 kW up to 3 MW). The first one is to determine the location according to the maximal power losses reduction over the feeder. The second one is by using the Harmony Search Algorithm which is claimed to be a powerful technique for optimal allocation of PV systems. The results of the two techniques were compared and found to be nearly closed. Furthermore, investigation on the effects on the feeder in terms of voltage levels, power factor readings, and short circuit current levels has been done. All calculations and simulations are conducted by using the MATLAB Simulation Program. Some field calculations and observations have been expended in order to substantiate the research findings and validation.
文摘As the share of photovoltaic power generation in power system has increased year by year, the optimization choice of access system schemes become one of the first and most important problems in grid before admitting photovoltaic power generation. Therefore, this article takes a proposed distributed photovoltaic as an example to research and analyze two kinds of high density multiple access points distributed photovoltaic access system schemes. The emphasis is making a comprehensive comparison and selection among the aspect of active power loss and economic benefit, etc. In the premise of ensuring the normal power generation of the photovoltaic system, it puts forward the recommended scheme that can help to spontaneous self-consumption, elimination on the spot, effectively decrease network loss and economic benefit.
文摘In the future, the power quality will decrease by the introduction of a lot of renewable energy sources. The topic of this research is a new method of operation of PCS (power conditioning systems) in the future distribution system. The purpose of this research is development of PCS with a function of improvement of the distribution system. Therefore, the authors propose a method of the power quality improvement of the distribution system by PCS. In addition, the authors construct the control logic to use in PCS The control logic suggests adding harmonic restraint function to conventional control. These were verified by simulation and an experiment. As the results, we confirmed that basic operation of PCS being carried out, harmonics were restrained, and power quality had improved.
文摘Recently, the number of system interconnection of the renewable energy such as PV (photovoltaic) generation system and wind power generation system has been increasing drastically. A distribution system with the distributed generation must be operated keeping reliability of power supply and power quality. When high-capacity PV systems are interconnected to the distribution system, the system voltages may be deviated from the upper limit or lower limit of proper voltage in the distribution system. In this study, the authors propose a cooperative voltage control method of the distribution system by the power factor control of plural residential PV systems. In order to verify the validity of the proposal method, the numerical calculations are carried out by using an analytical model of distribution system which interconnected residential PV systems.
基金This work was supported in part by Indian Institute of Technology Gandhinagar in the form of“Additional Fellowship”to Kalpesh Joshi.
文摘Distribution system analysis(DSA)currently faces several challenges due to inclusion of distributed energy resources(DERs),which have many characteristics,such as inherent variability,uncertainty,possibility of flexible four quadrant converter operations with distributed generation(DG),and the need for efficient operations to improve reliability of the supply system.This article argues for a high degree of case-specificity and discusses its implications in distribution networks with increasing DG penetration.The research is based on the exhaustive yearly simulation analyses of 132 candidate scenarios and investigates the effects of feeder-specific factors,such as geo-electric size and feeder spread,load density,and phase unbalancing.Nineteen(19)feeder variants—with phase-domain detailed modeling of all feeder components,including DGs,are subjected to increasing penetration of photovoltaic generation without altering the type and location of DGs.The objective is to analyze the role of feederspecific factors on feeder response characteristics in terms of annualized operational parameters,such as energy losses,feeder voltage profile,average power factor,and peak demand at a substation node,as well as tap-changer operations of voltage regulating equipment and their interaction with shunt compensation.Recorded annual load profiles—industrial,commercial,and residential—as well as location specific weather data are used to simulate the candidate scenarios based on three IEEE test feeders and one actual spot network in India.Results signify the consideration of feeder-specific factors in the planning exercise of grouping“similar”feeders for formulating the strategies that can improve daily operations of distribution feeders.The demonstrated case-specificity also implies that optimization algorithms for improved operations with DGs will need to be based on an integrated approach that accounts for feeder-specific factors as well as cyclic variability of DERs.
文摘With the growing number and capacity of photovoltaic(PV)installations connected to distribution networks,power quality issues related to voltage regulation are becoming relevant problems for power distribution companies and for PV owners.In many countries,like Italy,this has required the revision of the standards concerning the connection to the public distribution network of distributed renewable generation.The new standards require a flexible operation of generation plants that have to be capable to change the active and reactive power dynamically in function of the network parameters(i.e.frequency and network local voltage)in local control or following external commands.Therefore,this paper investigates the use of smart inverter in a critical PV installation,where relevant voltage fluctuations exist.A case study,with real network parameters monitoring data and measurements,is discussed in the paper with the aim of showing how‘smart’features of new inverters can be implemented to increase PV plant integration in low voltage distribution networks.
基金supported in part by the National Science Foundation of China(No.51477029)the National Science and Technology Support Program of China(No.2015BAA01B01)the State Grid Corporation of China(No.SGTYHT/14-JS-188)
文摘Operating in island mode when failure occurs in sure to maintain an uninterrupted power supply to significant loads. A two-stage approach that integrates optimal island partition and power dispatch is proposed in this paper, considering photovoltaics(PVs), batteries(BEs) and electric vehicles(EVs) as the power sources. In the first stage, energy indices are defined to describe the energy demand and the maximum energy that these distributed energy resources(DERs) can provide, and islands are partitioned based on an energy constraint. Considering the variability the loads and PVs, the energy constraint is a necessary but not sufficient condition for island operation,so in the second stage, a power dispatch model is proposed the active distribution network(ADN) is an effective mea-as a test for the island partition result. Sequential power flow is also simulated to guarantee a feasible and optimized island status. The situations when the tests are not passed are analyzed and classified, and corresponding modifications for the first stage model are provided. Multiple levels of constraints based on the energy index are established for the island partition model. The proposed approach has been validated through simulation using a modified IEEE 69-bus system which is divided into three districts with different load variability characteristics.
文摘As interest in the distributed generation of solar power system in a building fa c,ade continues to increase,its technical performance(i.e.the amount of electricity generation)should be carefully investigated before its implementation.In this regard,this study aimed to develop the nine-node-based finite element model for estimating the technical performance of the distributed generation of solar power system in a building fa c,ade(FEM9-node),focusing on the improvement of the prediction performance.The developed model(FEM9-node)was proven to be superior to the four-node-based model(FEM4-node),which was developed in the previous study,in terms of both prediction accuracy and standard deviation.In other words,the prediction accuracy(3.55%)and standard deviation(2.93%)of the developed model(FEM9-node)was determined to be superior to those of the previous model(FEM4-node)(i.e.4.54%and 4.39%,respectively).The practical application was carried out to enable a decision maker(e.g.construction manager,facility manager)to understand how the developed model works in a clear way.It is expected that the developed model(FEM9-node)can be used in the early design phase in an easy way within a short time.In addition,it could be extended to any other countries in a global environment.