期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Multi-objective planning model for simultaneous reconfiguration of power distribution network and allocation of renewable energy resources and capacitors with considering uncertainties 被引量:9
1
作者 Sajad Najafi Ravadanegh Mohammad Reza Jannati Oskuee Masoumeh Karimi 《Journal of Central South University》 SCIE EI CAS CSCD 2017年第8期1837-1849,共13页
This research develops a comprehensive method to solve a combinatorial problem consisting of distribution system reconfiguration, capacitor allocation, and renewable energy resources sizing and siting simultaneously a... This research develops a comprehensive method to solve a combinatorial problem consisting of distribution system reconfiguration, capacitor allocation, and renewable energy resources sizing and siting simultaneously and to improve power system's accountability and system performance parameters. Due to finding solution which is closer to realistic characteristics, load forecasting, market price errors and the uncertainties related to the variable output power of wind based DG units are put in consideration. This work employs NSGA-II accompanied by the fuzzy set theory to solve the aforementioned multi-objective problem. The proposed scheme finally leads to a solution with a minimum voltage deviation, a maximum voltage stability, lower amount of pollutant and lower cost. The cost includes the installation costs of new equipment, reconfiguration costs, power loss cost, reliability cost, cost of energy purchased from power market, upgrade costs of lines and operation and maintenance costs of DGs. Therefore, the proposed methodology improves power quality, reliability and security in lower costs besides its preserve, with the operational indices of power distribution networks in acceptable level. To validate the proposed methodology's usefulness, it was applied on the IEEE 33-bus distribution system then the outcomes were compared with initial configuration. 展开更多
关键词 optimal reconfiguration renewable energy resources sitting and sizing capacitor allocation electric distribution system uncertainty modeling scenario based-stochastic programming multi-objective genetic algorithm
下载PDF
Provision of Ramp-rate Limitation as Ancillary Service from Distribution to Transmission System:Definitions and Methodologies for Control and Sizing of Central Battery Energy Storage System
2
作者 Spyros I.Gkavanoudis Kyriaki-Nefeli D.Malamaki +4 位作者 Eleftherios O.Kontis Aditya Shekhar Umer Mushtaq Sagar Bandi Venu Charis S.Demoulias 《Journal of Modern Power Systems and Clean Energy》 SCIE EI CSCD 2023年第5期1507-1518,共12页
The variability of the output power of distributed renewable energy sources(DRESs)that originate from the fastchanging climatic conditions can negatively affect the grid stability.Therefore,grid operators have incorpo... The variability of the output power of distributed renewable energy sources(DRESs)that originate from the fastchanging climatic conditions can negatively affect the grid stability.Therefore,grid operators have incorporated ramp-rate limitations(RRLs)for the injected DRES power in the grid codes.As the DRES penetration levels increase,the mitigation of high-power ramps is no longer considered as a system support function but rather an ancillary service(AS).Energy storage systems(ESSs)coordinated by RR control algorithms are often applied to mitigate these power fluctuations.However,no unified definition of active power ramps,which is essential to treat the RRL as AS,currently exists.This paper assesses the various definitions for ramp-rate RR and proposes RRL method control for a central battery ESS(BESS)in distribution systems(DSs).The ultimate objective is to restrain high-power ramps at the distribution transformer level so that RRL can be traded as AS to the upstream transmission system(TS).The proposed control is based on the direct control of theΔP/Δt,which means that the control parameters are directly correlated with the RR requirements included in the grid codes.In addition,a novel method for restoring the state of charge(So C)within a specific range following a high ramp-up/down event is proposed.Finally,a parametric method for estimating the sizing of central BESSs(BESS sizing for short)is developed.The BESS sizing is determined by considering the RR requirements,the DRES units,and the load mix of the examined DS.The BESS sizing is directly related to the constant RR achieved using the proposed control.Finally,the proposed methodologies are validated through simulations in MATLAB/Simulink and laboratory tests in a commercially available BESS. 展开更多
关键词 Battery energy storage system distributed renewable energy resource SIZING distribution system transmission system ramp-rate limitation state of charge
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部