A consensus-based distributed control method of coordinated VSGs with communication time delays in isolate microgrid is proposed. When time delays are considered in communication, there are some effects on frequency r...A consensus-based distributed control method of coordinated VSGs with communication time delays in isolate microgrid is proposed. When time delays are considered in communication, there are some effects on frequency restoration and active power output allocation. In the control structure, only local information exchange is needed, while the final frequency can be controlled to the nominal value and the VSGs can automatically share loads according to their rated values. An AC microgrid with three VSGs and some loads is implemented. The proposed control strategy is verified by MATLAB/ Simulink simulation results.展开更多
With the increase of bridge reconstruction schemes, synchronous lifting of a bridge is more and more widely used. In order to solve the problems associated with the synchronoas lifting of a bridge, a multi-cylinder sy...With the increase of bridge reconstruction schemes, synchronous lifting of a bridge is more and more widely used. In order to solve the problems associated with the synchronoas lifting of a bridge, a multi-cylinder synchronous lifting power and monitoring system has been developed. This is a distributed control system, which is com- posed of an industrial computer workstation, a programmable logical controller and a hydraulic control system. The system can achieve distributed control and centralized operation of actuators, and centralized management of infor- mation. It not only can implement multi-cylinder synchronous lifting with an unbalanced load, but also can moni- tor the pressure, displacement and stress at each lifting point. The performance of the multi-cylinder synchronous system is verified through its application to several bridge lifting engineering projects. The details of such a project are given.展开更多
Large-scale and complex process systems are essentially interconnected networks.The automated operation of such process networks requires the solution of control and optimization problems in a distributed manner.In th...Large-scale and complex process systems are essentially interconnected networks.The automated operation of such process networks requires the solution of control and optimization problems in a distributed manner.In this approach,the network is decomposed into several subsystems,each of which is under the supervision of a corresponding computing agent(controller,optimizer).The agents coordinate their control and optimization decisions based on information communication among them.In recent years,algorithms and methods for distributed control and optimization are undergoing rapid development.In this paper,we provide a comprehensive,up-to-date review with perspectives and discussions on possible future directions.展开更多
The stretching process,as a key phase of web production system,pursues the target velocities of rollers and the web tensions of spans between the successive rollers to guarantee proper stretching ratios. This requires...The stretching process,as a key phase of web production system,pursues the target velocities of rollers and the web tensions of spans between the successive rollers to guarantee proper stretching ratios. This requires the stable velocities and velocity ratios of large number rollers separated throughout the workshop. To this goal,a distributed cooperative controller is designed to coordinate the velocities of the rollers to the desired values as well as the target ratios between the upper and lower rollers. During the whole evolution,only the neighbor rollers can exchange the working information,and neither global information nor central controller is required. It is proven that all the rollers asymptotically achieve the desired velocity ratios via the proposed control law,which is also demonstrated by numerical simulation.展开更多
As a key component of injection molding,multi-cavity hot runner(MCHR)system faces the crucial problem of polymer melt filling imbalance among the cavities.The thermal imbalance in the system has been considered as the...As a key component of injection molding,multi-cavity hot runner(MCHR)system faces the crucial problem of polymer melt filling imbalance among the cavities.The thermal imbalance in the system has been considered as the leading cause.Hence,the solution may rest with the synchronization of those heating processes in MCHR system.This paper proposes a’Master-Slave’generalized predictive synchronization control(MS-GPSC)method with’Mr.Slowest’strategy for preheating stage of MCHR system.The core of the proposed method is choosing the heating process with slowest dynamics as the’Master’to track the setpoint,while the other heating processes are treated as‘Slaves’tracking the output of’Master’.This proposed method is shown to have the good ability of temperature synchronization.The corresponding analysis is conducted on parameters tuning and stability,simulations and experiments show the strategy is effective.展开更多
This paper proposes a distributed control method based on the differential flatness(DF) property of robot swarms. The swarm DF mapping is established for underactuated differentially flat dynamics, according to the co...This paper proposes a distributed control method based on the differential flatness(DF) property of robot swarms. The swarm DF mapping is established for underactuated differentially flat dynamics, according to the control objective. The DF mapping refers to the fact that the system state and input of each robot can be derived algebraically from the flat outputs of the leaders and the cooperative errors and their finite order derivatives. Based on the proposed swarm DF mapping, a distributed controller is designed. The distributed implementation of swarm DF mapping is achieved through observer design. The effectiveness of the proposed method is validated through a numerical simulation of quadrotor swarm synchronization.展开更多
We presented a control strategy for tablet manufacturing processes based on continuous direct compression.The work was conducted by the experts of pharmaceutical companies,machine suppliers,academia,and regulatory aut...We presented a control strategy for tablet manufacturing processes based on continuous direct compression.The work was conducted by the experts of pharmaceutical companies,machine suppliers,academia,and regulatory authority in Japan.Among different items in the process,the component ratio and blended powder content were selected as the items requiring the control method specific to continuous manufacturing different from the conventional batch manufacturing.The control and management of the Loss in Weight(LIW)feeder were deemed the most important,and the Residence Time Distribution(RTD)model were regarded effective for setting the control range and for controlling of the LIW feeder.Based on these ideas,the concept of process control using RTD was summarized.展开更多
This paper studies the distributed synchronization control problem of a class of stochastic dynamical systems with time-varying delays and random noise via randomly occurring control. The activation of the distributed...This paper studies the distributed synchronization control problem of a class of stochastic dynamical systems with time-varying delays and random noise via randomly occurring control. The activation of the distributed adaptive controller and the update of the control gain designed in this paper all happen randomly. Based on the Lyapunov stability theory, LaSalle invariance principle, combined with the use of the properties of the matrix Kronecker product, stochastic differential equation theory and other related tools, by constructing the appropriate Lyapunov functional, the criterion for the distributed synchronization of this type of stochastic complex networks in mean square is obtained.展开更多
Currently, the high-speed serial fiber-optic ring net communication is a main method for performing the distributed control network topology and control mode. Because of a network transmission delay inherent in the to...Currently, the high-speed serial fiber-optic ring net communication is a main method for performing the distributed control network topology and control mode. Because of a network transmission delay inherent in the topology, synchronization between nodes has become a critical issue which needs to be studied. The existing synchronization methods largely depend on the complex communication protocol. Therefore, this paper has proposed a method of automatic measurement and compensation of synchronization delay, and analyzed its operating principle and implementation procedure in detail. The results obtained from the experiments prove the proposed method to be correct, effective and practicable.展开更多
In this work,an adaptive sampling control strategy for distributed predictive control is proposed.According to the proposed method,the sampling rate of each subsystem of the accused object is determined based on the p...In this work,an adaptive sampling control strategy for distributed predictive control is proposed.According to the proposed method,the sampling rate of each subsystem of the accused object is determined based on the periodic detection of its dynamic behavior and calculations made using a correlation function.Then,the optimal sampling interval within the period is obtained and sent to the corresponding sub-prediction controller,and the sampling interval of the controller is changed accordingly before the next sampling period begins.In the next control period,the adaptive sampling mechanism recalculates the sampling rate of each subsystem’s measurable output variable according to both the abovementioned method and the change in the dynamic behavior of the entire system,and this process is repeated.Such an adaptive sampling interval selection based on an autocorrelation function that measures dynamic behavior can dynamically optimize the selection of sampling rate according to the real-time change in the dynamic behavior of the controlled object.It can also accurately capture dynamic changes,meaning that each sub-prediction controller can more accurately calculate the optimal control quantity at the next moment,significantly improving the performance of distributed model predictive control(DMPC).A comparison demonstrates that the proposed adaptive sampling DMPC algorithm has better tracking performance than the traditional DMPC algorithm.展开更多
This paper considers how to use a group of robots to sense and control a diffusion process.The diffusion process is modeled by a partial differential equation (PDE),which is a both spatially and temporally variant sys...This paper considers how to use a group of robots to sense and control a diffusion process.The diffusion process is modeled by a partial differential equation (PDE),which is a both spatially and temporally variant system.The robots can serve as mobile sensors,actuators,or both.Centroidal Voronoi Tessellations based coverage control algorithm is proposed for the cooperative sensing task.For the diffusion control problem,this paper considers spraying control via a group of networked mobile robots equipped with chemical neutralizers,known as smart mobile sprayers or actuators,in a domain of interest having static mesh sensor network for concentration sensing.This paper also introduces the information sharing and consensus strategy when using centroidal Voronoi tessellations algorithm to control a diffusion process.The information is shared not only on where to spray but also on how much to spray among the mobile actuators.Benefits from using CVT and information consensus seeking for sensing and control of a diffusion process are demonstrated in simulation results.展开更多
This paper presents a method of NTP-based time synchronization and a strategy of master-slave server structured time synchronization to ensure the test and control system of aeroengine to be time-synchronized. Based o...This paper presents a method of NTP-based time synchronization and a strategy of master-slave server structured time synchronization to ensure the test and control system of aeroengine to be time-synchronized. Based on time synchronization, the hierarchy and the integration of the measurement and control system of aeroengine are investigated. In result, our method is successfully applied for multiple front-end tests in a simulative altitude test facility of aeroengine.展开更多
In the distributed synthetic aperture radar (SAR), the alternating bistatic mode can perform phase reference without a synchronization link between two satellites compared with the pulsed alternate synchronization m...In the distributed synthetic aperture radar (SAR), the alternating bistatic mode can perform phase reference without a synchronization link between two satellites compared with the pulsed alternate synchronization method. The key of the phase synchronization processing is to extract the oscillator phase differences from the bistatic echoes. A signal model of phase synchronization in the alternating bistatic mode is presented. The phase synchronization processing method is then studied. To reduce the phase errors introduced by SAR imaging, a sub-aperture processing method is proposed. To generalize the sub-aperture processing method, an echo-domain processing method using correlation of bistatic echoes is proposed. Finally, the residual phase errors of the both proposed processing methods are analyzed. Simulation experiments validate the proposed phase synchronization processing method and its phase error analysis results.展开更多
Background: Novel coronavirus pneumonia (NCP) and osteoporotic vertebral compression fractures (OVCF) are the high incidences of diseases in the elderly. During the epidemic period, if not treated in time, the complic...Background: Novel coronavirus pneumonia (NCP) and osteoporotic vertebral compression fractures (OVCF) are the high incidences of diseases in the elderly. During the epidemic period, if not treated in time, the complications are high and the mortality is high. If we do not pay attention to infection prevention and control in pre-hospital emergency care, it will lead to the first time infection of medical staff and in-hospital cross infection in emergency outpatient receiving area. The correct consideration of both and the establishment of perfect pre-hospital emergency treatment and infection prevention and control synchronous strategy is an important premise to ensure the stable, orderly and safe medical treatment. Objective: To explore the effect of synchronous implementation of pre-hospital emergency care, nursing and infection pre-vention and control for senile OVCF during the epidemic. In order to improve the efficiency of pre-hospital emergency care and prevent the spread of infection. Method: A total of 92 elderly patients with OVCF who received pre-hospital treatment in 18 hospitals in Zhangjiakou City during the epidemic prevention and control period from January 2020 to November 2022 and met the inclusion criteria were selected as research objects, including 24 males and 68 females, aged 65 - 82 (74.2 ± 2.2) years. All patients were associated with concomitant injuries and underlying diseases. All patients in this group underwent predictive pre-hospital rescue and infection prevention and control procedures. Results: All the 92 elderly patients with OVCF received timely pre-hospital treatment during the epidemic period, and no aggravation occurred of the 92 patients, 35 were in the high risk area, 10 were in the medium risk area, and 47 were in the low risk area. Exclude OVCF for NCP Patients were treated according to the conventional diagnosis and treatment principles. Suspected and confirmed cases are transferred to designated surgical hospitals for treatment. All patients were followed up 3 months, 6 months and 12 months after treatment. There was no death rate, high satisfaction of pre-hospital first aid, high diagnostic accuracy, and good curative effect. None of the rescue personnel had any infection rate, and no hospital infection transmission and nosocomial cross infection occurred. Conclusion: It is the first step to safely treat patients and prevent cross infection to establish a perfect synchronous strategy of pre-hospital first aid and infection prevention and control.展开更多
A full distribution CNC system based on SERCOS bus is studied in accordance with the limitations of traditional PC-based motion card. The conventional PC-based motion control card is dispersed into several autonomous ...A full distribution CNC system based on SERCOS bus is studied in accordance with the limitations of traditional PC-based motion card. The conventional PC-based motion control card is dispersed into several autonomous intelligent servo-control units with the function of servo driver. The autonomous intelligent servocontrol units realize the loop control of position, velocity and current. Interpolation computation is completed in PC and the computational results are transferred to every autonomous intelligent servo-control unit by high speed SERCOS bus. Software or hardware synchronization technology is used to ensure all servomotors are successive and synchronously running. The communication and synchronization technology of SERCOS are also researched and the autonomous intelligent servo-control card is developed byself. Finally, the experiment of circle contour process on a prototype system proves the feasibility.展开更多
When designing a complex mechatronics system, such as high speed trains, it is relatively difficult to effectively simulate the entire system's dynamic behaviors because it involves multi-disciplinary subsystems. Cur...When designing a complex mechatronics system, such as high speed trains, it is relatively difficult to effectively simulate the entire system's dynamic behaviors because it involves multi-disciplinary subsystems. Currently, a most practical approach for multi-disciplinary simulation is interface based coupling simulation method, but it faces a twofold challenge: spatial and time unsynchronizations among multi-directional coupling simulation of subsystems. A new collaborative simulation method with spatiotemporal synchronization process control is proposed for coupling simulating a given complex mechatronics system across multiple subsystems on different platforms. The method consists of 1) a coupler-based coupling mechanisms to define the interfacing and interaction mechanisms among subsystems, and 2) a simulation process control algorithm to realize the coupling simulation in a spatiotemporal synchronized manner. The test results from a case study show that the proposed method 1) can certainly be used to simulate the sub-systems interactions under different simulation conditions in an engineering system, and 2) effectively supports multi-directional coupling simulation among multi-disciplinary subsystems. This method has been successfully applied in China high speed train design and development processes, demonstrating that it can be applied in a wide range of engineering systems design and simulation with improved efficiency and effectiveness.展开更多
The Pareto distribution plays an important role in various areas of research. In this paper, the average run length (ARL) unbiased control charts, which monitor the shape and threshold parameters of the Pareto distr...The Pareto distribution plays an important role in various areas of research. In this paper, the average run length (ARL) unbiased control charts, which monitor the shape and threshold parameters of the Pareto distribution respectively, are proposed when the incontrol parameters are known. The effects of parameter estimation on the performance of the proposed control charts are also studied. Results show that the control charts with the estimated parameters are not suitable to be used in the known parameter case, thus the ARL-unbiased control charts for the shape and threshold parameters with the desired ARLo, which consider the variability of the parameter estimates, are further developed. The performance of the proposed control charts is investigated in terms of the ARL. Finally, an example is given to illustrate the proposed control charts.展开更多
文摘A consensus-based distributed control method of coordinated VSGs with communication time delays in isolate microgrid is proposed. When time delays are considered in communication, there are some effects on frequency restoration and active power output allocation. In the control structure, only local information exchange is needed, while the final frequency can be controlled to the nominal value and the VSGs can automatically share loads according to their rated values. An AC microgrid with three VSGs and some loads is implemented. The proposed control strategy is verified by MATLAB/ Simulink simulation results.
基金supported by the Ph.D. Programs Foundation of Ministry of Education of China under Grant No. 20070056010Tianjin Municipal Natural Science Foundation under Grant No.07JCZBJC09900Tianjin key technology research for majorproject under Contract No.05ZHGCGX00500
文摘With the increase of bridge reconstruction schemes, synchronous lifting of a bridge is more and more widely used. In order to solve the problems associated with the synchronoas lifting of a bridge, a multi-cylinder synchronous lifting power and monitoring system has been developed. This is a distributed control system, which is com- posed of an industrial computer workstation, a programmable logical controller and a hydraulic control system. The system can achieve distributed control and centralized operation of actuators, and centralized management of infor- mation. It not only can implement multi-cylinder synchronous lifting with an unbalanced load, but also can moni- tor the pressure, displacement and stress at each lifting point. The performance of the multi-cylinder synchronous system is verified through its application to several bridge lifting engineering projects. The details of such a project are given.
基金Supported by Division of Chemical,Bioengineering,Environmental and Transport Systems(CBET) of the National Science Foundation(NSF) of the United States of America
文摘Large-scale and complex process systems are essentially interconnected networks.The automated operation of such process networks requires the solution of control and optimization problems in a distributed manner.In this approach,the network is decomposed into several subsystems,each of which is under the supervision of a corresponding computing agent(controller,optimizer).The agents coordinate their control and optimization decisions based on information communication among them.In recent years,algorithms and methods for distributed control and optimization are undergoing rapid development.In this paper,we provide a comprehensive,up-to-date review with perspectives and discussions on possible future directions.
基金National Natural Science Foundations of China(Nos.61203073,61134009)Specialized Research Fund for the Doctoral Program of Higher Education of China(No.20120075120008)+2 种基金Foundation of Key Laboratory of System Control and Information Processing,Ministry of Education,China(No.SCIP2012002)Program for Changjiang Scholars and Innovation Research Team in University from the Ministry of Education,China(No.IRT1220)Specialized Research Fund for Shanghai Leading Talents,Project of the Shanghai Committee of Science and Technology(No.13JC1407500)
文摘The stretching process,as a key phase of web production system,pursues the target velocities of rollers and the web tensions of spans between the successive rollers to guarantee proper stretching ratios. This requires the stable velocities and velocity ratios of large number rollers separated throughout the workshop. To this goal,a distributed cooperative controller is designed to coordinate the velocities of the rollers to the desired values as well as the target ratios between the upper and lower rollers. During the whole evolution,only the neighbor rollers can exchange the working information,and neither global information nor central controller is required. It is proven that all the rollers asymptotically achieve the desired velocity ratios via the proposed control law,which is also demonstrated by numerical simulation.
基金supported in part by National Natural Science Foundation of China(62203127)Basic and Applied Basic Research Project of Guangzhou City(2023A04J1712)+1 种基金The Foshan-HKUST Projects Program(FSUST19-FYTRI01)GDAS’Project of Science and Technology Development(2020GDASYL-20200202001).
文摘As a key component of injection molding,multi-cavity hot runner(MCHR)system faces the crucial problem of polymer melt filling imbalance among the cavities.The thermal imbalance in the system has been considered as the leading cause.Hence,the solution may rest with the synchronization of those heating processes in MCHR system.This paper proposes a’Master-Slave’generalized predictive synchronization control(MS-GPSC)method with’Mr.Slowest’strategy for preheating stage of MCHR system.The core of the proposed method is choosing the heating process with slowest dynamics as the’Master’to track the setpoint,while the other heating processes are treated as‘Slaves’tracking the output of’Master’.This proposed method is shown to have the good ability of temperature synchronization.The corresponding analysis is conducted on parameters tuning and stability,simulations and experiments show the strategy is effective.
基金Project supported by the National Natural Science Foundation of China (Nos. 62373025, 12332004,62003013, and 11932003)。
文摘This paper proposes a distributed control method based on the differential flatness(DF) property of robot swarms. The swarm DF mapping is established for underactuated differentially flat dynamics, according to the control objective. The DF mapping refers to the fact that the system state and input of each robot can be derived algebraically from the flat outputs of the leaders and the cooperative errors and their finite order derivatives. Based on the proposed swarm DF mapping, a distributed controller is designed. The distributed implementation of swarm DF mapping is achieved through observer design. The effectiveness of the proposed method is validated through a numerical simulation of quadrotor swarm synchronization.
文摘We presented a control strategy for tablet manufacturing processes based on continuous direct compression.The work was conducted by the experts of pharmaceutical companies,machine suppliers,academia,and regulatory authority in Japan.Among different items in the process,the component ratio and blended powder content were selected as the items requiring the control method specific to continuous manufacturing different from the conventional batch manufacturing.The control and management of the Loss in Weight(LIW)feeder were deemed the most important,and the Residence Time Distribution(RTD)model were regarded effective for setting the control range and for controlling of the LIW feeder.Based on these ideas,the concept of process control using RTD was summarized.
文摘This paper studies the distributed synchronization control problem of a class of stochastic dynamical systems with time-varying delays and random noise via randomly occurring control. The activation of the distributed adaptive controller and the update of the control gain designed in this paper all happen randomly. Based on the Lyapunov stability theory, LaSalle invariance principle, combined with the use of the properties of the matrix Kronecker product, stochastic differential equation theory and other related tools, by constructing the appropriate Lyapunov functional, the criterion for the distributed synchronization of this type of stochastic complex networks in mean square is obtained.
基金Supported by National Natural Science Foundation of China (61164013, U1334211, 51174091), the Key Program of China Ministry of Railway (2011Z002-D), and Natural Science Foundation of Jiangxi Province (20122BAB201021)
文摘Currently, the high-speed serial fiber-optic ring net communication is a main method for performing the distributed control network topology and control mode. Because of a network transmission delay inherent in the topology, synchronization between nodes has become a critical issue which needs to be studied. The existing synchronization methods largely depend on the complex communication protocol. Therefore, this paper has proposed a method of automatic measurement and compensation of synchronization delay, and analyzed its operating principle and implementation procedure in detail. The results obtained from the experiments prove the proposed method to be correct, effective and practicable.
基金the National Natural Science Foundation of China(61563032,61963025)The Open Foundation of the Key Laboratory of Gansu Advanced Control for Industrial Processes(2019KX01)The Project of Industrial support and guidance of Colleges and Universities in Gansu Province(2019C05).
文摘In this work,an adaptive sampling control strategy for distributed predictive control is proposed.According to the proposed method,the sampling rate of each subsystem of the accused object is determined based on the periodic detection of its dynamic behavior and calculations made using a correlation function.Then,the optimal sampling interval within the period is obtained and sent to the corresponding sub-prediction controller,and the sampling interval of the controller is changed accordingly before the next sampling period begins.In the next control period,the adaptive sampling mechanism recalculates the sampling rate of each subsystem’s measurable output variable according to both the abovementioned method and the change in the dynamic behavior of the entire system,and this process is repeated.Such an adaptive sampling interval selection based on an autocorrelation function that measures dynamic behavior can dynamically optimize the selection of sampling rate according to the real-time change in the dynamic behavior of the controlled object.It can also accurately capture dynamic changes,meaning that each sub-prediction controller can more accurately calculate the optimal control quantity at the next moment,significantly improving the performance of distributed model predictive control(DMPC).A comparison demonstrates that the proposed adaptive sampling DMPC algorithm has better tracking performance than the traditional DMPC algorithm.
基金supported in part by NSF grants #0552758,#0851709, and #0540179.
文摘This paper considers how to use a group of robots to sense and control a diffusion process.The diffusion process is modeled by a partial differential equation (PDE),which is a both spatially and temporally variant system.The robots can serve as mobile sensors,actuators,or both.Centroidal Voronoi Tessellations based coverage control algorithm is proposed for the cooperative sensing task.For the diffusion control problem,this paper considers spraying control via a group of networked mobile robots equipped with chemical neutralizers,known as smart mobile sprayers or actuators,in a domain of interest having static mesh sensor network for concentration sensing.This paper also introduces the information sharing and consensus strategy when using centroidal Voronoi tessellations algorithm to control a diffusion process.The information is shared not only on where to spray but also on how much to spray among the mobile actuators.Benefits from using CVT and information consensus seeking for sensing and control of a diffusion process are demonstrated in simulation results.
文摘This paper presents a method of NTP-based time synchronization and a strategy of master-slave server structured time synchronization to ensure the test and control system of aeroengine to be time-synchronized. Based on time synchronization, the hierarchy and the integration of the measurement and control system of aeroengine are investigated. In result, our method is successfully applied for multiple front-end tests in a simulative altitude test facility of aeroengine.
基金supported by the National Natural Science Foundation of China(6100203161101187)
文摘In the distributed synthetic aperture radar (SAR), the alternating bistatic mode can perform phase reference without a synchronization link between two satellites compared with the pulsed alternate synchronization method. The key of the phase synchronization processing is to extract the oscillator phase differences from the bistatic echoes. A signal model of phase synchronization in the alternating bistatic mode is presented. The phase synchronization processing method is then studied. To reduce the phase errors introduced by SAR imaging, a sub-aperture processing method is proposed. To generalize the sub-aperture processing method, an echo-domain processing method using correlation of bistatic echoes is proposed. Finally, the residual phase errors of the both proposed processing methods are analyzed. Simulation experiments validate the proposed phase synchronization processing method and its phase error analysis results.
文摘Background: Novel coronavirus pneumonia (NCP) and osteoporotic vertebral compression fractures (OVCF) are the high incidences of diseases in the elderly. During the epidemic period, if not treated in time, the complications are high and the mortality is high. If we do not pay attention to infection prevention and control in pre-hospital emergency care, it will lead to the first time infection of medical staff and in-hospital cross infection in emergency outpatient receiving area. The correct consideration of both and the establishment of perfect pre-hospital emergency treatment and infection prevention and control synchronous strategy is an important premise to ensure the stable, orderly and safe medical treatment. Objective: To explore the effect of synchronous implementation of pre-hospital emergency care, nursing and infection pre-vention and control for senile OVCF during the epidemic. In order to improve the efficiency of pre-hospital emergency care and prevent the spread of infection. Method: A total of 92 elderly patients with OVCF who received pre-hospital treatment in 18 hospitals in Zhangjiakou City during the epidemic prevention and control period from January 2020 to November 2022 and met the inclusion criteria were selected as research objects, including 24 males and 68 females, aged 65 - 82 (74.2 ± 2.2) years. All patients were associated with concomitant injuries and underlying diseases. All patients in this group underwent predictive pre-hospital rescue and infection prevention and control procedures. Results: All the 92 elderly patients with OVCF received timely pre-hospital treatment during the epidemic period, and no aggravation occurred of the 92 patients, 35 were in the high risk area, 10 were in the medium risk area, and 47 were in the low risk area. Exclude OVCF for NCP Patients were treated according to the conventional diagnosis and treatment principles. Suspected and confirmed cases are transferred to designated surgical hospitals for treatment. All patients were followed up 3 months, 6 months and 12 months after treatment. There was no death rate, high satisfaction of pre-hospital first aid, high diagnostic accuracy, and good curative effect. None of the rescue personnel had any infection rate, and no hospital infection transmission and nosocomial cross infection occurred. Conclusion: It is the first step to safely treat patients and prevent cross infection to establish a perfect synchronous strategy of pre-hospital first aid and infection prevention and control.
文摘A full distribution CNC system based on SERCOS bus is studied in accordance with the limitations of traditional PC-based motion card. The conventional PC-based motion control card is dispersed into several autonomous intelligent servo-control units with the function of servo driver. The autonomous intelligent servocontrol units realize the loop control of position, velocity and current. Interpolation computation is completed in PC and the computational results are transferred to every autonomous intelligent servo-control unit by high speed SERCOS bus. Software or hardware synchronization technology is used to ensure all servomotors are successive and synchronously running. The communication and synchronization technology of SERCOS are also researched and the autonomous intelligent servo-control card is developed byself. Finally, the experiment of circle contour process on a prototype system proves the feasibility.
基金Supported by National High Technology Research and Development Program of China(863 Program,Grant No.2015AA043701-02)
文摘When designing a complex mechatronics system, such as high speed trains, it is relatively difficult to effectively simulate the entire system's dynamic behaviors because it involves multi-disciplinary subsystems. Currently, a most practical approach for multi-disciplinary simulation is interface based coupling simulation method, but it faces a twofold challenge: spatial and time unsynchronizations among multi-directional coupling simulation of subsystems. A new collaborative simulation method with spatiotemporal synchronization process control is proposed for coupling simulating a given complex mechatronics system across multiple subsystems on different platforms. The method consists of 1) a coupler-based coupling mechanisms to define the interfacing and interaction mechanisms among subsystems, and 2) a simulation process control algorithm to realize the coupling simulation in a spatiotemporal synchronized manner. The test results from a case study show that the proposed method 1) can certainly be used to simulate the sub-systems interactions under different simulation conditions in an engineering system, and 2) effectively supports multi-directional coupling simulation among multi-disciplinary subsystems. This method has been successfully applied in China high speed train design and development processes, demonstrating that it can be applied in a wide range of engineering systems design and simulation with improved efficiency and effectiveness.
基金Supported by Foundation of Ministry of Education of China(13YJC910005,13YJC910010,12YJA910005)Zhejiang Provincial Natural Science Foundation of China(LY16G020003)+2 种基金the Philosophy and Social Science Research Project in Zhejiang Province of China(13NDJC055YB)the National Natural Science Foundation of China(11371322)the Zhejiang Provincial Key Research Base for Humanities and Social Science Research(Statistics)
文摘The Pareto distribution plays an important role in various areas of research. In this paper, the average run length (ARL) unbiased control charts, which monitor the shape and threshold parameters of the Pareto distribution respectively, are proposed when the incontrol parameters are known. The effects of parameter estimation on the performance of the proposed control charts are also studied. Results show that the control charts with the estimated parameters are not suitable to be used in the known parameter case, thus the ARL-unbiased control charts for the shape and threshold parameters with the desired ARLo, which consider the variability of the parameter estimates, are further developed. The performance of the proposed control charts is investigated in terms of the ARL. Finally, an example is given to illustrate the proposed control charts.