With the rapid development of urban commercial complex in China,its roof garden becomes an important container for outdoor consumption and activities as the link between itself and the city,and more and more attention...With the rapid development of urban commercial complex in China,its roof garden becomes an important container for outdoor consumption and activities as the link between itself and the city,and more and more attention has been paid to its attractiveness.First,roof garden of Handan Meilecheng is taken as research object,and quantitative method of spatial attractiveness is established based on the number of spontaneous and chain activities and their intensity score.On this basis,data are collected via field investigation,and spatial attractiveness of roof garden of Meilecheng is quantified,and its distribution characteristics are summarized.Second,the cause of the characteristics formation is explained from the perspective of built environment elements.Finally,corresponding optimization strategies are proposed from four aspects:setting of landscape platform,increase of interest in sculpture sketches,design of space boundary,and improvement of spatial accessibility,which could provide reference for planning,design and transformation of roof garden of commercial complex in the future.展开更多
A novel joint optimization strategy for the secondary user( SU) was proposed to consider the short-term and long-term video transmissions over distributed cognitive radio networks( DCRNs).Since the long-term video tra...A novel joint optimization strategy for the secondary user( SU) was proposed to consider the short-term and long-term video transmissions over distributed cognitive radio networks( DCRNs).Since the long-term video transmission consisted of a series of shortterm transmissions, the optimization problem in the video transmission was a composite optimization process. Firstly,considering some factors like primary user's( PU's) collision limitations,non-synchronization between SU and PU,and SU's limited buffer size, the short-term optimization problem was formulated as a mixed integer non-linear program( MINLP) to minimize the block probability of video packets. Secondly,combining the minimum packet block probability obtained in shortterm optimization and SU's constraint on hardware complexity,the partially observable Markov decision process( POMDP) framework was proposed to learn PU's statistic information over DCRNs.Moreover,based on the proposed framework,joint optimization strategy was designed to obtain the minimum packet loss rate in long-term video transmission. Numerical simulation results were provided to demonstrate validity of our strategies.展开更多
Recent studies of the space debris environment in Low Earth Orbit(LEO)have shown that the critical density of space debris has been reached in certain regions.The Active Debris Removal(ADR)mission,to mitigate the spac...Recent studies of the space debris environment in Low Earth Orbit(LEO)have shown that the critical density of space debris has been reached in certain regions.The Active Debris Removal(ADR)mission,to mitigate the space debris density and stabilize the space debris environment,has been considered as a most effective method.In this paper,a novel two-level optimization strategy for multi-debris removal mission in LEO is proposed,which includes the low-level and high-level optimization process.To improve the overall performance of the multi-debris active removal mission and obtain multiple Pareto-optimal solutions,the ADR mission is seen as a Time-Dependant Traveling Salesman Problem(TDTSP)with two objective functions to minimize the total mission duration and the total propellant consumption.The problem includes the sequence optimization to determine the sequence of removal of space debris and the transferring optimization to define the orbital maneuvers.Two optimization models for the two-level optimization strategy are built in solving the multi-debris removal mission,and the optimal Pareto solution is successfully obtained by using the non-dominated sorting genetic algorithm II(NSGA-II).Two test cases are presented,which show that the low level optimization strategy can successfully obtain the optimal sequences and the initial solution of the ADR mission and the high level optimization strategy can efficiently and robustly find the feasible optimal solution for long duration perturbed rendezvous problem.展开更多
Considering dual distributed controllers, a design of optimal state estimation strategy is studied for the wireless sensor and actuator network(WSAN). In particular, the optimal linear quadratic(LQ) control strategy w...Considering dual distributed controllers, a design of optimal state estimation strategy is studied for the wireless sensor and actuator network(WSAN). In particular, the optimal linear quadratic(LQ) control strategy with estimated plant state is formulated as a non-cooperative game with network-induced delays. Then, using the Kalman filter approach, an optimal estimation of the plant state is obtained based on the information fusion of the distributed controllers. Finally, an optimal state estimation strategy is derived as a linear function of the current estimated plant state and the last control strategy of multiple controllers. The effectiveness of the proposed closed-loop control strategy is verified by the simulation experiments.展开更多
Today, in the modern era, and under the pressure of rapid development around the kingdom regions, electric utilities are confronted with a myriad of challenges that include aging infrastructure, enhanced expectation o...Today, in the modern era, and under the pressure of rapid development around the kingdom regions, electric utilities are confronted with a myriad of challenges that include aging infrastructure, enhanced expectation of reliability, reduced cost, and coping effectively with uncertainties and changing regulation requirements. Indeed, for distribution systems, HV/MV substations represent a complex and critical physical asset that requires a careful evaluation of their maintenance practices aiming at more cost-effective tasks. The first concern of the electric power distribution company in Morocco is the optimization of the distribution network maintenance scheduling, to minimize system operating costs and ensure that the system is running most economically. There is significant pressure on power providers for greater system reliability and improvement of customer satisfaction, while similar emphasis is placed on cost reduction. These cost reductions focus on reducing operating and maintenance expenses, and minimizing investments in new plants and equipment. However, the present of the electricity distribution, influenced by a number of technical restrictions and strict regulatory requirements to meet, leads distribution utilities to search new ways of optimizing the maintenance management, make an effort to maximize profit by reducing their electricity supply and operation costs while maintaining their reliability, developing more effective activities, with lower costs. Furthermore, maximal HV/MV substation asset value and minimal maintenance cost are typical economic objectives of the electric utilities. The optimization of maintenance is one possible technique to reduce maintenance costs while improving reliability and utilities need to implement new strategies for more effective maintenance techniques and Asset Management (AM) methods programs to manage inspections and maintenance activities in order to control HV/MV substation equipment conditions. However, development of strategies to make sound decisions in order to effectively improve equipment and system reliability while meeting constraints such as a maintenance budget is a challenge. Finally, this paper describes the application of a new approach based Reliability Centered Maintenance (RCM) methodology to optimize maintenance resources and to the development of maintenance plan for HV/MV distribution substations. For this purpose, a case study was performed on the equipment of power distribution systems for the benefit of a holding company (ONEE Electricity Distribution) in Morocco. The present study was conducted in Oujda Exploitation Maintenance Service (OEXMS), in charge of operation and maintenance of distribution networks.展开更多
基金Sponsored by Key Projects of Humanities and Social Sciences in Colleges and Universities of Hebei Province (SD201075)Research and Practice Project of Higher Education Teaching Reform in Hebei Province (2019GJJG249)Graduate Demonstration Course Project in Hebei Province (KCJS2019069)。
文摘With the rapid development of urban commercial complex in China,its roof garden becomes an important container for outdoor consumption and activities as the link between itself and the city,and more and more attention has been paid to its attractiveness.First,roof garden of Handan Meilecheng is taken as research object,and quantitative method of spatial attractiveness is established based on the number of spontaneous and chain activities and their intensity score.On this basis,data are collected via field investigation,and spatial attractiveness of roof garden of Meilecheng is quantified,and its distribution characteristics are summarized.Second,the cause of the characteristics formation is explained from the perspective of built environment elements.Finally,corresponding optimization strategies are proposed from four aspects:setting of landscape platform,increase of interest in sculpture sketches,design of space boundary,and improvement of spatial accessibility,which could provide reference for planning,design and transformation of roof garden of commercial complex in the future.
基金National Natural Science Foundation of China(No.61301101)
文摘A novel joint optimization strategy for the secondary user( SU) was proposed to consider the short-term and long-term video transmissions over distributed cognitive radio networks( DCRNs).Since the long-term video transmission consisted of a series of shortterm transmissions, the optimization problem in the video transmission was a composite optimization process. Firstly,considering some factors like primary user's( PU's) collision limitations,non-synchronization between SU and PU,and SU's limited buffer size, the short-term optimization problem was formulated as a mixed integer non-linear program( MINLP) to minimize the block probability of video packets. Secondly,combining the minimum packet block probability obtained in shortterm optimization and SU's constraint on hardware complexity,the partially observable Markov decision process( POMDP) framework was proposed to learn PU's statistic information over DCRNs.Moreover,based on the proposed framework,joint optimization strategy was designed to obtain the minimum packet loss rate in long-term video transmission. Numerical simulation results were provided to demonstrate validity of our strategies.
基金the Open Research Foundation of Science and Technology in Aerospace Flight Dynamics Laboratory of China(GF2018005).
文摘Recent studies of the space debris environment in Low Earth Orbit(LEO)have shown that the critical density of space debris has been reached in certain regions.The Active Debris Removal(ADR)mission,to mitigate the space debris density and stabilize the space debris environment,has been considered as a most effective method.In this paper,a novel two-level optimization strategy for multi-debris removal mission in LEO is proposed,which includes the low-level and high-level optimization process.To improve the overall performance of the multi-debris active removal mission and obtain multiple Pareto-optimal solutions,the ADR mission is seen as a Time-Dependant Traveling Salesman Problem(TDTSP)with two objective functions to minimize the total mission duration and the total propellant consumption.The problem includes the sequence optimization to determine the sequence of removal of space debris and the transferring optimization to define the orbital maneuvers.Two optimization models for the two-level optimization strategy are built in solving the multi-debris removal mission,and the optimal Pareto solution is successfully obtained by using the non-dominated sorting genetic algorithm II(NSGA-II).Two test cases are presented,which show that the low level optimization strategy can successfully obtain the optimal sequences and the initial solution of the ADR mission and the high level optimization strategy can efficiently and robustly find the feasible optimal solution for long duration perturbed rendezvous problem.
基金Supported by the National Natural Science Foundation of China(No.61701010,61571021,61601330)
文摘Considering dual distributed controllers, a design of optimal state estimation strategy is studied for the wireless sensor and actuator network(WSAN). In particular, the optimal linear quadratic(LQ) control strategy with estimated plant state is formulated as a non-cooperative game with network-induced delays. Then, using the Kalman filter approach, an optimal estimation of the plant state is obtained based on the information fusion of the distributed controllers. Finally, an optimal state estimation strategy is derived as a linear function of the current estimated plant state and the last control strategy of multiple controllers. The effectiveness of the proposed closed-loop control strategy is verified by the simulation experiments.
文摘Today, in the modern era, and under the pressure of rapid development around the kingdom regions, electric utilities are confronted with a myriad of challenges that include aging infrastructure, enhanced expectation of reliability, reduced cost, and coping effectively with uncertainties and changing regulation requirements. Indeed, for distribution systems, HV/MV substations represent a complex and critical physical asset that requires a careful evaluation of their maintenance practices aiming at more cost-effective tasks. The first concern of the electric power distribution company in Morocco is the optimization of the distribution network maintenance scheduling, to minimize system operating costs and ensure that the system is running most economically. There is significant pressure on power providers for greater system reliability and improvement of customer satisfaction, while similar emphasis is placed on cost reduction. These cost reductions focus on reducing operating and maintenance expenses, and minimizing investments in new plants and equipment. However, the present of the electricity distribution, influenced by a number of technical restrictions and strict regulatory requirements to meet, leads distribution utilities to search new ways of optimizing the maintenance management, make an effort to maximize profit by reducing their electricity supply and operation costs while maintaining their reliability, developing more effective activities, with lower costs. Furthermore, maximal HV/MV substation asset value and minimal maintenance cost are typical economic objectives of the electric utilities. The optimization of maintenance is one possible technique to reduce maintenance costs while improving reliability and utilities need to implement new strategies for more effective maintenance techniques and Asset Management (AM) methods programs to manage inspections and maintenance activities in order to control HV/MV substation equipment conditions. However, development of strategies to make sound decisions in order to effectively improve equipment and system reliability while meeting constraints such as a maintenance budget is a challenge. Finally, this paper describes the application of a new approach based Reliability Centered Maintenance (RCM) methodology to optimize maintenance resources and to the development of maintenance plan for HV/MV distribution substations. For this purpose, a case study was performed on the equipment of power distribution systems for the benefit of a holding company (ONEE Electricity Distribution) in Morocco. The present study was conducted in Oujda Exploitation Maintenance Service (OEXMS), in charge of operation and maintenance of distribution networks.
基金supported by Major International(Regional)Joint Research Project of the National Natural Science Foundation of China(61320106011)National High Technology Research and Development Program of China(863 Program)(2014AA052802)National Natural Science Foundation of China(61573224)