期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Shanghai Hua Tong Switchgear Works -A Major Switchgear Manufacturer for Power Transmission, Substation and Distribution in China
1
作者 Shao LingHua Tong Switchgear Works 《Electricity》 1996年第1期35-37,共3页
Founded in 1919, Shanghai Hua Tong Switchgear Works ("HTSW" in short for below) is one of large enterprises on state level. With high and new technology, it is designed as an export base for mechanical and e... Founded in 1919, Shanghai Hua Tong Switchgear Works ("HTSW" in short for below) is one of large enterprises on state level. With high and new technology, it is designed as an export base for mechanical and electrical product of the Ministry of Machinery Industry as well. It has been awarded the honor of first grade factory in the competition for key and major project construction in Shanghai year by year, 展开更多
关键词 A Major Switchgear Manufacturer for Power Transmission Shanghai Hua Tong Switchgear Works substation and distribution in China
下载PDF
Determining the Planning Period of a Distribution Substation Based on Acceptable Errors
2
作者 Gengwu Zhang Chengmin Wang +1 位作者 Lin Fu Haibing Wang 《CSEE Journal of Power and Energy Systems》 SCIE 2017年第3期296-301,共6页
The distribution substation planning is faced with numerous uncertainties so that the planning result can only be a“rough outline,”and the problem of determining the planning period arises.On the basis of the assess... The distribution substation planning is faced with numerous uncertainties so that the planning result can only be a“rough outline,”and the problem of determining the planning period arises.On the basis of the assessment of uncertainties in distribution planning,a specific approach to determine the planning period of a distribution substation based on acceptable errors is proposed,indicating that the load forecast error is the key factor to affect the planning period.In order to provide a clearer understanding of this paper’s primary objective,the proposed approach is applied to determining the planning period of a power supply radius optimization(PSRO)model in distribution substation planning.Finally,an example is illustrated which validates the suggested approach of this paper. 展开更多
关键词 Acceptable error distribution substation planning load forecast error planning period power supply radius optimization
原文传递
Optimal planning of high voltage distribution substations
3
作者 YU Yixin YAN Xuefei ZHANG Yongwu 《Frontiers of Electrical and Electronic Engineering in China》 CSCD 2007年第3期368-373,共6页
Aimed at solving the problem of optimal planning for high voltage distribution substations,an efficient method is put forward.The method divides the problem into two sub-problems:source locating and combina tional opt... Aimed at solving the problem of optimal planning for high voltage distribution substations,an efficient method is put forward.The method divides the problem into two sub-problems:source locating and combina tional optimization.The algorithm of allocating and locating alternatively(ALA)is widely used to deal with the source lo cating problem,but it is dependent on the initial location to a large degree.Thus,some modifications were made to the ALA algorithm,which could greatly improve the quality of solutions.In addition,considering the non-convex and nonconcave nature of the sub-problem of combinational optimization,the branch-and-bound technique was adopted to obtain or approximate a global optimal solution.To improve the efficiency of the branch-and-bound technique,some heuristic principles were proposed to cut those branches that may generate a global optimization solution with low probability.Examples show that the proposed algorithm meets the requirement of engineering and it is an effective approach to rapidly solve the problem of optimal planning for high voltage distribution substations. 展开更多
关键词 high voltage distribution substation sources locating ALA algorithm branch and bound technique combinational optimization
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部