With the current integration of distributed energy resources into the grid,the structure of distribution networks is becoming more complex.This complexity significantly expands the solution space in the optimization p...With the current integration of distributed energy resources into the grid,the structure of distribution networks is becoming more complex.This complexity significantly expands the solution space in the optimization process for network reconstruction using intelligent algorithms.Consequently,traditional intelligent algorithms frequently encounter insufficient search accuracy and become trapped in local optima.To tackle this issue,a more advanced particle swarm optimization algorithm is proposed.To address the varying emphases at different stages of the optimization process,a dynamic strategy is implemented to regulate the social and self-learning factors.The Metropolis criterion is introduced into the simulated annealing algorithm to occasionally accept suboptimal solutions,thereby mitigating premature convergence in the population optimization process.The inertia weight is adjusted using the logistic mapping technique to maintain a balance between the algorithm’s global and local search abilities.The incorporation of the Pareto principle involves the consideration of network losses and voltage deviations as objective functions.A fuzzy membership function is employed for selecting the results.Simulation analysis is carried out on the restructuring of the distribution network,using the IEEE-33 node system and the IEEE-69 node system as examples,in conjunction with the integration of distributed energy resources.The findings demonstrate that,in comparison to other intelligent optimization algorithms,the proposed enhanced algorithm demonstrates a shorter convergence time and effectively reduces active power losses within the network.Furthermore,it enhances the amplitude of node voltages,thereby improving the stability of distribution network operations and power supply quality.Additionally,the algorithm exhibits a high level of generality and applicability.展开更多
In this paper,a fault location method for the petal-shaped distribution network(PSDN)with inverter-interfaced distributed generators(IIDGs)is proposed to shorten the time of manual inspection.In order to calculate the...In this paper,a fault location method for the petal-shaped distribution network(PSDN)with inverter-interfaced distributed generators(IIDGs)is proposed to shorten the time of manual inspection.In order to calculate the fault position,the closed-loop structure of the PSDN is skillfully exploited,and the common control strategies of IIDGs are considered.For asymmetrical faults,a fault line identification formula based on the negative-sequence current phase differences is presented,and a fault location formula only utilizing the negative-sequence current amplitudes is derived to calculated the fault position.For symmetrical faults,the positive-sequence current at both ends of lines and the current output from IIDGs are used to identify the fault line,and the positive-sequence current on multiple lines are used to pinpoint the fault position.In this method,corresponding current phasors are separated into amplitudes and phases to satisfy the limitation of communication level.The simulation results show that the error is generally less than 1%,and the accuracy of the proposed method is not affected by the fault type,fault position,fault resistance,load current,and the IIDG penetration.展开更多
A distributed generation system(DG)has several benefits over a traditional centralized power system.However,the protection area in the case of the distributed generator requires special attention as it encounters stab...A distributed generation system(DG)has several benefits over a traditional centralized power system.However,the protection area in the case of the distributed generator requires special attention as it encounters stability loss,failure re-closure,fluctuations in voltage,etc.And thereby,it demands immediate attention in identifying the location&type of a fault without delay especially when occurred in a small,distributed generation system,as it would adversely affect the overall system and its operation.In the past,several methods were proposed for classification and localisation of a fault in a distributed generation system.Many of those methods were accurate in identifying location,but the accuracy in identifying the type of fault was not up to the acceptable mark.The proposed work here uses a shallow artificial neural network(sANN)model for identifying a particular type of fault that could happen in a specific distribution network when used in conjunction with distributed generators.Firstly,a distribution network consisting of two similar distributed generators(DG1 and DG2),one grid,and a 100 Km distribution line is modeled.Thereafter,different voltages and currents corresponding to various faults(line to line,line to ground)at different locations are tabulated,resulting in a matrix of 500×18 inputs.Secondly,the sANN is formulated for identifying the types of faults in the system in which the above-obtained data is used to train,validate,and test the neural network.The overall result shows an unprecedented almost zero percent error in identifying the type of the faults.展开更多
Combining with the characteristics of China's energy and the strategy of sustainable development, analyzing the pros and cons which caused by the appearance of DG and their operation connecting to grid, this paper...Combining with the characteristics of China's energy and the strategy of sustainable development, analyzing the pros and cons which caused by the appearance of DG and their operation connecting to grid, this paper points out that the two sides can achieve win-win under a reasonable combination between DG and distribution system, so as to optimize the allocation of resources, improve the utilization ratio of resource, and obtain maximum social benefit, harmoniously promote the development of power industry, economy and environment. As a word, this paper puts forward a new model of distribution network planning including DG and brings in penalty factorto guide the investment and construction of DG. Last of all, this paper presents the adoption of the coordination development coefficients which is to evaluate the power planning.展开更多
This study aims to address the feasibility of planned islanding operation and to investigate the effect of unplanned islanding using the master-slave islanding method for controlling the distributed generation units d...This study aims to address the feasibility of planned islanding operation and to investigate the effect of unplanned islanding using the master-slave islanding method for controlling the distributed generation units during grid-connected and islanding operation. Neplan desktop power simulation tool was used for the modelling and simulation of a realistic MV network with four different distributed generation technologies (diesel, gas, hydro and wind) along with their excitation and governor control systems, while an exponential model was used to represent the loads in the network. The dynamic and steady state behavior of the four distributed generation technologies were investigated during grid-connected operation and two transition modes to the islanding situation, planned and unplanned. The obtained results that validated through various case studies have shown that a suitable planned islanding transition could provide support to critical loads at the event of electricity utility outages.展开更多
This paper presents an efficient algorithm for optimization of radial distribution systems by a network reconfiguration to balance feeder loads and eliminate overload conditions. The system load-balancing index is use...This paper presents an efficient algorithm for optimization of radial distribution systems by a network reconfiguration to balance feeder loads and eliminate overload conditions. The system load-balancing index is used to determine the loading conditions of the system and maximum system loading capacity. The index value has to be minimum in the optimal network reconfiguration of load balancing. The tabu search algorithm is employed to search for the optimal network reconfiguration. The basic idea behind the search is a move from a current solution to its neighborhood by effectively utilizing a memory to provide an efficient search for optimality. It presents low computational effort and is able to find good quality configurations. Simulation results for a radial 69-bus system. The study results show that the optimal on/off patterns of the switches can be identified to give the best network reconfiguration involving balancing of feeder loads while respecting all the constraints.展开更多
Distributed Generation (DG) in any quantity is relevant to supplement the available energy capacity based on various locations, that is, whether a site specific or non-site specific energy technology. The evacuation i...Distributed Generation (DG) in any quantity is relevant to supplement the available energy capacity based on various locations, that is, whether a site specific or non-site specific energy technology. The evacuation infrastructure that delivers power to the distribution grid is designed with appropriate capacity in terms of size and length. The evacuation lines and distribution network however behave differently as they possess inherent characteristics and are exposed to varying external conditions. It is thus feasible to expect that these networks behave stochastically due to fault conditions and variable loads that destabilize the system. This in essence impacts on the availability of the evacuation infrastructure and consequently on the amount of energy delivered to the grid from the DG stations. Reliability of the evacuation point of a DG is however not a common or prioritized criteria in the decision process that guides investment in DG. This paper reviews a planned solar based DG plant in Uganda. Over the last couple of years, Uganda has seen a significant increase in the penetration levels of DG. With a network that is predominantly radial and experiences low reliability levels, one would thus expect reliability analysis to feature significantly in the assessment of the proposed DG plants. This is however not the case. This paper, uses reliability analysis to assess the impact of different evacuation options of the proposed DG plant on its dispatch levels. The evacuation options were selected based on infrastructure options in other locations with similar solar irradiances as the planned DG location. Outage data were collected and analyzed using the chi square method. It was found to be variable and fitting to different Probability Distribution Functions (PDF). Using stochastic methods, a model that incorporates the PDFs was developed to compute the reliability indices. These were assessed using chi square and found to be variable and fitting different PDFs as well. The viability of the project is reviewed based on Energy Not Supplied (ENS) and the anticipated project payback periods for any considered evacuation line. The results of the study are also reviewed for the benefit of other stakeholders like the customers, the utility and the regulatory body.展开更多
Solutions of inverse problems are required in various fields of science and engineering. The concept of network inversion has been studied as a neural-network-based solution to inverse problems. In general, inverse pr...Solutions of inverse problems are required in various fields of science and engineering. The concept of network inversion has been studied as a neural-network-based solution to inverse problems. In general, inverse problems are not limited to a real-valued area. Recently, complex-valued neural networks have been actively studied in the field of neural networks. As an extension of network inversion to complex numbers, a complex-valued network inversion has been proposed. Moreover, inverse problems for estimating the parameters of distributed generation systems such as distributed energy plants or smart grids from observed electric circuit data have been studied in the field of natural energy. These emphasize the need to handle complex numbers in an alternating current (AC) circuit. In this paper, the authors propose an application of the complex-valued network inversion to the inverse estimation of a distributed generation. Further, the authors confirm the effectiveness of the complex-valued network inversion on the basis of simulation results.展开更多
Distribution generation(DG)technology based on a variety of renewable energy technologies has developed rapidly.A large number of multi-type DG are connected to the distribution network(DN),resulting in a decline in t...Distribution generation(DG)technology based on a variety of renewable energy technologies has developed rapidly.A large number of multi-type DG are connected to the distribution network(DN),resulting in a decline in the stability of DN operation.It is urgent to find a method that can effectively connect multi-energy DG to DN.photovoltaic(PV),wind power generation(WPG),fuel cell(FC),and micro gas turbine(MGT)are considered in this paper.A multi-objective optimization model was established based on the life cycle cost(LCC)of DG,voltage quality,voltage fluctuation,system network loss,power deviation of the tie-line,DG pollution emission index,and meteorological index weight of DN.Multi-objective artificial bee colony algorithm(MOABC)was used to determine the optimal location and capacity of the four kinds of DG access DN,and compared with the other three heuristic algorithms.Simulation tests based on IEEE 33 test node and IEEE 69 test node show that in IEEE 33 test node,the total voltage deviation,voltage fluctuation,and system network loss of DN decreased by 49.67%,7.47%and 48.12%,respectively,compared with that without DG configuration.In the IEEE 69 test node,the total voltage deviation,voltage fluctuation and system network loss of DN in the MOABC configuration scheme decreased by 54.98%,35.93%and 75.17%,respectively,compared with that without DG configuration,indicating that MOABC can reasonably plan the capacity and location of DG.Achieve the maximum trade-off between DG economy and DN operation stability.展开更多
Due to the increasing demand of energy and the need for nonconventional energy sources, distributed generation (DG) has come into play. The trend of unidirectional power flow has been gradually shifting. With new tech...Due to the increasing demand of energy and the need for nonconventional energy sources, distributed generation (DG) has come into play. The trend of unidirectional power flow has been gradually shifting. With new technology comes new challenges, the introduction of DG into the conventional power system brings various challenges;one of the major challenges is system protection under DG sources. These sources pose a significant challenge due to bidirectional flows from DGs as well as lower fault current contribution from inverter interfaced DGs. This paper reviews existing protection schemes that have been suggested for active distribution networks. Most of these protection strategies apply only to smaller distribution systems implying that they may need to be extended to larger systems with a much higher penetration of distributed generation. In the end, a potential protection scheme has also been recommended as a future work.展开更多
Distributed generation (DG) is the future of energy. This technology allows the bidirectional flow of power within an electrical network. Researchers are faced with many challenges to the accurate implementation of pr...Distributed generation (DG) is the future of energy. This technology allows the bidirectional flow of power within an electrical network. Researchers are faced with many challenges to the accurate implementation of protection schemes for DG-connected distribution network. The schemes designed must satisfy the performance requirements of selectivity, reliability, and sensitivity. Most researchers opine that conventional protection schemes based on over current detection are insufficient to completely and accurately protect a DG-connected distributed power system. There are many challenges?that?need to be tackled before embarking upon the journey to successfully implement these schemes. This paper summarizes the major challenges which one can encounter while designing protection schemes for DG-connected distribution networks. Some possible solutions from the literature are also mentioned. Moreover, a suggested solution for protecting future active distribution networks is provided. It is expected that this paper will act as a benchmark for future researchers in this field to tackle the challenges related to the protection of active distribution networks.展开更多
The uncertainty of distributed generation energy has dramatically challenged the coordinated development of distribution networks at all levels.This paper focuses on the multi-time-scale regulation model of distribute...The uncertainty of distributed generation energy has dramatically challenged the coordinated development of distribution networks at all levels.This paper focuses on the multi-time-scale regulation model of distributed generation energy under normal conditions.The simulation results of the example verify the self-optimization characteristics and the effectiveness of real-time dispatching of the distribution network control technology at all levels under multiple time scales.展开更多
Nowadays, renewable energy resources play an important role in replacing conventional energy resources such as fossil fuel by integrating solar, wind and geothermal energy. Photovoltaic energy is one?of?the very promi...Nowadays, renewable energy resources play an important role in replacing conventional energy resources such as fossil fuel by integrating solar, wind and geothermal energy. Photovoltaic energy is one?of?the very promising renewable energy resources which grew rapidly in the past few years, it can be used to produce electric energy through photovoltaic process. The primary objective of the research proposed in this paper is to facilitate the increasing penetration levels of PV systems in the electric distribution networks. In this work, the PV module electrical model is presented based on the mathematical equations and was implemented on MATLAB to simulate the non-linear characteristics I-V and P-V curves with variable input parameters which are irradiance and temperature based on Riyadh region. In addition, the reliability evaluation of distribution networks, including distributed generators of solar photovoltaic (PV) with varying output power capacity is presented also. The Monte Carlo simulation algorithm is applied to test the distribution network which is RBTS Bus 2 and the same has been conducted on the original case of distribution network substation 7029 which is located at KSA Riyadh. The two distribution networks have been modified to include the PV’s distributed generators. The distributed generators contribute to supply a part of the load during normal mode and supply the entire load during component failure or failure of grid operation supply. The PV stochastic models have been used to simulate the randomness of these resources. Moreover, the study shows that the implementation and integration of renewable resources as distributed generations have improved the reliability of the distribution networks.展开更多
The utilization of wind generation equipment, such as DFIGs (double fed induction generators), interconnected to islanded power generation and distribution systems is investigated in order to determine their effects...The utilization of wind generation equipment, such as DFIGs (double fed induction generators), interconnected to islanded power generation and distribution systems is investigated in order to determine their effects on the overall system operating characteristics and stability. The use of a stable power station (with high speed machines) will be critical in achieving fast and reliable transient response to network events, in particular, when large transient loads are expected on a continuous basis, i.e., industrial mining and mineral processing equipment. Simulation results of this paper assist in understanding how small power stations and wind generation equipment respond to large transients in an islanded network. In particular, detailed simulations and analyses will be presented on impacts of distributed wind generation units (1.5 MW DF1G) on the stability of a small weak network. The novelty of this paper is on detailed analyses and simulation of weak networks with interconnects DFIG's including their impacts on system stability under various transient operating conditions.展开更多
In the context of clean and Low-carbon energy transformation and new power system,China^photovoltaic power generation will usher in great development.Its large-scale access impacts the safe and stable operation of the...In the context of clean and Low-carbon energy transformation and new power system,China^photovoltaic power generation will usher in great development.Its large-scale access impacts the safe and stable operation of the power grid with increasing significance.In order to strengthen the support and Leading roles of the standards,it is urgent to revise the national standard GB/T 29319-2012,Technical requirements for connecting photovoltaic power system to distribution network,based on the current development trend of photovoltaic power generation and power grid transformation needs.This paper firstly interprets the important technical provisions of the standard,then analyzes the problems in its implementation and finally proposes some revision suggestions in terms of grid adaptability,power control and fault crossing,to facilitate safe and orderly development of photovoltaic power generation in China.展开更多
Distributed Generation (DG) unlike centralized electrical generation aims to generate electrical energy on small scale as near as possible to the load centers, interchanging electric power with the network. Moreover, ...Distributed Generation (DG) unlike centralized electrical generation aims to generate electrical energy on small scale as near as possible to the load centers, interchanging electric power with the network. Moreover, DGs influence distribution system parameters such as reliability, loss reduction and efficiency while they are highly dependent on their situation in the distribution network. This paper focuses on optimal placement and estimation of DG capacity for installation and takes more number of significant parameters into account compare to the previous studies which consider just a few parameters for their optimization algorithms. Using a proposed optimal Genetic Algorithm, a destination function that includes the cost parameters (such as loss reduction, fuel price, etc.) has been optimized. This method is also capable of changing the weights of each cost parameter in the destination function of the Genetic Algorithm and the matrix of coefficients in the DIGSILENT environment. It has been applied and simulated on a sample IEEE 13-bus network. The obtained results show that any change in the weight of each parameter in the destination function of the Genetic Algorithm and in the matrix of coefficients leads to a meaningful change in the location and capacity of the prospective DG in the distribution network.展开更多
A great concern for the modern distribution grid is how well it can withstand and respond to adverse conditions. One way that utilities are addressing this issue is by adding redundancy to their systems. Likewise, dis...A great concern for the modern distribution grid is how well it can withstand and respond to adverse conditions. One way that utilities are addressing this issue is by adding redundancy to their systems. Likewise, distributed generation (DG) is becoming an increasingly popular asset at the distribution level and the idea of microgrids operating as standalone systems apart from the bulk electric grid is quickly becoming a reality. This allows for greater flexibility as systems can now take on exponentially more configurations than the radial, one-way distribution systems of the past. These added capabilities, however, make the system reconfiguration with a much more complex problem causing utilities to question if they are operating their distribution systems optimally. In addition, tools like Supervisory Control and Data Acquisition (SCADA) and Distribution Automation (DA) allow for systems to be reconfigured faster than humans can make decisions on how to reconfigure them. As a result, this paper seeks to develop an automated partitioning scheme for distribution systems that can respond to varying system conditions while ensuring a variety of operational constraints on the final configuration. It uses linear programming and graph theory. Power flow is calculated externally to the LP and a feedback loop is used to recalculate the solution if a violation is found. Application to test systems shows that it can reconfigure systems containing any number of loops resulting in a radial configuration. It can connect multiple sources to a single microgrid if more capacity is needed to supply the microgrid’s load.展开更多
In distribution systems,voltage levels of the various buses should be maintained within the permissible limits for satisfactory operation of all electrical installations and equipment.The task of voltage control is cl...In distribution systems,voltage levels of the various buses should be maintained within the permissible limits for satisfactory operation of all electrical installations and equipment.The task of voltage control is closely associated with fluctuating load conditions and corresponding requirements of reactive power compensation.The problem of load bus voltage optimization in distribution systems that have distributed generation(DG)has recently become an issue.In Oman,the distribution code limits the load bus voltage variations within±6%of the nominal value.Several voltage control methods are employed in active distribution systems with a high share of photovoltaic systems(PV)to keep the voltage levels within the desirable limits.In addition to the constraint of targeting the best voltage profile,another constraint has to be achieved which is the minimum loss in the distribution network.An optimised solution for voltage of load busses with on-load tap-changing(OLTC)tarnsformers and PV sources is presented in this paper.This study addresses the problem of optimizing the injected power from PV systems associated with the facilities of tap-changing transformers,as it is an important means of controlling voltage throughout the system.To avoid violating tap-changing constraints,a method is depicted for determining the minimal changes in transformer taps to control voltage levels with distributed PV sources.The taps of a range+5 to-15%,can be achieved by tap-changing transformers.The OLTC operation was designed to keep the secondary bus within the voltage standard for MV networks.展开更多
Energy efficiency assessment of distribution network containing distributed generation is one of the core contents of power grid construction. Aiming at the lack of a quantitative evaluation method for energy efficien...Energy efficiency assessment of distribution network containing distributed generation is one of the core contents of power grid construction. Aiming at the lack of a quantitative evaluation method for energy efficiency of distribution network containing distributed generation, a novel energy efficiency assessment method based on the super-efficiency model is proposed. Starting from the basic elements and operational requirements of the distribution network containing distributed generation, the energy efficiency assessment metric set is constructed. On this basis, the concept of generalized energy efficiency function is defined, and the super-efficiency model is used to assess the energy efficiency of the distribution network containing distributed generation. Finally, an example is given to evaluate and analyze energy efficiency. The results confirm the validity of the proposed method.展开更多
Nowadays the optimal allocation of distributed generation (DG) in the distribution network becomes the popular research area in restructuring of power system. The capacitor banks introduced in the distribution network...Nowadays the optimal allocation of distributed generation (DG) in the distribution network becomes the popular research area in restructuring of power system. The capacitor banks introduced in the distribution networks for reactive power compensation also have the capacity to minimize the real and reactive power losses occurred in the system. Hence, this research integrates the allocation of renewable energy DG and capacitor banks in the radial distribution network to minimize the real power loss occurred in the system. A two-stage methodology is used for simultaneous allocation of renewable DG and capacitor banks. The optimum location of renewable energy DG and capacitor banks is determined using the distributed generation sitting index (DGSI) ranking method and the optimum sizing of DG and capacitor banks is found out for simultaneous placement using weight improved particle swarm optimization algorithm (WIPSO) and self adaptive differential evolution algorithm (SADE). This two-stage methodology reduces the burden of SADE and WIPSO algorithm, by using the DGSI index in determining the optimal location. Hence the computational time gets reduced which makes them suitable for online applications. By using the above methodology, a comprehensive performance analysis is done on IEEE 33 bus and 69 bus RDNs and the results are discussed in detail.展开更多
基金This research is supported by the Science and Technology Program of Gansu Province(No.23JRRA880).
文摘With the current integration of distributed energy resources into the grid,the structure of distribution networks is becoming more complex.This complexity significantly expands the solution space in the optimization process for network reconstruction using intelligent algorithms.Consequently,traditional intelligent algorithms frequently encounter insufficient search accuracy and become trapped in local optima.To tackle this issue,a more advanced particle swarm optimization algorithm is proposed.To address the varying emphases at different stages of the optimization process,a dynamic strategy is implemented to regulate the social and self-learning factors.The Metropolis criterion is introduced into the simulated annealing algorithm to occasionally accept suboptimal solutions,thereby mitigating premature convergence in the population optimization process.The inertia weight is adjusted using the logistic mapping technique to maintain a balance between the algorithm’s global and local search abilities.The incorporation of the Pareto principle involves the consideration of network losses and voltage deviations as objective functions.A fuzzy membership function is employed for selecting the results.Simulation analysis is carried out on the restructuring of the distribution network,using the IEEE-33 node system and the IEEE-69 node system as examples,in conjunction with the integration of distributed energy resources.The findings demonstrate that,in comparison to other intelligent optimization algorithms,the proposed enhanced algorithm demonstrates a shorter convergence time and effectively reduces active power losses within the network.Furthermore,it enhances the amplitude of node voltages,thereby improving the stability of distribution network operations and power supply quality.Additionally,the algorithm exhibits a high level of generality and applicability.
基金supported by State Grid Science and Technology Project:Research on Key Protection Technologies for New-type Urban Distribution Network with Controllable Sources and Loads(5100-201913019A-0-0-00).
文摘In this paper,a fault location method for the petal-shaped distribution network(PSDN)with inverter-interfaced distributed generators(IIDGs)is proposed to shorten the time of manual inspection.In order to calculate the fault position,the closed-loop structure of the PSDN is skillfully exploited,and the common control strategies of IIDGs are considered.For asymmetrical faults,a fault line identification formula based on the negative-sequence current phase differences is presented,and a fault location formula only utilizing the negative-sequence current amplitudes is derived to calculated the fault position.For symmetrical faults,the positive-sequence current at both ends of lines and the current output from IIDGs are used to identify the fault line,and the positive-sequence current on multiple lines are used to pinpoint the fault position.In this method,corresponding current phasors are separated into amplitudes and phases to satisfy the limitation of communication level.The simulation results show that the error is generally less than 1%,and the accuracy of the proposed method is not affected by the fault type,fault position,fault resistance,load current,and the IIDG penetration.
文摘A distributed generation system(DG)has several benefits over a traditional centralized power system.However,the protection area in the case of the distributed generator requires special attention as it encounters stability loss,failure re-closure,fluctuations in voltage,etc.And thereby,it demands immediate attention in identifying the location&type of a fault without delay especially when occurred in a small,distributed generation system,as it would adversely affect the overall system and its operation.In the past,several methods were proposed for classification and localisation of a fault in a distributed generation system.Many of those methods were accurate in identifying location,but the accuracy in identifying the type of fault was not up to the acceptable mark.The proposed work here uses a shallow artificial neural network(sANN)model for identifying a particular type of fault that could happen in a specific distribution network when used in conjunction with distributed generators.Firstly,a distribution network consisting of two similar distributed generators(DG1 and DG2),one grid,and a 100 Km distribution line is modeled.Thereafter,different voltages and currents corresponding to various faults(line to line,line to ground)at different locations are tabulated,resulting in a matrix of 500×18 inputs.Secondly,the sANN is formulated for identifying the types of faults in the system in which the above-obtained data is used to train,validate,and test the neural network.The overall result shows an unprecedented almost zero percent error in identifying the type of the faults.
文摘Combining with the characteristics of China's energy and the strategy of sustainable development, analyzing the pros and cons which caused by the appearance of DG and their operation connecting to grid, this paper points out that the two sides can achieve win-win under a reasonable combination between DG and distribution system, so as to optimize the allocation of resources, improve the utilization ratio of resource, and obtain maximum social benefit, harmoniously promote the development of power industry, economy and environment. As a word, this paper puts forward a new model of distribution network planning including DG and brings in penalty factorto guide the investment and construction of DG. Last of all, this paper presents the adoption of the coordination development coefficients which is to evaluate the power planning.
文摘This study aims to address the feasibility of planned islanding operation and to investigate the effect of unplanned islanding using the master-slave islanding method for controlling the distributed generation units during grid-connected and islanding operation. Neplan desktop power simulation tool was used for the modelling and simulation of a realistic MV network with four different distributed generation technologies (diesel, gas, hydro and wind) along with their excitation and governor control systems, while an exponential model was used to represent the loads in the network. The dynamic and steady state behavior of the four distributed generation technologies were investigated during grid-connected operation and two transition modes to the islanding situation, planned and unplanned. The obtained results that validated through various case studies have shown that a suitable planned islanding transition could provide support to critical loads at the event of electricity utility outages.
文摘This paper presents an efficient algorithm for optimization of radial distribution systems by a network reconfiguration to balance feeder loads and eliminate overload conditions. The system load-balancing index is used to determine the loading conditions of the system and maximum system loading capacity. The index value has to be minimum in the optimal network reconfiguration of load balancing. The tabu search algorithm is employed to search for the optimal network reconfiguration. The basic idea behind the search is a move from a current solution to its neighborhood by effectively utilizing a memory to provide an efficient search for optimality. It presents low computational effort and is able to find good quality configurations. Simulation results for a radial 69-bus system. The study results show that the optimal on/off patterns of the switches can be identified to give the best network reconfiguration involving balancing of feeder loads while respecting all the constraints.
文摘Distributed Generation (DG) in any quantity is relevant to supplement the available energy capacity based on various locations, that is, whether a site specific or non-site specific energy technology. The evacuation infrastructure that delivers power to the distribution grid is designed with appropriate capacity in terms of size and length. The evacuation lines and distribution network however behave differently as they possess inherent characteristics and are exposed to varying external conditions. It is thus feasible to expect that these networks behave stochastically due to fault conditions and variable loads that destabilize the system. This in essence impacts on the availability of the evacuation infrastructure and consequently on the amount of energy delivered to the grid from the DG stations. Reliability of the evacuation point of a DG is however not a common or prioritized criteria in the decision process that guides investment in DG. This paper reviews a planned solar based DG plant in Uganda. Over the last couple of years, Uganda has seen a significant increase in the penetration levels of DG. With a network that is predominantly radial and experiences low reliability levels, one would thus expect reliability analysis to feature significantly in the assessment of the proposed DG plants. This is however not the case. This paper, uses reliability analysis to assess the impact of different evacuation options of the proposed DG plant on its dispatch levels. The evacuation options were selected based on infrastructure options in other locations with similar solar irradiances as the planned DG location. Outage data were collected and analyzed using the chi square method. It was found to be variable and fitting to different Probability Distribution Functions (PDF). Using stochastic methods, a model that incorporates the PDFs was developed to compute the reliability indices. These were assessed using chi square and found to be variable and fitting different PDFs as well. The viability of the project is reviewed based on Energy Not Supplied (ENS) and the anticipated project payback periods for any considered evacuation line. The results of the study are also reviewed for the benefit of other stakeholders like the customers, the utility and the regulatory body.
文摘Solutions of inverse problems are required in various fields of science and engineering. The concept of network inversion has been studied as a neural-network-based solution to inverse problems. In general, inverse problems are not limited to a real-valued area. Recently, complex-valued neural networks have been actively studied in the field of neural networks. As an extension of network inversion to complex numbers, a complex-valued network inversion has been proposed. Moreover, inverse problems for estimating the parameters of distributed generation systems such as distributed energy plants or smart grids from observed electric circuit data have been studied in the field of natural energy. These emphasize the need to handle complex numbers in an alternating current (AC) circuit. In this paper, the authors propose an application of the complex-valued network inversion to the inverse estimation of a distributed generation. Further, the authors confirm the effectiveness of the complex-valued network inversion on the basis of simulation results.
文摘Distribution generation(DG)technology based on a variety of renewable energy technologies has developed rapidly.A large number of multi-type DG are connected to the distribution network(DN),resulting in a decline in the stability of DN operation.It is urgent to find a method that can effectively connect multi-energy DG to DN.photovoltaic(PV),wind power generation(WPG),fuel cell(FC),and micro gas turbine(MGT)are considered in this paper.A multi-objective optimization model was established based on the life cycle cost(LCC)of DG,voltage quality,voltage fluctuation,system network loss,power deviation of the tie-line,DG pollution emission index,and meteorological index weight of DN.Multi-objective artificial bee colony algorithm(MOABC)was used to determine the optimal location and capacity of the four kinds of DG access DN,and compared with the other three heuristic algorithms.Simulation tests based on IEEE 33 test node and IEEE 69 test node show that in IEEE 33 test node,the total voltage deviation,voltage fluctuation,and system network loss of DN decreased by 49.67%,7.47%and 48.12%,respectively,compared with that without DG configuration.In the IEEE 69 test node,the total voltage deviation,voltage fluctuation and system network loss of DN in the MOABC configuration scheme decreased by 54.98%,35.93%and 75.17%,respectively,compared with that without DG configuration,indicating that MOABC can reasonably plan the capacity and location of DG.Achieve the maximum trade-off between DG economy and DN operation stability.
文摘Due to the increasing demand of energy and the need for nonconventional energy sources, distributed generation (DG) has come into play. The trend of unidirectional power flow has been gradually shifting. With new technology comes new challenges, the introduction of DG into the conventional power system brings various challenges;one of the major challenges is system protection under DG sources. These sources pose a significant challenge due to bidirectional flows from DGs as well as lower fault current contribution from inverter interfaced DGs. This paper reviews existing protection schemes that have been suggested for active distribution networks. Most of these protection strategies apply only to smaller distribution systems implying that they may need to be extended to larger systems with a much higher penetration of distributed generation. In the end, a potential protection scheme has also been recommended as a future work.
文摘Distributed generation (DG) is the future of energy. This technology allows the bidirectional flow of power within an electrical network. Researchers are faced with many challenges to the accurate implementation of protection schemes for DG-connected distribution network. The schemes designed must satisfy the performance requirements of selectivity, reliability, and sensitivity. Most researchers opine that conventional protection schemes based on over current detection are insufficient to completely and accurately protect a DG-connected distributed power system. There are many challenges?that?need to be tackled before embarking upon the journey to successfully implement these schemes. This paper summarizes the major challenges which one can encounter while designing protection schemes for DG-connected distribution networks. Some possible solutions from the literature are also mentioned. Moreover, a suggested solution for protecting future active distribution networks is provided. It is expected that this paper will act as a benchmark for future researchers in this field to tackle the challenges related to the protection of active distribution networks.
文摘The uncertainty of distributed generation energy has dramatically challenged the coordinated development of distribution networks at all levels.This paper focuses on the multi-time-scale regulation model of distributed generation energy under normal conditions.The simulation results of the example verify the self-optimization characteristics and the effectiveness of real-time dispatching of the distribution network control technology at all levels under multiple time scales.
文摘Nowadays, renewable energy resources play an important role in replacing conventional energy resources such as fossil fuel by integrating solar, wind and geothermal energy. Photovoltaic energy is one?of?the very promising renewable energy resources which grew rapidly in the past few years, it can be used to produce electric energy through photovoltaic process. The primary objective of the research proposed in this paper is to facilitate the increasing penetration levels of PV systems in the electric distribution networks. In this work, the PV module electrical model is presented based on the mathematical equations and was implemented on MATLAB to simulate the non-linear characteristics I-V and P-V curves with variable input parameters which are irradiance and temperature based on Riyadh region. In addition, the reliability evaluation of distribution networks, including distributed generators of solar photovoltaic (PV) with varying output power capacity is presented also. The Monte Carlo simulation algorithm is applied to test the distribution network which is RBTS Bus 2 and the same has been conducted on the original case of distribution network substation 7029 which is located at KSA Riyadh. The two distribution networks have been modified to include the PV’s distributed generators. The distributed generators contribute to supply a part of the load during normal mode and supply the entire load during component failure or failure of grid operation supply. The PV stochastic models have been used to simulate the randomness of these resources. Moreover, the study shows that the implementation and integration of renewable resources as distributed generations have improved the reliability of the distribution networks.
文摘The utilization of wind generation equipment, such as DFIGs (double fed induction generators), interconnected to islanded power generation and distribution systems is investigated in order to determine their effects on the overall system operating characteristics and stability. The use of a stable power station (with high speed machines) will be critical in achieving fast and reliable transient response to network events, in particular, when large transient loads are expected on a continuous basis, i.e., industrial mining and mineral processing equipment. Simulation results of this paper assist in understanding how small power stations and wind generation equipment respond to large transients in an islanded network. In particular, detailed simulations and analyses will be presented on impacts of distributed wind generation units (1.5 MW DF1G) on the stability of a small weak network. The novelty of this paper is on detailed analyses and simulation of weak networks with interconnects DFIG's including their impacts on system stability under various transient operating conditions.
文摘In the context of clean and Low-carbon energy transformation and new power system,China^photovoltaic power generation will usher in great development.Its large-scale access impacts the safe and stable operation of the power grid with increasing significance.In order to strengthen the support and Leading roles of the standards,it is urgent to revise the national standard GB/T 29319-2012,Technical requirements for connecting photovoltaic power system to distribution network,based on the current development trend of photovoltaic power generation and power grid transformation needs.This paper firstly interprets the important technical provisions of the standard,then analyzes the problems in its implementation and finally proposes some revision suggestions in terms of grid adaptability,power control and fault crossing,to facilitate safe and orderly development of photovoltaic power generation in China.
文摘Distributed Generation (DG) unlike centralized electrical generation aims to generate electrical energy on small scale as near as possible to the load centers, interchanging electric power with the network. Moreover, DGs influence distribution system parameters such as reliability, loss reduction and efficiency while they are highly dependent on their situation in the distribution network. This paper focuses on optimal placement and estimation of DG capacity for installation and takes more number of significant parameters into account compare to the previous studies which consider just a few parameters for their optimization algorithms. Using a proposed optimal Genetic Algorithm, a destination function that includes the cost parameters (such as loss reduction, fuel price, etc.) has been optimized. This method is also capable of changing the weights of each cost parameter in the destination function of the Genetic Algorithm and the matrix of coefficients in the DIGSILENT environment. It has been applied and simulated on a sample IEEE 13-bus network. The obtained results show that any change in the weight of each parameter in the destination function of the Genetic Algorithm and in the matrix of coefficients leads to a meaningful change in the location and capacity of the prospective DG in the distribution network.
文摘A great concern for the modern distribution grid is how well it can withstand and respond to adverse conditions. One way that utilities are addressing this issue is by adding redundancy to their systems. Likewise, distributed generation (DG) is becoming an increasingly popular asset at the distribution level and the idea of microgrids operating as standalone systems apart from the bulk electric grid is quickly becoming a reality. This allows for greater flexibility as systems can now take on exponentially more configurations than the radial, one-way distribution systems of the past. These added capabilities, however, make the system reconfiguration with a much more complex problem causing utilities to question if they are operating their distribution systems optimally. In addition, tools like Supervisory Control and Data Acquisition (SCADA) and Distribution Automation (DA) allow for systems to be reconfigured faster than humans can make decisions on how to reconfigure them. As a result, this paper seeks to develop an automated partitioning scheme for distribution systems that can respond to varying system conditions while ensuring a variety of operational constraints on the final configuration. It uses linear programming and graph theory. Power flow is calculated externally to the LP and a feedback loop is used to recalculate the solution if a violation is found. Application to test systems shows that it can reconfigure systems containing any number of loops resulting in a radial configuration. It can connect multiple sources to a single microgrid if more capacity is needed to supply the microgrid’s load.
文摘In distribution systems,voltage levels of the various buses should be maintained within the permissible limits for satisfactory operation of all electrical installations and equipment.The task of voltage control is closely associated with fluctuating load conditions and corresponding requirements of reactive power compensation.The problem of load bus voltage optimization in distribution systems that have distributed generation(DG)has recently become an issue.In Oman,the distribution code limits the load bus voltage variations within±6%of the nominal value.Several voltage control methods are employed in active distribution systems with a high share of photovoltaic systems(PV)to keep the voltage levels within the desirable limits.In addition to the constraint of targeting the best voltage profile,another constraint has to be achieved which is the minimum loss in the distribution network.An optimised solution for voltage of load busses with on-load tap-changing(OLTC)tarnsformers and PV sources is presented in this paper.This study addresses the problem of optimizing the injected power from PV systems associated with the facilities of tap-changing transformers,as it is an important means of controlling voltage throughout the system.To avoid violating tap-changing constraints,a method is depicted for determining the minimal changes in transformer taps to control voltage levels with distributed PV sources.The taps of a range+5 to-15%,can be achieved by tap-changing transformers.The OLTC operation was designed to keep the secondary bus within the voltage standard for MV networks.
文摘Energy efficiency assessment of distribution network containing distributed generation is one of the core contents of power grid construction. Aiming at the lack of a quantitative evaluation method for energy efficiency of distribution network containing distributed generation, a novel energy efficiency assessment method based on the super-efficiency model is proposed. Starting from the basic elements and operational requirements of the distribution network containing distributed generation, the energy efficiency assessment metric set is constructed. On this basis, the concept of generalized energy efficiency function is defined, and the super-efficiency model is used to assess the energy efficiency of the distribution network containing distributed generation. Finally, an example is given to evaluate and analyze energy efficiency. The results confirm the validity of the proposed method.
文摘Nowadays the optimal allocation of distributed generation (DG) in the distribution network becomes the popular research area in restructuring of power system. The capacitor banks introduced in the distribution networks for reactive power compensation also have the capacity to minimize the real and reactive power losses occurred in the system. Hence, this research integrates the allocation of renewable energy DG and capacitor banks in the radial distribution network to minimize the real power loss occurred in the system. A two-stage methodology is used for simultaneous allocation of renewable DG and capacitor banks. The optimum location of renewable energy DG and capacitor banks is determined using the distributed generation sitting index (DGSI) ranking method and the optimum sizing of DG and capacitor banks is found out for simultaneous placement using weight improved particle swarm optimization algorithm (WIPSO) and self adaptive differential evolution algorithm (SADE). This two-stage methodology reduces the burden of SADE and WIPSO algorithm, by using the DGSI index in determining the optimal location. Hence the computational time gets reduced which makes them suitable for online applications. By using the above methodology, a comprehensive performance analysis is done on IEEE 33 bus and 69 bus RDNs and the results are discussed in detail.