Four rainwater diversion patterns including undisturbed soil ditch (T1), slope compaction (T2), asbestos sheet covering after compac- tion (T3) and plastic film covering after compaction (T4) were set in cornf...Four rainwater diversion patterns including undisturbed soil ditch (T1), slope compaction (T2), asbestos sheet covering after compac- tion (T3) and plastic film covering after compaction (T4) were set in cornfield in arid areas of Yunnan Province, and effects of various patterns on rainwater collection efficiency, water utilization efficiency and corn yield were studied. The results shows that rainwater collection efficiency, water utilization efficiency and corn yield of the four diversion patterns presented the same trend, namely T4 〉T3 〉T2 〉T1. Overall, rainwater collection efficiencies of the four diversion patterns ranged from 41.7% to 58.7% ; compared with T1, water utilization efficiencies of T2 ,T3 and T4 increased by 34.9%, 53.5% and 92.5%, and maize yields of them improved by 1 767.0, 1 981.5 and 2 385.0 kg/hm2.展开更多
The Haidong Tunnel is one of the four soft rock tunnels of the Central Yunnan Water Diversion Project(CYWDP),where large deformation hazards of soft rock occur frequently,which seriously affect construction safety.The...The Haidong Tunnel is one of the four soft rock tunnels of the Central Yunnan Water Diversion Project(CYWDP),where large deformation hazards of soft rock occur frequently,which seriously affect construction safety.The effect of highly prestressed anchor cable support was studied based on the active support test in the No.3 branch tunnel of Haidong Tunnel.Firstly,the geological conditions and failure causes were analyzed on the basis of the results of geological survey,in-situ test,and rock laboratory test.Then,the Mohr circle form of the highly prestressed anchor cable active support theory for the support of bedded rock mass was given in combination with the excavation compensation method.It is considered that the prestress active compensation value required for the bedded rock mass is larger than that for the homogeneous rock mass.The deformations of rock mass under both passive and active supports were analyzed by numerical simulations.Furthermore,the'pressure bubble'mechanical model for anchor cable support of bedded rock mass in Haidong Tunnel is given.Field monitoring results show that the highly prestressed anchor cable support can control rock mass deformation well,with a maximum deformation of about 200 mm.The prestressed anchor cable is effective in the bedded stratum,which makes the stress of rock mass uniform and reduces the risk of failure of steel arches due to local bias.Meanwhile,the expansion of plastic zone was efficiently controlled,which is of positive significance for the overall stability of rock mass.展开更多
为预防和控制引水隧洞中围岩失稳事故的发生,将物元可拓法应用于围岩稳定性评价中。以滇中引水工程为背景,选取滇中引水工程某隧洞段,构建引水隧洞围岩稳定性评价指标体系,划分围岩等级,选用灰色关联分析法(Grey Relational Analysis, G...为预防和控制引水隧洞中围岩失稳事故的发生,将物元可拓法应用于围岩稳定性评价中。以滇中引水工程为背景,选取滇中引水工程某隧洞段,构建引水隧洞围岩稳定性评价指标体系,划分围岩等级,选用灰色关联分析法(Grey Relational Analysis, GRA)和因子分析法(Factor Analysis, FA)组合确定权重,基于物元可拓模型进行引水隧洞围岩稳定性评价,以期减少目前评价方法中一些不相容现象及其他问题所带来的影响,从而提升长距离特大输水工程围岩稳定性等级评价的精度。结果表明,GRA-FA-物元可拓模型围岩稳定性评价结果与实际等级基本相符,与逼近理想解排序法(Technique for Order Preference by Similarity to Ideal Solution, TOPSIS)相比,预测评价精度从62.5%提升到87.5%,准确性提升了约25百分点。因此,GRA-FA-物元可拓模型相较以往的评价模型可以更全面和客观地进行引水隧洞围岩稳定性评价,可为其他长距离特大引水工程施工风险评价提供理论支撑。展开更多
基金Supported by the National Key Technology R&D Program(2012BAD40B02)
文摘Four rainwater diversion patterns including undisturbed soil ditch (T1), slope compaction (T2), asbestos sheet covering after compac- tion (T3) and plastic film covering after compaction (T4) were set in cornfield in arid areas of Yunnan Province, and effects of various patterns on rainwater collection efficiency, water utilization efficiency and corn yield were studied. The results shows that rainwater collection efficiency, water utilization efficiency and corn yield of the four diversion patterns presented the same trend, namely T4 〉T3 〉T2 〉T1. Overall, rainwater collection efficiencies of the four diversion patterns ranged from 41.7% to 58.7% ; compared with T1, water utilization efficiencies of T2 ,T3 and T4 increased by 34.9%, 53.5% and 92.5%, and maize yields of them improved by 1 767.0, 1 981.5 and 2 385.0 kg/hm2.
基金supported by the China Yunnan Province Major Science and Technology Special Plan Foundation Project(Grant No.202002AF080003)the China Railway No.5 Engineering Group Co.,Ltd.The support is greatly appreciated.
文摘The Haidong Tunnel is one of the four soft rock tunnels of the Central Yunnan Water Diversion Project(CYWDP),where large deformation hazards of soft rock occur frequently,which seriously affect construction safety.The effect of highly prestressed anchor cable support was studied based on the active support test in the No.3 branch tunnel of Haidong Tunnel.Firstly,the geological conditions and failure causes were analyzed on the basis of the results of geological survey,in-situ test,and rock laboratory test.Then,the Mohr circle form of the highly prestressed anchor cable active support theory for the support of bedded rock mass was given in combination with the excavation compensation method.It is considered that the prestress active compensation value required for the bedded rock mass is larger than that for the homogeneous rock mass.The deformations of rock mass under both passive and active supports were analyzed by numerical simulations.Furthermore,the'pressure bubble'mechanical model for anchor cable support of bedded rock mass in Haidong Tunnel is given.Field monitoring results show that the highly prestressed anchor cable support can control rock mass deformation well,with a maximum deformation of about 200 mm.The prestressed anchor cable is effective in the bedded stratum,which makes the stress of rock mass uniform and reduces the risk of failure of steel arches due to local bias.Meanwhile,the expansion of plastic zone was efficiently controlled,which is of positive significance for the overall stability of rock mass.
文摘为预防和控制引水隧洞中围岩失稳事故的发生,将物元可拓法应用于围岩稳定性评价中。以滇中引水工程为背景,选取滇中引水工程某隧洞段,构建引水隧洞围岩稳定性评价指标体系,划分围岩等级,选用灰色关联分析法(Grey Relational Analysis, GRA)和因子分析法(Factor Analysis, FA)组合确定权重,基于物元可拓模型进行引水隧洞围岩稳定性评价,以期减少目前评价方法中一些不相容现象及其他问题所带来的影响,从而提升长距离特大输水工程围岩稳定性等级评价的精度。结果表明,GRA-FA-物元可拓模型围岩稳定性评价结果与实际等级基本相符,与逼近理想解排序法(Technique for Order Preference by Similarity to Ideal Solution, TOPSIS)相比,预测评价精度从62.5%提升到87.5%,准确性提升了约25百分点。因此,GRA-FA-物元可拓模型相较以往的评价模型可以更全面和客观地进行引水隧洞围岩稳定性评价,可为其他长距离特大引水工程施工风险评价提供理论支撑。