In recent years,several failures of double circuit transmission line on the same tower due to lightning were happened in Beijing power grid.Although it can be reclosed successful,the lightning strike caused a grave th...In recent years,several failures of double circuit transmission line on the same tower due to lightning were happened in Beijing power grid.Although it can be reclosed successful,the lightning strike caused a grave threat to the power grid security.The cause of the accident and the accident process were studied for the sake of further understanding of the impact of lightning on power grid.As an example,110 kV double circuit transmission line(Xilong-line) was analyzed.At first,the system topology was given.Through the analysis on relay protection actions and the fault recorder data,over voltage on the insulator strings was calculated.Based on the analysis and the calculation,accident cause and the process were presented respectively.Secondly,it comes to the conclusion that the lightning failure was caused by counterattack.The wave of the lightning over voltage would spread to the not grounded neutral point of the transformers,and make the neutral protective gap breakdown,then cause freewheeling with the frequency of 50 Hz.As results of the relay protection,the double circuit transmission line all tripped out.Finally,the causes of the accident were proposed that included terrain features,large corner towers,strong thunderstorm weather and poor grounded contact of the tower.展开更多
With rapid growth of power demand, transmission capacity is also in urgent need of upgrading. In some cases, converting existing AC transmission lines to DC lines can Improve the transmission capacity and reduce the c...With rapid growth of power demand, transmission capacity is also in urgent need of upgrading. In some cases, converting existing AC transmission lines to DC lines can Improve the transmission capacity and reduce the construction investment. In this paper, the upstream finite element method was expanded to calculate the total electric field of same tower multi-circuit DC lines converted from double-circuit AC lines, and the validity of the algorithm was confirmed by experiments. Taking a DC line converted from a typical same tower 500 kV double-circuit AC transmission line as an example, the surface electric field and the ground total electric field in different pole conductor arrangement schemes were calculated and analyzed, and the critical height of pole conductors for DC lines in residential and non-residential area were determined. Then, the corridor width of DC and AC lines at critical height in residential and non-residential areas before and after AC-DC line transformation were compared. The results indicate that for DC lines converted from common 500 kV double-circuit AC lines, the ground total electric field can meet the requirements of corresponding standard with appropriate pole conductor arrangement schemes.展开更多
Anewfault location algorithmfor double-circuit transmissionlines is described inthis paper.Theproposed method uses data extractedfromtwo ends of the transmissionlines andthus eliminates the effects ofthe source impeda...Anewfault location algorithmfor double-circuit transmissionlines is described inthis paper.Theproposed method uses data extractedfromtwo ends of the transmissionlines andthus eliminates the effects ofthe source impedance andthe fault resistance.The distributed parameter model and the modal transformationare also employed.Depending on modal transformation,the coupled equations of the lines are converted intodecoupled ones.Inthis way,the mutual coupling effects between adjacent circuits of the lines are eliminatedandtherefore an accurate fault location can be achieved.The proposed methodis tested via digital simulationusing EMTP in conjunction with MATLAB.The test results corroborate the high accuracy of the proposedmethod.展开更多
An accurate fault location algorithm for double-circuit series compensated lines is presented.Use of two-end unsynchronized measurements of current and voltage signals is considered.The algorithm applies two subroutin...An accurate fault location algorithm for double-circuit series compensated lines is presented.Use of two-end unsynchronized measurements of current and voltage signals is considered.The algorithm applies two subroutines,designated for locating faults on particular line sections,and additionally the procedure for selecting the valid subroutine.The subroutines are formulated with use of the generalized fault loop model and the distributed parameter line model is applied.Performed ATP-EMTP based evaluation has shown the validity of the derived fault location algorithm and its high accuracy.展开更多
In order to improve the reliability of fault identification of the double-circuit transmission lines on the same tower, a new algorithm for fast protection of double-circuit transmission lines on the same tower based ...In order to improve the reliability of fault identification of the double-circuit transmission lines on the same tower, a new algorithm for fast protection of double-circuit transmission lines on the same tower based on the reactive powers of traveling wave is proposed. With the implementation of S-transform, the initial traveling wave reactive powers are calculated and the change characteristics of reactive power under different fault conditions are studied. The protection criterion is constructed by analyzing the ratio of the reactive powers of the same end on double-circuit transmission lines and the ratio of the reactive powers at both ends on the same line. According to the ratio of reactive power on the same side of the line and both ends of the same line, it is possible to identify whether the faults of the double-circuit line of the same tower occurred in or out of the protection zone. A large number of simulation results show that the protection performance is sensitive and reliable, and quick to respond. The criterion is simple and is basically not affected by fault initial angles, fault types, and transitional resistances.展开更多
Design and characterization of a G-band(140–220 GHz) terahertz monolithic integrated circuit(TMIC) amplifier in eight-stage common-emitter topology are performed based on the 0.5-μm In Ga As/In P double heteroju...Design and characterization of a G-band(140–220 GHz) terahertz monolithic integrated circuit(TMIC) amplifier in eight-stage common-emitter topology are performed based on the 0.5-μm In Ga As/In P double heterojunction bipolar transistor(DHBT). An inverted microstrip line is implemented to avoid a parasitic mode between the ground plane and the In P substrate. The on-wafer measurement results show that peak gains are 20 dB at 140 GHz and more than 15-dB gain at 140–190 GHz respectively. The saturation output powers are-2.688 dBm at 210 GHz and-2.88 dBm at 220 GHz,respectively. It is the first report on an amplifier operating at the G-band based on 0.5-μm InP DHBT technology. Compared with the hybrid integrated circuit of vacuum electronic devices, the monolithic integrated circuit has the advantage of reliability and consistency. This TMIC demonstrates the feasibility of the 0.5-μm InGaAs/InP DHBT amplifier in G-band frequencies applications.展开更多
文摘In recent years,several failures of double circuit transmission line on the same tower due to lightning were happened in Beijing power grid.Although it can be reclosed successful,the lightning strike caused a grave threat to the power grid security.The cause of the accident and the accident process were studied for the sake of further understanding of the impact of lightning on power grid.As an example,110 kV double circuit transmission line(Xilong-line) was analyzed.At first,the system topology was given.Through the analysis on relay protection actions and the fault recorder data,over voltage on the insulator strings was calculated.Based on the analysis and the calculation,accident cause and the process were presented respectively.Secondly,it comes to the conclusion that the lightning failure was caused by counterattack.The wave of the lightning over voltage would spread to the not grounded neutral point of the transformers,and make the neutral protective gap breakdown,then cause freewheeling with the frequency of 50 Hz.As results of the relay protection,the double circuit transmission line all tripped out.Finally,the causes of the accident were proposed that included terrain features,large corner towers,strong thunderstorm weather and poor grounded contact of the tower.
文摘With rapid growth of power demand, transmission capacity is also in urgent need of upgrading. In some cases, converting existing AC transmission lines to DC lines can Improve the transmission capacity and reduce the construction investment. In this paper, the upstream finite element method was expanded to calculate the total electric field of same tower multi-circuit DC lines converted from double-circuit AC lines, and the validity of the algorithm was confirmed by experiments. Taking a DC line converted from a typical same tower 500 kV double-circuit AC transmission line as an example, the surface electric field and the ground total electric field in different pole conductor arrangement schemes were calculated and analyzed, and the critical height of pole conductors for DC lines in residential and non-residential area were determined. Then, the corridor width of DC and AC lines at critical height in residential and non-residential areas before and after AC-DC line transformation were compared. The results indicate that for DC lines converted from common 500 kV double-circuit AC lines, the ground total electric field can meet the requirements of corresponding standard with appropriate pole conductor arrangement schemes.
文摘Anewfault location algorithmfor double-circuit transmissionlines is described inthis paper.Theproposed method uses data extractedfromtwo ends of the transmissionlines andthus eliminates the effects ofthe source impedance andthe fault resistance.The distributed parameter model and the modal transformationare also employed.Depending on modal transformation,the coupled equations of the lines are converted intodecoupled ones.Inthis way,the mutual coupling effects between adjacent circuits of the lines are eliminatedandtherefore an accurate fault location can be achieved.The proposed methodis tested via digital simulationusing EMTP in conjunction with MATLAB.The test results corroborate the high accuracy of the proposedmethod.
文摘An accurate fault location algorithm for double-circuit series compensated lines is presented.Use of two-end unsynchronized measurements of current and voltage signals is considered.The algorithm applies two subroutines,designated for locating faults on particular line sections,and additionally the procedure for selecting the valid subroutine.The subroutines are formulated with use of the generalized fault loop model and the distributed parameter line model is applied.Performed ATP-EMTP based evaluation has shown the validity of the derived fault location algorithm and its high accuracy.
文摘In order to improve the reliability of fault identification of the double-circuit transmission lines on the same tower, a new algorithm for fast protection of double-circuit transmission lines on the same tower based on the reactive powers of traveling wave is proposed. With the implementation of S-transform, the initial traveling wave reactive powers are calculated and the change characteristics of reactive power under different fault conditions are studied. The protection criterion is constructed by analyzing the ratio of the reactive powers of the same end on double-circuit transmission lines and the ratio of the reactive powers at both ends on the same line. According to the ratio of reactive power on the same side of the line and both ends of the same line, it is possible to identify whether the faults of the double-circuit line of the same tower occurred in or out of the protection zone. A large number of simulation results show that the protection performance is sensitive and reliable, and quick to respond. The criterion is simple and is basically not affected by fault initial angles, fault types, and transitional resistances.
基金Project supported by the National Natural Science Foundation of China(Grant No.61501091)the Fundamental Research Funds for the Central Universities of Ministry of Education of China(Grant Nos.ZYGX2014J003 and ZYGX2013J020)
文摘Design and characterization of a G-band(140–220 GHz) terahertz monolithic integrated circuit(TMIC) amplifier in eight-stage common-emitter topology are performed based on the 0.5-μm In Ga As/In P double heterojunction bipolar transistor(DHBT). An inverted microstrip line is implemented to avoid a parasitic mode between the ground plane and the In P substrate. The on-wafer measurement results show that peak gains are 20 dB at 140 GHz and more than 15-dB gain at 140–190 GHz respectively. The saturation output powers are-2.688 dBm at 210 GHz and-2.88 dBm at 220 GHz,respectively. It is the first report on an amplifier operating at the G-band based on 0.5-μm InP DHBT technology. Compared with the hybrid integrated circuit of vacuum electronic devices, the monolithic integrated circuit has the advantage of reliability and consistency. This TMIC demonstrates the feasibility of the 0.5-μm InGaAs/InP DHBT amplifier in G-band frequencies applications.