The era of information technology has dawned on the construction industry,and Building Information Modeling(BIM)is one of the necessary engineering skills for those engaged in civil engineering professions at present ...The era of information technology has dawned on the construction industry,and Building Information Modeling(BIM)is one of the necessary engineering skills for those engaged in civil engineering professions at present and those who will engage in these professions in the future.Therefore,top universities have begun exploring ways to increase BIM-related teaching content in the curriculum system.In this paper,we discuss the integration of BIM in an in-depth manner with regard to the four course modules offered by cost engineering majors(professional foundation course,professional core course,industry-oriented course,and professional practical course)and analyze the construction of BIM curriculum ideology and politics system,the setting of teaching objectives,and the key points of curriculum ideology and politics.展开更多
Public construction project data were analyzed to develop models for the actual construction duration and actual cost. Based on 50 civil engineering projects in Libya from the database of the Great Man-Made River Syst...Public construction project data were analyzed to develop models for the actual construction duration and actual cost. Based on 50 civil engineering projects in Libya from the database of the Great Man-Made River System 1992-2009, the models identified extension as a main factor that affecting both the actual duration and cost of a project, while considering the contract cost and contract duration as fixed for the project. The suitability of each model was confirmed by examining RMSE (root mean squared error), NSE (Nash-Sutcliffe efficiency), and MEF (modeling efficiency factor). The models were validated with data from 17 different projects. The validation of both models demonstrated that models are very practical and accurate. The models are very effective in capturing the uniqueness of Libyan construction industry practice.展开更多
With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovo...With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovoltaic projects make cost management and cost control the key to project success.The purpose of this paper is to discuss the cost management and cost control strategies of photovoltaic projects,analyze their importance and challenges in the process of project implementation,and discuss the common cost control methods and techniques in photovoltaic projects,to improve cost management and cost control in photovoltaic projects,and to provide a reference for the sustainable development of the industry.展开更多
In the process of China’s national economic development,the construction industry is a very important component and has a direct impact on the level of China’s economic construction.Nowadays,the development speed of...In the process of China’s national economic development,the construction industry is a very important component and has a direct impact on the level of China’s economic construction.Nowadays,the development speed of the prefabricated construction industry is constantly accelerating.To effectively ensure the economic benefits of engineering projects,it is necessary to comprehensively strengthen cost budgeting and cost control.This article analyzes the cost budget of prefabricated construction projects,introduces the application advantages of prefabricated construction,and proposes specific cost budgeting and cost control measures,hoping to provide some reference for relevant researchers.展开更多
With the continuous development of society and economy in China, the number of water conserv ancy & hydropower engineering in China increases unceasingly and China s water conserv ancy industry also enters into th...With the continuous development of society and economy in China, the number of water conserv ancy & hydropower engineering in China increases unceasingly and China s water conserv ancy industry also enters into the stage of rapid development. The construction of water conserv ancy & hydropower engineering promotes social and economic development, so in order to safeguard the benefits of the engineering, cost management shall be done well, which is also an important channel for companies engaging in water conservancy & hydropower engineering to obtain economic benefits. Based on this the paper firstly investigates the problems in water conserv ancy & hydropower engineering cost management and then brings up relevant solutions.展开更多
The rapid economic development has promoted the construction of infrastructure,such as highways and water conservancy projects.The establishment of highways has facilitated people's lives and made the distance bet...The rapid economic development has promoted the construction of infrastructure,such as highways and water conservancy projects.The establishment of highways has facilitated people's lives and made the distance between regions shorter and shorter.However,the construction of highway engineering is a big project,which not only has a long cycle,but also has a high economic cost.During the construction process,a large number of construction materials and personnel will be applied.If the project cost management is not implemented for the highway construction,it will easily affect the final quality and profit of the entire project.This article expounds the significance of dynamic management and control of highway engineering cost,and analyzes the strategy of dynamic management and control of highway engineering cost.展开更多
Highway engineering requires higher investment and requires a long time of management compared to other construction projects.There are many factors that affect the project cost during the engineering construction sta...Highway engineering requires higher investment and requires a long time of management compared to other construction projects.There are many factors that affect the project cost during the engineering construction stage of a highway.The effective development of cost management in the construction phase of highway engineering under the list pricing model can avoid unnecessary waste and help control the cost of highway engineering.However,there are still some problems in the development of cost management in the construction phase of highway engineering,which will affect the role of the list-based pricing mode in cost management.This paper explores and analyzes the advantages of the list pricing model and the problems existing in the cost management of the highway engineering construction stage under the list pricing model,and proposes effective management strategies to improve cost management of the highway engineering construction stage.展开更多
The need for Optimum Value benefit realization on Road Projects in developing countries has become topical. While the traditional Cost Control project management process only aligns actual costs with budgeted costs, V...The need for Optimum Value benefit realization on Road Projects in developing countries has become topical. While the traditional Cost Control project management process only aligns actual costs with budgeted costs, Value Engineering (VE) is a sustainable and systematic innovative methodology for establishing the best functional balance among desired features of a project. A Value Engineering (VE) study was conducted with the aim of examining the benefits associated with its use on Road Projects in Ghana. This study employed a two-stage research procedure: desk study and field research. The literature review identified the Optimum Value benefits associated with VE road project management technique as increased Confidence Level in Contract Compliance, reliable Implementation Level of Construction Delivery and enhanced Effectiveness Level of Project Sustainability. A quantitative survey research design based on a purposive sampling technique of selecting respondents was adopted. Employing closed-ended questions, 40 sets of questionnaires were issued to professionals in Road Infrastructure and Support Agencies (RISA) under the Ministry of Roads and Highways (MRH) in the Eastern Region of Ghana. At a response rate of 85%, descriptive statistical analysis (Means, Standard Deviations and Variances) and inferential statistical analysis of variance (ANOVA) test were used to process the data and determine whether there was any significant difference between VE benefit parameters and the groups of respondents. The results revealed that road professionals are familiar with the VE process but solely use Cost Control project management technique. Road professionals recognized the high Optimum Value benefits of professionally ethical Contract Compliance, efficient Construction Delivery and functionally viable Project Sustainability on VE road project management process.展开更多
Segment Routing(SR)is a new routing paradigm based on source routing and provide traffic engineering(TE)capabilities in IP network.By extending interior gateway protocol(IGP),SR can be easily applied to IP network.How...Segment Routing(SR)is a new routing paradigm based on source routing and provide traffic engineering(TE)capabilities in IP network.By extending interior gateway protocol(IGP),SR can be easily applied to IP network.However,upgrading current IP network to a full SR one can be costly and difficult.Hybrid IP/SR network will last for some time.Aiming at the low flexibility problem of static TE policies in the current SR networks,this paper proposes a Deep Reinforcement Learning(DRL)based TE scheme.The proposed scheme employs multi-path transmission and use DRL to dynamically adjust the traffic splitting ratio among different paths based on the network traffic distribution.As a result,the network congestion can be mitigated and the performance of the network is improved.Simulation results show that our proposed scheme can improve the throughput of the network by up to 9%than existing schemes.展开更多
It is an important task for airlines to make a reasonable workscope for their engines, which has effects not only on engine performance and reliability, but also on airlines operating cost. Based on the recommendation...It is an important task for airlines to make a reasonable workscope for their engines, which has effects not only on engine performance and reliability, but also on airlines operating cost. Based on the recommendations given in the engine maintenance management manual, and taking the repair levels adopted in the previous shop visits into account, a series of module repair level optimization rules were set up, and a shop visit cost optimization model was also created for engine service life cycle. The particle swarm method was used to optimize the engine workscope and overhaul cost. The method proposed in this paper will be a reference for airlines to make engine workscope and to do engine maintenance management.展开更多
In recent years, the cost of engines has become increasingly important to engine manufacturers, who are consistently faced with major problems on how to reduce cost to a minimum. Cost has become a decisive factor for ...In recent years, the cost of engines has become increasingly important to engine manufacturers, who are consistently faced with major problems on how to reduce cost to a minimum. Cost has become a decisive factor for aircraft design. To control the continual rapid increased cost, engine cost prediction is indispensable early in the design phase. But the cost data of an aircraft engine is small; we introduce the Robust Partial Least Squares Method in solving this problem, and reducing or removing the effect of outlying data points, which is different from the Classical PLS. We use the MATLAB software doing several simulations; results and analysis of a real turbofan engine data set show the effectiveness and robustness of the Robust PLS method. The Robust PLS method can effectively be used to estimate Turbofan Engine cost with reasonable accuracy.展开更多
文摘The era of information technology has dawned on the construction industry,and Building Information Modeling(BIM)is one of the necessary engineering skills for those engaged in civil engineering professions at present and those who will engage in these professions in the future.Therefore,top universities have begun exploring ways to increase BIM-related teaching content in the curriculum system.In this paper,we discuss the integration of BIM in an in-depth manner with regard to the four course modules offered by cost engineering majors(professional foundation course,professional core course,industry-oriented course,and professional practical course)and analyze the construction of BIM curriculum ideology and politics system,the setting of teaching objectives,and the key points of curriculum ideology and politics.
文摘Public construction project data were analyzed to develop models for the actual construction duration and actual cost. Based on 50 civil engineering projects in Libya from the database of the Great Man-Made River System 1992-2009, the models identified extension as a main factor that affecting both the actual duration and cost of a project, while considering the contract cost and contract duration as fixed for the project. The suitability of each model was confirmed by examining RMSE (root mean squared error), NSE (Nash-Sutcliffe efficiency), and MEF (modeling efficiency factor). The models were validated with data from 17 different projects. The validation of both models demonstrated that models are very practical and accurate. The models are very effective in capturing the uniqueness of Libyan construction industry practice.
文摘With the rapid development of the photovoltaic(PV)industry and policy support,photovoltaic engineering has attracted much attention as a clean energy project.However,the complexity and huge investment scale of photovoltaic projects make cost management and cost control the key to project success.The purpose of this paper is to discuss the cost management and cost control strategies of photovoltaic projects,analyze their importance and challenges in the process of project implementation,and discuss the common cost control methods and techniques in photovoltaic projects,to improve cost management and cost control in photovoltaic projects,and to provide a reference for the sustainable development of the industry.
文摘In the process of China’s national economic development,the construction industry is a very important component and has a direct impact on the level of China’s economic construction.Nowadays,the development speed of the prefabricated construction industry is constantly accelerating.To effectively ensure the economic benefits of engineering projects,it is necessary to comprehensively strengthen cost budgeting and cost control.This article analyzes the cost budget of prefabricated construction projects,introduces the application advantages of prefabricated construction,and proposes specific cost budgeting and cost control measures,hoping to provide some reference for relevant researchers.
文摘With the continuous development of society and economy in China, the number of water conserv ancy & hydropower engineering in China increases unceasingly and China s water conserv ancy industry also enters into the stage of rapid development. The construction of water conserv ancy & hydropower engineering promotes social and economic development, so in order to safeguard the benefits of the engineering, cost management shall be done well, which is also an important channel for companies engaging in water conservancy & hydropower engineering to obtain economic benefits. Based on this the paper firstly investigates the problems in water conserv ancy & hydropower engineering cost management and then brings up relevant solutions.
文摘The rapid economic development has promoted the construction of infrastructure,such as highways and water conservancy projects.The establishment of highways has facilitated people's lives and made the distance between regions shorter and shorter.However,the construction of highway engineering is a big project,which not only has a long cycle,but also has a high economic cost.During the construction process,a large number of construction materials and personnel will be applied.If the project cost management is not implemented for the highway construction,it will easily affect the final quality and profit of the entire project.This article expounds the significance of dynamic management and control of highway engineering cost,and analyzes the strategy of dynamic management and control of highway engineering cost.
文摘Highway engineering requires higher investment and requires a long time of management compared to other construction projects.There are many factors that affect the project cost during the engineering construction stage of a highway.The effective development of cost management in the construction phase of highway engineering under the list pricing model can avoid unnecessary waste and help control the cost of highway engineering.However,there are still some problems in the development of cost management in the construction phase of highway engineering,which will affect the role of the list-based pricing mode in cost management.This paper explores and analyzes the advantages of the list pricing model and the problems existing in the cost management of the highway engineering construction stage under the list pricing model,and proposes effective management strategies to improve cost management of the highway engineering construction stage.
文摘The need for Optimum Value benefit realization on Road Projects in developing countries has become topical. While the traditional Cost Control project management process only aligns actual costs with budgeted costs, Value Engineering (VE) is a sustainable and systematic innovative methodology for establishing the best functional balance among desired features of a project. A Value Engineering (VE) study was conducted with the aim of examining the benefits associated with its use on Road Projects in Ghana. This study employed a two-stage research procedure: desk study and field research. The literature review identified the Optimum Value benefits associated with VE road project management technique as increased Confidence Level in Contract Compliance, reliable Implementation Level of Construction Delivery and enhanced Effectiveness Level of Project Sustainability. A quantitative survey research design based on a purposive sampling technique of selecting respondents was adopted. Employing closed-ended questions, 40 sets of questionnaires were issued to professionals in Road Infrastructure and Support Agencies (RISA) under the Ministry of Roads and Highways (MRH) in the Eastern Region of Ghana. At a response rate of 85%, descriptive statistical analysis (Means, Standard Deviations and Variances) and inferential statistical analysis of variance (ANOVA) test were used to process the data and determine whether there was any significant difference between VE benefit parameters and the groups of respondents. The results revealed that road professionals are familiar with the VE process but solely use Cost Control project management technique. Road professionals recognized the high Optimum Value benefits of professionally ethical Contract Compliance, efficient Construction Delivery and functionally viable Project Sustainability on VE road project management process.
基金supported by the National Key R&D Project(No.2020YFB1804803)the Research and Development Program in Key Areas of Guangdong Province(No.2018B010113001)。
文摘Segment Routing(SR)is a new routing paradigm based on source routing and provide traffic engineering(TE)capabilities in IP network.By extending interior gateway protocol(IGP),SR can be easily applied to IP network.However,upgrading current IP network to a full SR one can be costly and difficult.Hybrid IP/SR network will last for some time.Aiming at the low flexibility problem of static TE policies in the current SR networks,this paper proposes a Deep Reinforcement Learning(DRL)based TE scheme.The proposed scheme employs multi-path transmission and use DRL to dynamically adjust the traffic splitting ratio among different paths based on the network traffic distribution.As a result,the network congestion can be mitigated and the performance of the network is improved.Simulation results show that our proposed scheme can improve the throughput of the network by up to 9%than existing schemes.
文摘It is an important task for airlines to make a reasonable workscope for their engines, which has effects not only on engine performance and reliability, but also on airlines operating cost. Based on the recommendations given in the engine maintenance management manual, and taking the repair levels adopted in the previous shop visits into account, a series of module repair level optimization rules were set up, and a shop visit cost optimization model was also created for engine service life cycle. The particle swarm method was used to optimize the engine workscope and overhaul cost. The method proposed in this paper will be a reference for airlines to make engine workscope and to do engine maintenance management.
文摘In recent years, the cost of engines has become increasingly important to engine manufacturers, who are consistently faced with major problems on how to reduce cost to a minimum. Cost has become a decisive factor for aircraft design. To control the continual rapid increased cost, engine cost prediction is indispensable early in the design phase. But the cost data of an aircraft engine is small; we introduce the Robust Partial Least Squares Method in solving this problem, and reducing or removing the effect of outlying data points, which is different from the Classical PLS. We use the MATLAB software doing several simulations; results and analysis of a real turbofan engine data set show the effectiveness and robustness of the Robust PLS method. The Robust PLS method can effectively be used to estimate Turbofan Engine cost with reasonable accuracy.