The construction method of continuous paving of the upper and lower base of the water stable macadam base can improve the construction efficiency,overcome the quality problems of the traditional layered paving of the ...The construction method of continuous paving of the upper and lower base of the water stable macadam base can improve the construction efficiency,overcome the quality problems of the traditional layered paving of the upper and lower base,such as untimely curing,slow construction,poor interlayer bonding,contraction joint and interlayer,so as to ensure the construction quality of the water stable macadam.It is also the promotion and application of new technology.展开更多
The paving segregation of asphalt mixture was closely related to the structure size and using parameters for the screw distributor of paver,and the paving uniformity of the mixture was determined by the screw blade di...The paving segregation of asphalt mixture was closely related to the structure size and using parameters for the screw distributor of paver,and the paving uniformity of the mixture was determined by the screw blade diameter,pitch,and the position of the mixture in the screw distributor.Through researching the kinematics of the mixture in the screw distributor,the mathematical model was established,and the mathematical model was related with structural parameters,used parameters and material parameters.Through the mathematical model,the various parameters on the screw distributor job performance were analyzed,and the unstable area,meta-stable area and stable area were determined.In the project,the full-scale test in actual project was conducted by using the AC25 mixture.By changing the using parameters compare the paving operations,the results show that,the reasonable parameter will greatly improve the uniformity of paving,and the surface proportion of structural depth of mixture decrease from the 2.13 to 1.60.展开更多
In the construction of asphalt mixture pavement,there are many paving construction procedures,high requirements for machinery and personnel,unreasonable technology and so on.In this paper,the millimeter-scale 3D autom...In the construction of asphalt mixture pavement,there are many paving construction procedures,high requirements for machinery and personnel,unreasonable technology and so on.In this paper,the millimeter-scale 3D automatic paving control technology of asphalt mixture pavement is studied with an engineering example.From the analysis of the test results in the later stage of construction,it can be seen that the technology has achieved the goal of high precision paving,and the successful application of the technology provides valuable reference experience for similar asphalt concrete pavement construction in the future.展开更多
文摘The construction method of continuous paving of the upper and lower base of the water stable macadam base can improve the construction efficiency,overcome the quality problems of the traditional layered paving of the upper and lower base,such as untimely curing,slow construction,poor interlayer bonding,contraction joint and interlayer,so as to ensure the construction quality of the water stable macadam.It is also the promotion and application of new technology.
基金Funded by the Special Fund for Basic Scientific Research of Central Colleges,Chang'an University and Basic Research Support Program of Chang'an University(CHD2011SY005)
文摘The paving segregation of asphalt mixture was closely related to the structure size and using parameters for the screw distributor of paver,and the paving uniformity of the mixture was determined by the screw blade diameter,pitch,and the position of the mixture in the screw distributor.Through researching the kinematics of the mixture in the screw distributor,the mathematical model was established,and the mathematical model was related with structural parameters,used parameters and material parameters.Through the mathematical model,the various parameters on the screw distributor job performance were analyzed,and the unstable area,meta-stable area and stable area were determined.In the project,the full-scale test in actual project was conducted by using the AC25 mixture.By changing the using parameters compare the paving operations,the results show that,the reasonable parameter will greatly improve the uniformity of paving,and the surface proportion of structural depth of mixture decrease from the 2.13 to 1.60.
文摘In the construction of asphalt mixture pavement,there are many paving construction procedures,high requirements for machinery and personnel,unreasonable technology and so on.In this paper,the millimeter-scale 3D automatic paving control technology of asphalt mixture pavement is studied with an engineering example.From the analysis of the test results in the later stage of construction,it can be seen that the technology has achieved the goal of high precision paving,and the successful application of the technology provides valuable reference experience for similar asphalt concrete pavement construction in the future.