期刊文献+
共找到235篇文章
< 1 2 12 >
每页显示 20 50 100
Advanced Sheet Pile Curtain Design: Case Study of Cotonou East Corniche
1
作者 Peace Sèna Hounkpe Guy Oyéniran Adéoti +1 位作者 Patrick Oniakitan Mondoté Éric Adéchina Alamou 《Open Journal of Civil Engineering》 2024年第1期38-64,共27页
This paper delves into the critical aspects of sheet pile walls in civil engineering, highlighting their versatility in soil protection, retention, and waterproofing, all while emphasizing sustainability and efficient... This paper delves into the critical aspects of sheet pile walls in civil engineering, highlighting their versatility in soil protection, retention, and waterproofing, all while emphasizing sustainability and efficient construction practices. The paper explores two fundamental approaches to sheet pile design: limit equilibrium methods and numerical techniques, with a particular focus on finite element analysis. Utilizing the robust PLAXIS 2016 calculation code based on the finite element method and employing a simplified elastoplastic model (Mohr-Coulomb), this study meticulously models the interaction between sheet pile walls and surrounding soil. The research offers valuable insights into settlement and deformation patterns that adjacent buildings may experience during various construction phases. The central objective of this paper is to present the study’s findings and recommend potential mitigation measures for settlement effects on nearby structures. By unraveling the intricate interplay between sheet pile wall construction and neighboring buildings, the paper equips engineers and practitioners to make informed decisions that ensure the safety and integrity of the built environment. In the context of the Cotonou East Corniche development, the study addresses the limitations of existing software, such as RIDO, in predicting settlements and deformations affecting nearby buildings due to the substantial load supported by sheet pile walls. This information gap necessitates a comprehensive study to assess potential impacts on adjacent structures and propose suitable mitigation measures. The research underscores the intricate dynamics between sheet pile wall construction and its influence on the local environment. It emphasizes the critical importance of proactive engineering and vigilant monitoring in managing and mitigating potential hazards to nearby buildings. To mitigate these risks, the paper recommends measures such as deep foundations, ground improvement techniques, and retrofitting. The findings presented in this study contribute significantly to the field of civil engineering and offer invaluable insights into the multifaceted dynamics of construction-induced settlement. The study underscores the importance of continuous evaluation and coordination between construction teams and building owners to effectively manage the impacts of sheet pile wall construction on adjacent structures. 展开更多
关键词 sheet pile Walls and structural Analysis Soil-structure Interaction Modeling structural Sustainability Cotonou East Corniche Sustainable Construction Plaxis Calculation Code Settlement Mitigation
下载PDF
Innovative Techniques Unveiled in Advanced Sheet Pile Curtain Design
2
作者 Peace Sèna Hounkpe Guy Oyéniran Adéoti +1 位作者 Patrick Oniakitan Mondoté Éric Adéchina Alamou 《Open Journal of Civil Engineering》 2024年第1期1-37,共37页
This thorough review explores the complexities of geotechnical engineering, emphasizing soil-structure interaction (SSI). The investigation centers on sheet pile design, examining two primary methodologies: Limit Equi... This thorough review explores the complexities of geotechnical engineering, emphasizing soil-structure interaction (SSI). The investigation centers on sheet pile design, examining two primary methodologies: Limit Equilibrium Methods (LEM) and Soil-Structure Interaction Methods (SSIM). While LEM methods, grounded in classical principles, provide valuable insights for preliminary design considerations, they may encounter limitations in addressing real-world complexities. In contrast, SSIM methods, including the SSI-SR approach, introduce precision and depth to the field. By employing numerical techniques such as Finite Element (FE) and Finite Difference (FD) analyses, these methods enable engineers to navigate the dynamics of soil-structure interaction. The exploration extends to SSI-FE, highlighting its essential role in civil engineering. By integrating Finite Element analysis with considerations for soil-structure interaction, the SSI-FE method offers a holistic understanding of how structures dynamically interact with their geotechnical environment. Throughout this exploration, the study dissects critical components governing SSIM methods, providing engineers with tools to navigate the intricate landscape of geotechnical design. The study acknowledges the significance of the Mohr-Coulomb constitutive model while recognizing its limitations, and guiding practitioners toward informed decision-making in geotechnical analyses. As the article concludes, it underscores the importance of continuous learning and innovation for the future of geotechnical engineering. With advancing technology and an evolving understanding of soil-structure interaction, the study remains committed to ensuring the safety, stability, and efficiency of geotechnical structures through cutting-edge design and analysis techniques. 展开更多
关键词 sheet pile Curtain Design Soil-structure Interaction Geotechnical Engineering Advanced Design Techniques Finite Element Analysis Innovative Geotechnical Methods
下载PDF
New Development of Port Structures Design and Construction 被引量:1
3
作者 S. Gabi M. Doubrovsky A. Belakrouf 《Journal of Shipping and Ocean Engineering》 2011年第3期150-157,共8页
关键词 结构设计 港口 施工 简化技术 维护成本 建设成本 海岸保护 土壤条件
下载PDF
New Types of Wharf Structures in Chiwan Port
4
作者 Liang Fengwu Senior Engineer, Shenzhen Nanshan Engineering Build Co., Shenzhen 518068 《China Ocean Engineering》 SCIE EI 1994年第4期437-446,共10页
A bold innovation was carried out for the structural type of wharves in line with local conditions in Chiwan Port, in which a group of wharves with novel structures have been built in this port during the past ten years.
关键词 wharf structure PORT gravity structure pile structure sheet structure
下载PDF
Monitoring of the Corrosion on a Steel Sheet-pile Marine Breakwater by Systematic Thickness Measurements
5
作者 Millan Solorzano Luis Osmel Luis Osmel 《Journal of Civil Engineering and Architecture》 2022年第10期519-530,共12页
In Quepos,Pacific of Costa Rica,it was finished on 2010 the first phase of a marina,including two mix breakwaters,with rubble mound(rocks and concrete units),and 25 circular steel sheet piles cofferdam cells,filled wi... In Quepos,Pacific of Costa Rica,it was finished on 2010 the first phase of a marina,including two mix breakwaters,with rubble mound(rocks and concrete units),and 25 circular steel sheet piles cofferdam cells,filled with sand and gravel.The maintenance plan,considers tracking sheet pile corrosion,comparing'actual'against expected rates,checking structural limits,and programming countermeasures if accelerated corrosion is identified.Specific control sections,along the breakwaters,both inside and outside the basin,were established.In each section,thicknesses were measured every meter from the top of the steel cell to seabed using an ultrasonic equipment,and an underwater transducer.Both land crew,and divers for submerged portions,were used.The measurements campaigns are for several years from 2011 to 2016.Sectors of the breakwater with varied corrosion attack levels could be differentiated.Also,corrosion rates and lifespans were estimated,both general for the structures,and specific for each section and level.In turn,this allowed to identify maintenance priorities,defining sites where measures of corrosion protection should initiate,as well,to have confidence in the structural capacity and safety of the breakwaters. 展开更多
关键词 Monitoring of structures maritime works sheet piling CORROSION ultrasonic thickness measurements
下载PDF
Monitoring of the Corrosion on a Steel Sheet-Pile Marine Breakwater by Systematic Thickness Measurements
6
作者 Luis Osmel Millan Solorzano 《Journal of Civil Engineering and Architecture》 2018年第1期39-50,共12页
关键词 腐蚀率 堆积 厚度 海洋 系统 哥斯达黎加 下变换器
下载PDF
高速公路边坡预应力锚索桩板墙结构参数优化与受力特征分析
7
作者 刘兴雷 吴顺川 +1 位作者 韩龙强 曹振生 《科学技术与工程》 北大核心 2024年第15期6439-6447,共9页
桩板墙是高速公路滑坡治理中常用的一种支护措施,其结构参数的优化设计是工程施工的研究重点。以云南省红河州建水(个旧)至元阳高速公路工程AK0+560~AK0+660段桩板墙工程为背景,采用数值模拟与灰色关联分析、正交试验设计相结合的方法,... 桩板墙是高速公路滑坡治理中常用的一种支护措施,其结构参数的优化设计是工程施工的研究重点。以云南省红河州建水(个旧)至元阳高速公路工程AK0+560~AK0+660段桩板墙工程为背景,采用数值模拟与灰色关联分析、正交试验设计相结合的方法,研究桩体嵌固长度、桩间距、桩宽3种结构参数的影响与优化,最终验证优化后的结构参数在地震工况下的稳定性。结果表明:桩间距为主要影响因素,桩体嵌固长度和桩宽的关联度相近,为次要影响因素;桩板墙结构参数最优组合为桩体嵌固长度15.0 m、桩间距5.0 m、桩宽3.0 m;地震工况下,抗滑桩悬臂段土压力以及桩身偏移量和沉降差满足规范要求,边坡稳定性较好。 展开更多
关键词 高速公路 预应力锚索桩板墙 结构参数优化 地震响应 数值模拟
下载PDF
基于国外某矿厂码头的结构方案研究
8
作者 池海 王键 +1 位作者 王俊杰 张定野 《港口航道与近海工程》 2024年第2期31-34,共4页
在某矿厂码头工程设计中,利用矿厂采矿废石料回填造陆价格低廉的优势,提出了高桩梁板式结构、钢管板桩组合结构、钢管排桩结构方案并开展分析研究。在高桩梁板式方案中,为减少前方承台与后方陆域距离,采用了一种可以适应较大水深卸荷承... 在某矿厂码头工程设计中,利用矿厂采矿废石料回填造陆价格低廉的优势,提出了高桩梁板式结构、钢管板桩组合结构、钢管排桩结构方案并开展分析研究。在高桩梁板式方案中,为减少前方承台与后方陆域距离,采用了一种可以适应较大水深卸荷承台式接岸结构。钢管板桩组合结构和钢管排桩结构虽然均为板桩结构,但相对于钢板桩,钢管桩单桩水上可打性更好,因此分别对其采用了填筑施工围堰的陆上打桩施工方式和打桩船打桩的水上打桩施工方式。最终通过综合技术经济比选,选定了适用于本工程的最优结构方案,为提高钢排桩板桩结构的应用前景提供经验。 展开更多
关键词 矿厂码头 高桩梁板式结构 卸荷承台式接岸结构 钢管板桩组合结构 钢管排桩结构
下载PDF
锚索桩板墙在边坡加固上的应用研究
9
作者 贾存恩 《中国建材科技》 CAS 2024年第1期108-111,共4页
对既有支护结构的加固是有效延长结构使用寿命的一种方式。本文以某边坡加固为例,采取在原结构前设置锚索桩板墙并与墙后填土及原结构共同作用的加固方式,提出综合性边坡支护加固设计流程,包括土体沉降与滑移成因评估、加固方案设计、... 对既有支护结构的加固是有效延长结构使用寿命的一种方式。本文以某边坡加固为例,采取在原结构前设置锚索桩板墙并与墙后填土及原结构共同作用的加固方式,提出综合性边坡支护加固设计流程,包括土体沉降与滑移成因评估、加固方案设计、施工顺序设计与信息化监测等。结合工程实际,在设计阶段充分考虑边坡的地质条件、荷载特点及周围环境。现场检测验证了该加固方法的有效性。 展开更多
关键词 锚索桩板墙 边坡加固 复合支挡体系 既有结构
下载PDF
填土钢板桩围堰结构计算及关键施工技术
10
作者 周芷娴 卢新宇 韦苡松 《山西建筑》 2024年第1期117-120,共4页
结合龙门大桥东引桥下构施工现场情况,提出了适用于半海半岛区域的填土钢板桩围堰施工工艺。采用有限元计算软件Midas Civil对填土钢板桩围堰在不同工况下的受力进行验算,验证填土钢板桩围堰结构的承载力。优化填土钢板桩围堰工艺的工... 结合龙门大桥东引桥下构施工现场情况,提出了适用于半海半岛区域的填土钢板桩围堰施工工艺。采用有限元计算软件Midas Civil对填土钢板桩围堰在不同工况下的受力进行验算,验证填土钢板桩围堰结构的承载力。优化填土钢板桩围堰工艺的工艺流程,得出相应关键施工技术。 展开更多
关键词 填土钢板桩围堰 结构计算 施工技术
下载PDF
斜顶板桩承台接岸结构优化设计
11
作者 杨旭东 马哲超 《水运工程》 2024年第6期211-217,共7页
针对斜顶板桩承台接岸结构造价较高的问题,结合洋山港区实际应用情况进行优化设计研究。采用与已建结构相同的计算方法进行使用条件和结构受力特点的对比分析,得出类似结构在软土地基的大型集装箱码头中应用可以显著优化结构。采取分级... 针对斜顶板桩承台接岸结构造价较高的问题,结合洋山港区实际应用情况进行优化设计研究。采用与已建结构相同的计算方法进行使用条件和结构受力特点的对比分析,得出类似结构在软土地基的大型集装箱码头中应用可以显著优化结构。采取分级实施墙后棱体、取消后排支撑桩、利用组合钢板桩优化密排钢管板桩、将承台简化为导梁等优化措施,形成一种新的半直立式接岸结构形式,即斜顶板桩结构。结果表明:斜顶板桩与下级棱体组成的独立稳定结构体系较好地适应了前期软土地基高填土的变形特点和后期上部结构的使用要求。新结构更合理地利用桩基结构承载能力,明显提高了经济性,有利于在软基地区的类似工程中推广。 展开更多
关键词 斜顶板桩 接岸结构 软土地基 高填土 混合堤
下载PDF
深厚泥炭质土软基条件下的老码头改扩建
12
作者 吕威 贝建忠 孙国辉 《水运工程》 2024年第2期66-71,130,共7页
泥炭质土因其有机质含量高、含水量高、压缩性高、强度低、固结慢等特点,加固处理难度较大,严重危害工程安全。依托某境外老板桩码头改造项目,针对其存在深厚泥炭质土软基、堆场面积狭小、老码头结构破损严重、改造空间受限、边改造边... 泥炭质土因其有机质含量高、含水量高、压缩性高、强度低、固结慢等特点,加固处理难度较大,严重危害工程安全。依托某境外老板桩码头改造项目,针对其存在深厚泥炭质土软基、堆场面积狭小、老码头结构破损严重、改造空间受限、边改造边运营等突出特点,拟定多种改扩建平面和结构方案。从码头运营、结构可靠性、经济性和施工难度等方面分析各方案优缺点,最终提出适应深厚泥炭质土软基条件下老码头改扩建工程的推荐方案,并分析了施工过程中关键技术难点及注意事项,可为类似工程提供借鉴。 展开更多
关键词 老码头改造 深厚泥炭质土 水泥搅拌桩 高压旋喷桩 后板桩高桩码头结构
下载PDF
高烈度地震区椅式抗滑支挡结构抗震性能研究
13
作者 胡会星 李宁 任华锋 《特种结构》 2023年第5期112-117,共6页
针对位于9度高烈度地震区的某山区铁路陡坡工点,采用三维有限元分析软件,对椅式复合抗滑支挡结构的结构位移及内力动力响应进行分析,数值计算结果表明,复合抗滑支挡结构峰值位移较小,最大值为161.44mm,结构抗震性能好;左侧椅式桩板墙主... 针对位于9度高烈度地震区的某山区铁路陡坡工点,采用三维有限元分析软件,对椅式复合抗滑支挡结构的结构位移及内力动力响应进行分析,数值计算结果表明,复合抗滑支挡结构峰值位移较小,最大值为161.44mm,结构抗震性能好;左侧椅式桩板墙主桩、副桩桩身弯矩均呈Ω型,剪力呈S型,横梁弯矩和剪力均呈正弦分布,结构弯矩峰值位于副桩桩身中部附近,剪力峰值位于副桩与横梁连接处,需加强副桩中部抗弯能力设计,同时提高副桩与横梁节点处的抗剪能力;右侧锚索桩桩身弯矩呈Ω型分布,剪力呈S型,弯矩峰值位于锚索桩身中部,正负剪力峰值基本相当,锚索桩弯矩峰值偏大,因此需在桩身增设1~2排锚索以减少桩身弯矩。 展开更多
关键词 复合抗滑支挡结构 陡坡地段 椅式桩板墙 三维数值模拟 位移响应 内力响应
下载PDF
新旧组合支挡结构的优化设计研究
14
作者 李伟 《铁道勘测与设计》 2023年第1期39-43,共5页
随着我国铁路建设的蓬勃发展,铁路既有线改建及邻近既有线新建项目日益增多,由于运输量以及运输路线的增加和城市建设对既有线路况的限制,既有支挡结构物不能满足帮宽路基收坡的要求,且无法承担新帮宽路基荷载时,需针对帮宽路基设置新... 随着我国铁路建设的蓬勃发展,铁路既有线改建及邻近既有线新建项目日益增多,由于运输量以及运输路线的增加和城市建设对既有线路况的限制,既有支挡结构物不能满足帮宽路基收坡的要求,且无法承担新帮宽路基荷载时,需针对帮宽路基设置新的支挡结构,此时帮宽路基产生的土压力由新建支挡结构和既有支挡结构共同承担[1]。本文以中卫至兰州铁路线引入兰州枢纽的某段既有悬臂式挡土墙边坡上新建桩板墙工程为依托,通过现数值模拟的方法,对组合支挡结构进行了优化设计研究。^([1]) 展开更多
关键词 桩板墙 组合支挡结构 数值模拟 优化设计
下载PDF
软土地区沟槽浅基坑机械化施工简易支护研究 被引量:1
15
作者 邵冰然 张海威 +5 位作者 唐继朋 秦涛 白苏娜 雷铮 左焦 于江浩 《建筑结构》 北大核心 2023年第S02期2636-2640,共5页
电力电缆工程浅基坑机械化施工时,无专项支护设计方案,多存在简易支护措施不当或过度使用钢板桩支护的乱象发生。参照相关规程规范并结合实际工程经验,对浅基坑的边界条件进行研究梳理,确定浅基坑支挡结构安全等级、超载取值等参数。通... 电力电缆工程浅基坑机械化施工时,无专项支护设计方案,多存在简易支护措施不当或过度使用钢板桩支护的乱象发生。参照相关规程规范并结合实际工程经验,对浅基坑的边界条件进行研究梳理,确定浅基坑支挡结构安全等级、超载取值等参数。通过位于天津典型软土地区的工程实例,以控制变量法分别对超限值、地基加固以及钢板桩内撑的影响效果进行研究,确定拉森钢板桩支护结构的形式选择,对沟槽浅基坑支护优化设计给予一定的技术引导与参考。 展开更多
关键词 机械化施工 典型软土地区 边界条件 拉森钢板桩支挡结构
下载PDF
高桩+板桩复合式结构的内力分析方法
16
作者 邱文 卢生军 骆俊彬 《水运工程》 北大核心 2023年第4期64-71,共8页
对高桩+板桩复合式结构进行内力分析,通过采用SAP2000和PLAXIS有限元分析软件建立不同的计算模型,得出每种模型下高桩和板桩结构的弯矩、轴力、剪力和位移等计算结果,并对结果及其产生差异的原因进行分析。结果表明:仅采用SAP2000的分... 对高桩+板桩复合式结构进行内力分析,通过采用SAP2000和PLAXIS有限元分析软件建立不同的计算模型,得出每种模型下高桩和板桩结构的弯矩、轴力、剪力和位移等计算结果,并对结果及其产生差异的原因进行分析。结果表明:仅采用SAP2000的分析模型因高估了土体对板桩结构的支撑作用,其内力计算结果偏小;仅采用PLAXIS2D的分析模型因忽略了高桩结构的变形,其内力计算结果偏大;而采用这两种软件迭代计算的分析模型与PLAXIS 3D模型的计算结果接近,说明该计算模型的结果与实际情况较为吻合。 展开更多
关键词 高桩+板桩 复合式结构 内力 SAP2000 PLAXIS
下载PDF
拉森钢板桩施工技术在建筑工程深基坑支护中的应用 被引量:3
17
作者 周泽军 《江西建材》 2023年第8期277-279,282,共4页
为保证建筑工程深基坑施工安全,文中以某住宅楼项目为案例,结合项目地勘资料、周边环境以及基坑挖深等实际情况,经专家论证,提出“拉森(U型热轧)钢板桩+钢管内支撑”的组合支护方案。通过支护方案设计、支护结构施工和全过程施工监测分... 为保证建筑工程深基坑施工安全,文中以某住宅楼项目为案例,结合项目地勘资料、周边环境以及基坑挖深等实际情况,经专家论证,提出“拉森(U型热轧)钢板桩+钢管内支撑”的组合支护方案。通过支护方案设计、支护结构施工和全过程施工监测分析,以期规范施工流程,强化施工质量,保障施工安全。 展开更多
关键词 建筑深基坑 拉森钢板桩 支护结构 施工监测
下载PDF
基于变形控制的某双排钢板桩围堰结构设计优化 被引量:1
18
作者 周清泉 李振羽 江义 《水电能源科学》 北大核心 2023年第11期121-124,226,共5页
为保证双排钢板桩围堰的结构安全并控制其用水面积,采用单因素敏感性分析方法研究了多项设计参数对围堰变形的影响,并通过PLAXIS软件进行二维、三维有限元模型计算。结果表明,拉杆标高、拉杆张紧力、钢板桩抗弯刚度对围堰入土段变形的... 为保证双排钢板桩围堰的结构安全并控制其用水面积,采用单因素敏感性分析方法研究了多项设计参数对围堰变形的影响,并通过PLAXIS软件进行二维、三维有限元模型计算。结果表明,拉杆标高、拉杆张紧力、钢板桩抗弯刚度对围堰入土段变形的影响较小;与堰体自身宽度相比,围堰变形受到内侧压脚宽度的影响更大,应尽量增加内侧压脚宽度;外侧板桩入土深度对围堰变形无明显影响,可适当减小外侧板桩入土深度、增加内侧板桩入土深度;横隔结构对控制堰体变形的效果不明显,可采取其他措施以加强内外板桩连接。研究思路和计算结果可为类似工程钢围堰结构设计优化提供参考。 展开更多
关键词 双排钢板桩围堰 板桩入土深度 堰体宽度 内侧压脚宽度 横隔结构
下载PDF
海工码头接岸结构选型与设计 被引量:2
19
作者 梁丰收 王俐 《水道港口》 2023年第2期238-244,共7页
结合海工码头使用荷载大、出运工艺复杂的特点,对软弱地基上某海工码头接岸结构的选型及设计进行论述分析,从地质条件、施工条件和使用要求等方面论证选用整体卸荷式板桩结构,前墙板桩选用灌注桩排桩形式,承台下灌注桩采用长短桩间隔布... 结合海工码头使用荷载大、出运工艺复杂的特点,对软弱地基上某海工码头接岸结构的选型及设计进行论述分析,从地质条件、施工条件和使用要求等方面论证选用整体卸荷式板桩结构,前墙板桩选用灌注桩排桩形式,承台下灌注桩采用长短桩间隔布置,使得结构受力更为合理,解决了软弱地基上接岸结构同时承受较大竖向和水平使用荷载的问题,采用塑性混凝土桩进行排桩地连墙的堵缝处理,效果明显;同时对土压力计算与分配、m法模拟桩土相互作用等相关计算进行探讨,供类似工程参考。 展开更多
关键词 软弱地基 接岸结构 整体卸荷式板桩结构 地连墙
下载PDF
高桩梁板与板桩复合结构对板桩码头原位升级改造思路 被引量:1
20
作者 何元瑭 《水运工程》 北大核心 2023年第6期74-80,共7页
以东莞虎门港某1000吨级码头原位升级改造为5万吨级码头的工程实例,通过对工程现状及存在问题的分析,提出采用高桩梁板与板桩的复合结构,将板桩墙和高桩梁板结构连成一体,形成整体卸荷式结构,有效减少作用于板桩墙的土压力,使板桩结构... 以东莞虎门港某1000吨级码头原位升级改造为5万吨级码头的工程实例,通过对工程现状及存在问题的分析,提出采用高桩梁板与板桩的复合结构,将板桩墙和高桩梁板结构连成一体,形成整体卸荷式结构,有效减少作用于板桩墙的土压力,使板桩结构能满足大吨位深水码头的建造要求。论述了改造方案选型并进行结构分析计算,根据弹性理论建立有限元三维数值模型,计算结果满足工程要求。该复合结构基于特定条件下提出,结构特点鲜明,可作为类似码头升级改造工程借鉴。 展开更多
关键词 板桩码头升级 复合结构 整体卸荷式 三维数值模型
下载PDF
上一页 1 2 12 下一页 到第
使用帮助 返回顶部