The Hong Kong-Zhuhai-Macao Bridge(HZMB)project,which has just been opened to traffic in 2018.The special location,construction conditions,quality requirements and multiple functions of HZMB brought many challenges,suc...The Hong Kong-Zhuhai-Macao Bridge(HZMB)project,which has just been opened to traffic in 2018.The special location,construction conditions,quality requirements and multiple functions of HZMB brought many challenges,such as management,technology,safety and environmental protection.To meet these challenges and ensure the achievement of high quality and 120 years design service life,the HZMB project first introduced the completely new concept of"Large size,Factory production,Standardization and Assembly",which was fundamental to the design and construction.This was developed in consideration of the difficulties of the offshore environment.The core idea was Prefabrication and Assembly,which was to change this HZMB project into onshore work as much as possible by cutting this mega sea-crossing into large sized components,which could be prefabricated on land and then transported to the offshore site for assembly.The success of the HZMB undoubtedly has led the technology of prefabrication and assembly to a new height and recognized scale.This paper describes the implementation process of the concept;"Large size,Factory production,Standardization and Assembly"(LFSA)to the HZMB.展开更多
Old-age building was designed in Ziwu Town,from the aspects of energy saving,environmental protection,full use of solar energy and characteristics of the local climate.In order to meet the requirements of energy conse...Old-age building was designed in Ziwu Town,from the aspects of energy saving,environmental protection,full use of solar energy and characteristics of the local climate.In order to meet the requirements of energy conservation,environmental protection and climate adaptability of residential buildings,this paper integrates the construction and design in the prefabricated building design,at the same time,with the consideration of the possibility of expansion and removal of the nursing home,the concept of "modular unit" is put forward.Considering the climatic adaptability of the base position,the utilization of solar energy and the organization of natural ventilation should be paid attention to,also,the rammed soil construction method is added in this design,which can improve the thermal insulation performance of the building enclosure and create a comfortable indoor thermal environment both in winter and summer.In order to realize the object of industrial building construction and design,the prefabricated construction method is used,which produces impact on the surrounding environment more environmentally friendly.The building will be easily built,less restricted,and low-cost.What's more,local material and the advantages of all dry work increase the operability of the project.展开更多
文摘The Hong Kong-Zhuhai-Macao Bridge(HZMB)project,which has just been opened to traffic in 2018.The special location,construction conditions,quality requirements and multiple functions of HZMB brought many challenges,such as management,technology,safety and environmental protection.To meet these challenges and ensure the achievement of high quality and 120 years design service life,the HZMB project first introduced the completely new concept of"Large size,Factory production,Standardization and Assembly",which was fundamental to the design and construction.This was developed in consideration of the difficulties of the offshore environment.The core idea was Prefabrication and Assembly,which was to change this HZMB project into onshore work as much as possible by cutting this mega sea-crossing into large sized components,which could be prefabricated on land and then transported to the offshore site for assembly.The success of the HZMB undoubtedly has led the technology of prefabrication and assembly to a new height and recognized scale.This paper describes the implementation process of the concept;"Large size,Factory production,Standardization and Assembly"(LFSA)to the HZMB.
文摘Old-age building was designed in Ziwu Town,from the aspects of energy saving,environmental protection,full use of solar energy and characteristics of the local climate.In order to meet the requirements of energy conservation,environmental protection and climate adaptability of residential buildings,this paper integrates the construction and design in the prefabricated building design,at the same time,with the consideration of the possibility of expansion and removal of the nursing home,the concept of "modular unit" is put forward.Considering the climatic adaptability of the base position,the utilization of solar energy and the organization of natural ventilation should be paid attention to,also,the rammed soil construction method is added in this design,which can improve the thermal insulation performance of the building enclosure and create a comfortable indoor thermal environment both in winter and summer.In order to realize the object of industrial building construction and design,the prefabricated construction method is used,which produces impact on the surrounding environment more environmentally friendly.The building will be easily built,less restricted,and low-cost.What's more,local material and the advantages of all dry work increase the operability of the project.