期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Research on controlling long-term performance by tensioning post tendon of long-span continuous rigid-frame bridges 被引量:1
1
作者 HE Mingxuan ZHENG Yifeng ZHAO Qun 《Global Geology》 2013年第4期213-216,共4页
The problems like cracking of the girder in the mid-span and the ever-increasing vertical deflection appear during the long term usage of the long-span continuous rigid-flame bridge. Post-tension tendon with re- serve... The problems like cracking of the girder in the mid-span and the ever-increasing vertical deflection appear during the long term usage of the long-span continuous rigid-flame bridge. Post-tension tendon with re- served duct can increase the pre-stress of the main beam effectively, and decrease the long term span deflection in order to improve the performance of the girder. At the same time, the proper tension position is very crucial to optimise the stress distribution of the bridge and control the deflection increase. Combining with practical en- gineering, the authors analyze the influence of different positions of post-tension tendon ( including top-, web- and bottom plate tendons) on the stress and deflection of the main beam, and find out the optimal position of post tendon. 展开更多
关键词 continuous rigid-frame bridge long term performance post tendon optimal tension position
下载PDF
Effect of concrete creep on pre-camber of continuous rigid-frame bridge
2
作者 贺国京 李媛媛 +1 位作者 邹中权 段靓靓 《Journal of Central South University》 SCIE EI CAS 2008年第S1期337-341,共5页
The effect of concrete creep on the pre-camber of a long-span pre-stressed concrete continuous rigid-frame bridge constructed by cantilever casting method was investigated.The difference of creep coefficients calculat... The effect of concrete creep on the pre-camber of a long-span pre-stressed concrete continuous rigid-frame bridge constructed by cantilever casting method was investigated.The difference of creep coefficients calculated with two Chinese codes was discussed.Based on the calculations,the pre-camber of a pre-stressed concrete continuous rigid-frame box bridge was computed for construction control purpose.The results show that the short-term creep coefficient and long-term creep coefficient calculated with the CC-1985 are larger than those calculated with the CC-2004,while the medium-term creep coefficient calculated with the CC-1985 is smaller than that calculated with the CC-2004.The difference of creep deformation calculated with these two codes is small,and the influences of concrete creep on the pre-camber for most of the segments are negligible.The deflections and stresses of the box girder measured during the construction stages agree very well with the predictions. 展开更多
关键词 CREEP pre-stressed concrete continuous rigid-frame bridge CANTILEVER CASTING method PRE-CAMBER
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部