This paper presents a calculation method that evaluates the extent of disturbance based on structural safety limits.Additionally,it summarizes the assessment methods for construction disturbance zones in shield tunnel...This paper presents a calculation method that evaluates the extent of disturbance based on structural safety limits.Additionally,it summarizes the assessment methods for construction disturbance zones in shield tunneling near pile foundations,urban ground structures,and underground structures.Furthermore,taking the construction of the Chengdu Jinxiu Tunnel under bridges and urban pipelines as the engineering background,a study on the disturbance zoning of adjacent structures was conducted.The most intense disturbance occurs within one week of the tunnel underpass process,and it has a significant impact within a range of two times the tunnel diameter along the tunnel axis.The bridge pile and bridge deck experience less disturbance from tunnel approaching construction,with a maximum disturbance zone characterized as medium disturbance.On the other hand,underground pipelines are subjected to more significant disturbances from tunnel construction,with a maximum disturbance zone classified as strong disturbance.The implementation of“bridge pile sleeve valve pipe grouting&underground pipeline ground grouting&tunnel advance grouting”in the field effectively limits the vertical settlement of bridges and pipelines,resulting in a decrease of approximately 0.1 in disturbance level for the structures.The disturbance zoning method can assess tunnel disturbance with structures,identify high-risk interference locations,and facilitate targeted design reinforcement solutions.展开更多
基金National Key R&D Program of China(No.2021YFB2600900)National Natural Science Foundation of China(Grant No.52078430).
文摘This paper presents a calculation method that evaluates the extent of disturbance based on structural safety limits.Additionally,it summarizes the assessment methods for construction disturbance zones in shield tunneling near pile foundations,urban ground structures,and underground structures.Furthermore,taking the construction of the Chengdu Jinxiu Tunnel under bridges and urban pipelines as the engineering background,a study on the disturbance zoning of adjacent structures was conducted.The most intense disturbance occurs within one week of the tunnel underpass process,and it has a significant impact within a range of two times the tunnel diameter along the tunnel axis.The bridge pile and bridge deck experience less disturbance from tunnel approaching construction,with a maximum disturbance zone characterized as medium disturbance.On the other hand,underground pipelines are subjected to more significant disturbances from tunnel construction,with a maximum disturbance zone classified as strong disturbance.The implementation of“bridge pile sleeve valve pipe grouting&underground pipeline ground grouting&tunnel advance grouting”in the field effectively limits the vertical settlement of bridges and pipelines,resulting in a decrease of approximately 0.1 in disturbance level for the structures.The disturbance zoning method can assess tunnel disturbance with structures,identify high-risk interference locations,and facilitate targeted design reinforcement solutions.