Based on the engineering background of the contact channel between Shangyang and Gushan of Fuzhou Metro Line 2 undercrossing the existing tunnel line,the freezing temperature field of the contact channel,the displacem...Based on the engineering background of the contact channel between Shangyang and Gushan of Fuzhou Metro Line 2 undercrossing the existing tunnel line,the freezing temperature field of the contact channel,the displacement field of the existing tunnel line and the contact channel with different net distances and horizontal angles are analyzed by ANSYS finite element software and field measurement method.The obtained results indicate that during the freezing period,the temperature drops at different measuring holes are almost the same.The temperature near the bottom freezing tube drops faster than that far from the tube.It is found that the bilateral freezing technique improves the formation of the freezing wall in the intersection area.In this case,the intersection time of the cross-section is 7 days faster than that of the adjacent ordinary section.The change curve of the displacement of the surface uplift in different freezing periods with the distance from the center of the channel is“M”shaped.The maximum uplift displacement at 12 m from channel center is 25 mm.The vertical displacement of the measuring point located above the central axis of the connecting channel is large.The farther the point from the central axis,the smaller the corresponding vertical displacement.When the horizontal angle between the existing tunnel and the connecting channel is less than 60,the existing vertical displacement of the tunnel changes rapidly with the horizontal angle,reaching 0.17 mm/.Meanwhile,when the net distance is less than 6.1 m,the change rate of the vertical displacement of the tunnel is up to 2.4 mm/m.展开更多
This paper concentrates on considering the down/up crossing property of weighted Markov collision processes. The joint probability generating function of down crossing and up crossing numbers of weighted Markov collis...This paper concentrates on considering the down/up crossing property of weighted Markov collision processes. The joint probability generating function of down crossing and up crossing numbers of weighted Markov collision processes until its extinction are obtained by constructing and studying a related multi-dimensional Markov chain. Hence, the joint probability distribution of down crossing and up crossing numbers and the mean numbers are obtained.展开更多
基金This research was supported by the project of Natural Science Foundation of Fujian Province(No.2022J01925)supported by the project of the Fuzhou Science and Technology Plan Project(2021-P-047)supported by the Open Project Program Foundation of Engineering Research Center of underground mine construction,Ministry of Education(Anhui University of Science and Technology)(No.JYBGCZX2021104).
文摘Based on the engineering background of the contact channel between Shangyang and Gushan of Fuzhou Metro Line 2 undercrossing the existing tunnel line,the freezing temperature field of the contact channel,the displacement field of the existing tunnel line and the contact channel with different net distances and horizontal angles are analyzed by ANSYS finite element software and field measurement method.The obtained results indicate that during the freezing period,the temperature drops at different measuring holes are almost the same.The temperature near the bottom freezing tube drops faster than that far from the tube.It is found that the bilateral freezing technique improves the formation of the freezing wall in the intersection area.In this case,the intersection time of the cross-section is 7 days faster than that of the adjacent ordinary section.The change curve of the displacement of the surface uplift in different freezing periods with the distance from the center of the channel is“M”shaped.The maximum uplift displacement at 12 m from channel center is 25 mm.The vertical displacement of the measuring point located above the central axis of the connecting channel is large.The farther the point from the central axis,the smaller the corresponding vertical displacement.When the horizontal angle between the existing tunnel and the connecting channel is less than 60,the existing vertical displacement of the tunnel changes rapidly with the horizontal angle,reaching 0.17 mm/.Meanwhile,when the net distance is less than 6.1 m,the change rate of the vertical displacement of the tunnel is up to 2.4 mm/m.
基金This work was substantially supported by the National Natural Science Foundation of China(Grant Nos.11771452,11971486)the Natural Science Foundation of Hunan(No.2020JJ4674).
文摘This paper concentrates on considering the down/up crossing property of weighted Markov collision processes. The joint probability generating function of down crossing and up crossing numbers of weighted Markov collision processes until its extinction are obtained by constructing and studying a related multi-dimensional Markov chain. Hence, the joint probability distribution of down crossing and up crossing numbers and the mean numbers are obtained.