Expenditure on wells constitute a significant part of the operational costs for a petroleum enterprise, where most of the cost results from drilling. This has prompted drilling departments to continuously look for wa...Expenditure on wells constitute a significant part of the operational costs for a petroleum enterprise, where most of the cost results from drilling. This has prompted drilling departments to continuously look for ways to reduce their drilling costs and be as efficient as possible. A system called the Drilling Comprehensive Information Management and Application System (DCIMAS) is developed and presented here, with an aim at collecting, storing and making full use of the valuable well data and information relating to all drilling activities and operations. The DCIMAS comprises three main parts, including a data collection and transmission system, a data warehouse (DW) management system, and an integrated platform of core applications. With the support of the application platform, the DW management system is introduced, whereby the operation data are captured at well sites and transmitted electronically to a data warehouse via transmission equipment and ETL (extract, transformation and load) tools. With the high quality of the data guaranteed, our central task is to make the best use of the operation data and information for drilling analysis and to provide further information to guide later production stages. Applications have been developed and integrated on a uniform platform to interface directly with different layers of the multi-tier DW. Now, engineers in every department spend less time on data handling and more time on applying technology in their real work with the system.展开更多
For the interaction relation between geological object and engineering object in some fields related to water conservancy and hydropower, a unified modeling idea was proposed. On the basis of summarizing both advantag...For the interaction relation between geological object and engineering object in some fields related to water conservancy and hydropower, a unified modeling idea was proposed. On the basis of summarizing both advantages and disadvantages of existing modeling methods, an automatic unified modeling method of both engineering and geological objects based on tri-prism(TP) model was presented. Through the lossless correction algorithm of deviated drill holes contained in this method, the real deviated drill holes could be corrected into the equivalent virtual vertical ones. And the correction accuracy fully meets the requirements of unified modeling. With the virtual vertical drilling data, TIN construction of both cover layer and other stratums would be built in order to obtain the 3D geological model. Then, the engineering design data would be introduced into the 3D geological model for achieving unified modeling. For this process, the volume subdividing and restructuring principles were introduced to deal with the spatial relationships between engineering object and geological object. In order to improve the efficiency of unified modeling, the reconstruction of TIN based on constraint information was also applied in this method. At last, the feasibility and validation of the unified modeling method as well as its relevant key algorithms were verified by specific experiments and analysis of results.展开更多
This paper focuses on the role of communicative drills in communicative language teaching. It first analyzes the necessity and roles of communicative drills in communicative language teaching, and then emphasizes the ...This paper focuses on the role of communicative drills in communicative language teaching. It first analyzes the necessity and roles of communicative drills in communicative language teaching, and then emphasizes the importance of designing communicative drills in language teaching.展开更多
文摘Expenditure on wells constitute a significant part of the operational costs for a petroleum enterprise, where most of the cost results from drilling. This has prompted drilling departments to continuously look for ways to reduce their drilling costs and be as efficient as possible. A system called the Drilling Comprehensive Information Management and Application System (DCIMAS) is developed and presented here, with an aim at collecting, storing and making full use of the valuable well data and information relating to all drilling activities and operations. The DCIMAS comprises three main parts, including a data collection and transmission system, a data warehouse (DW) management system, and an integrated platform of core applications. With the support of the application platform, the DW management system is introduced, whereby the operation data are captured at well sites and transmitted electronically to a data warehouse via transmission equipment and ETL (extract, transformation and load) tools. With the high quality of the data guaranteed, our central task is to make the best use of the operation data and information for drilling analysis and to provide further information to guide later production stages. Applications have been developed and integrated on a uniform platform to interface directly with different layers of the multi-tier DW. Now, engineers in every department spend less time on data handling and more time on applying technology in their real work with the system.
基金Project(BK2012812)supported by the Natural Science Foundation of Jiangsu Province,ChinaProject(51079053)supported by the National Natural Science Foundation of China+2 种基金Project(KYLX_0493)supported by the Scientific Research and Innovation Program for College Graduates of Jiangsu Province,ChinaProject(2014B38814)supported by the Fundamental Research Funds for Central Universities,ChinaProject(2014.1526)supported by the Open Research Fund Program of Key Laboratory of Geological Information of Ministry of Land and Resources,China
文摘For the interaction relation between geological object and engineering object in some fields related to water conservancy and hydropower, a unified modeling idea was proposed. On the basis of summarizing both advantages and disadvantages of existing modeling methods, an automatic unified modeling method of both engineering and geological objects based on tri-prism(TP) model was presented. Through the lossless correction algorithm of deviated drill holes contained in this method, the real deviated drill holes could be corrected into the equivalent virtual vertical ones. And the correction accuracy fully meets the requirements of unified modeling. With the virtual vertical drilling data, TIN construction of both cover layer and other stratums would be built in order to obtain the 3D geological model. Then, the engineering design data would be introduced into the 3D geological model for achieving unified modeling. For this process, the volume subdividing and restructuring principles were introduced to deal with the spatial relationships between engineering object and geological object. In order to improve the efficiency of unified modeling, the reconstruction of TIN based on constraint information was also applied in this method. At last, the feasibility and validation of the unified modeling method as well as its relevant key algorithms were verified by specific experiments and analysis of results.
文摘This paper focuses on the role of communicative drills in communicative language teaching. It first analyzes the necessity and roles of communicative drills in communicative language teaching, and then emphasizes the importance of designing communicative drills in language teaching.