期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Single Machine Scheduling Problem with Fuzzy Due Dates and Fuzzy Precedence
1
作者 谢源 谢剑英 黄芹华 《Journal of Shanghai University(English Edition)》 CAS 2005年第5期450-454,共5页
A single machine scheduling problem involving fuzzy due dates and fuzzy precedence constraints is investigated. The fuzzy precedence reflects the satisfaction level with respect to precedence between two jobs. A membe... A single machine scheduling problem involving fuzzy due dates and fuzzy precedence constraints is investigated. The fuzzy precedence reflects the satisfaction level with respect to precedence between two jobs. A membership function is associated with each job Ji, which describes the degree of satisfaction with respect to completion time of Ji. For the bi-criteria scheduling problem, an 0 ( n^3 ) algorithm is proposed for finding nondominated solutions. 展开更多
关键词 fuzzy due dates fuzzy precedence nondominated schedules.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部