Work on dynamic topology optimization of engineering structures for vibration suppression has mainly addressed the maximization of eigenfrequencies and gaps between consecutive eigenfrequencies of free vibration, mini...Work on dynamic topology optimization of engineering structures for vibration suppression has mainly addressed the maximization of eigenfrequencies and gaps between consecutive eigenfrequencies of free vibration, minimization of the dynamic compliance subject to forced vibration, and minimization of the structural frequency response. A dynamic topology optimization method of bi-material plate structures is presented based on power flow analysis. Topology optimization problems formulated directly with the design objective of minimizing the power flow response are dealt with. In comparison to the displacement or velocity response, the power flow response takes not only the amplitude of force and velocity into account, but also the phase relationship of the two vector quantities. The complex expression of power flow response is derived based on time-harmonic external mechanical loading and Rayleigh damping. The mathematical formulation of topology optimization is established based on power flow response and bi-material solid isotropic material with penalization(SIMP) model. Computational optimization procedure is developed by using adjoint design sensitivity analysis and the method of moving asymptotes(MMA). Several numerical examples are presented for bi-material plate structures with different loading frequencies, which verify the feasibility and effectiveness of this method. Additionally, optimum results between topological design of minimum power flow response and minimum dynamic compliance are compared, showing that the present method has strong adaptability for structural dynamic topology optimization problems. The proposed research provides a more accurate and effective approach for dynamic topology optimization of vibrating structures.展开更多
In practice,an equilibrium point of the power system is considered transiently secure if it can withstand a specified contingency by maintaining transient evolution of rotor angles and voltage magnitudes within set bo...In practice,an equilibrium point of the power system is considered transiently secure if it can withstand a specified contingency by maintaining transient evolution of rotor angles and voltage magnitudes within set bounds.A novel sequential approach is proposed to obtain transiently stable equilibrium points through the preventive control of transient stability and transient voltage sag(TVS)problems caused by a severe disturbance.The proposed approach conducts a sequence of non-heuristic optimal active power re-dispatch of the generators to steer the system toward a transiently secure operating point by sequentially solving the transient-stability-constrained optimal power flow(TSC-OPF)problems.In the proposed approach,there are two sequential projection stages,with the first stage ensuring the rotor angle stability and the second stage removing TVS in voltage magnitudes.In both projection stages,the projection operation corresponds to the TSC-OPF,with its formulation directly derived by adding only two steady-state variable-based transient constraints to the conventional OPF problem.The effectiveness of this approach is numerically demonstrated in terms of its accuracy and computational performance by using the Western System Coordinated Council(WSCC)3-machine 9-bus system and an equivalent model of the Mexican 46-machine 190-bus system.展开更多
This paper studies the economic environmental energy-saving day-ahead scheduling problem of power systems considering wind generation(WG)and demand response(DR)by means of multi-objective dynamic optimal power flow(MD...This paper studies the economic environmental energy-saving day-ahead scheduling problem of power systems considering wind generation(WG)and demand response(DR)by means of multi-objective dynamic optimal power flow(MDOPF).Within the model,fuel cost,carbon emission and active power losses are taken as objectives,and an integrated dispatch modeof conventional coal-fired generation,WG and DRis utilized.The corresponding solution process to the MDOPF is based on ahybrid of a non-dominated sorting genetic algorithm-II(NSGA-II)and fuwzy satisfaction-maximizing method,where NSGA-II obtains the Pareto frontier and the fuzzy satisfaction-maximizing method is the chosen strategy.Illustrative cases of different scenarios are performed based on an IEEE 6-units\,30-nodes system,to verify the proposed model and the solution process,as well as the benefits obtained by the DR into power system.展开更多
Battery energy storage systems(BESS)are instrumental in the transition to a low carbon electrical network with enhanced flexibility,however,the set objective can be accomplished only through suitable scheduling of the...Battery energy storage systems(BESS)are instrumental in the transition to a low carbon electrical network with enhanced flexibility,however,the set objective can be accomplished only through suitable scheduling of their operation.This paper develops a dynamic optimal power flow(DOPF)-based scheduling framework to optimize the day(s)-ahead operation of a grid-scale BESS aiming to mitigate the predicted limits on the renewable energy generation as well as smooth out the network demand to be supplied by conventional generators.In DOPF,all the generating units,including the ones that model the exports and imports of the BESS,across the entire network and the complete time horizon are integrated on to a single network.Subsequently,an AC-OPF is applied to dispatch their power outputs to minimize the total generation cost,while satisfying the power balance equations,and handling the unit and network constraints at each time step coupled with intertemporal constraints associated with the state of charge(SOC).Furthermore,the DOPF developed here entails the frequently applied constant current-constant voltage charging profile,which is represented in the SOC domain.Considering the practical application of a 1 MW BESS on a particular 33 kV network,the scheduling framework is designed to meet the pragmatic requirements of the optimum utilization of the available energy capacity of BESS in each cycle,while completing up to one cycle per day.展开更多
Dynamic operating envelopes(DOEs),as key enablers to facilitate distributed energy resource(DER)integration,have attracted increasing attention in the past years.However,uncertainties,which may come from load forecast...Dynamic operating envelopes(DOEs),as key enablers to facilitate distributed energy resource(DER)integration,have attracted increasing attention in the past years.However,uncertainties,which may come from load forecasting errors or inaccurate network parameters,have been rarely discussed in DOE calculation,leading to compromised quality of the hosting capacity allocation strategy.This letter studies how to calculate DOEs that are immune to such uncertainties based on a linearised unbalanced three-phase optimal power flow(UTOPF)model.With uncertain parameters constrained by norm balls,formulations for calculating robust DOEs(RDOEs)are presented along with discussions on their tractability.Two cases,including a 2-bus illustrative network and a representative Australian network,are tested to demonstrate the effectiveness and efficiency of the proposed approach.展开更多
基金supported by China Armament Pre-research Foundation(Grant No. 51318010402)UK Engineering and Physical Science Research Council (EPSRC), and China Scholarship Council (Grant No.2010611054)
文摘Work on dynamic topology optimization of engineering structures for vibration suppression has mainly addressed the maximization of eigenfrequencies and gaps between consecutive eigenfrequencies of free vibration, minimization of the dynamic compliance subject to forced vibration, and minimization of the structural frequency response. A dynamic topology optimization method of bi-material plate structures is presented based on power flow analysis. Topology optimization problems formulated directly with the design objective of minimizing the power flow response are dealt with. In comparison to the displacement or velocity response, the power flow response takes not only the amplitude of force and velocity into account, but also the phase relationship of the two vector quantities. The complex expression of power flow response is derived based on time-harmonic external mechanical loading and Rayleigh damping. The mathematical formulation of topology optimization is established based on power flow response and bi-material solid isotropic material with penalization(SIMP) model. Computational optimization procedure is developed by using adjoint design sensitivity analysis and the method of moving asymptotes(MMA). Several numerical examples are presented for bi-material plate structures with different loading frequencies, which verify the feasibility and effectiveness of this method. Additionally, optimum results between topological design of minimum power flow response and minimum dynamic compliance are compared, showing that the present method has strong adaptability for structural dynamic topology optimization problems. The proposed research provides a more accurate and effective approach for dynamic topology optimization of vibrating structures.
基金supported by the Fondo de Sustentabilidad Energética SENER-Conacyt,México(No.246949,No.249795)。
文摘In practice,an equilibrium point of the power system is considered transiently secure if it can withstand a specified contingency by maintaining transient evolution of rotor angles and voltage magnitudes within set bounds.A novel sequential approach is proposed to obtain transiently stable equilibrium points through the preventive control of transient stability and transient voltage sag(TVS)problems caused by a severe disturbance.The proposed approach conducts a sequence of non-heuristic optimal active power re-dispatch of the generators to steer the system toward a transiently secure operating point by sequentially solving the transient-stability-constrained optimal power flow(TSC-OPF)problems.In the proposed approach,there are two sequential projection stages,with the first stage ensuring the rotor angle stability and the second stage removing TVS in voltage magnitudes.In both projection stages,the projection operation corresponds to the TSC-OPF,with its formulation directly derived by adding only two steady-state variable-based transient constraints to the conventional OPF problem.The effectiveness of this approach is numerically demonstrated in terms of its accuracy and computational performance by using the Western System Coordinated Council(WSCC)3-machine 9-bus system and an equivalent model of the Mexican 46-machine 190-bus system.
基金This work was supported in part by the National Natural Science Foundation of China under Grant 51277015,51677007 and 51977012.
文摘This paper studies the economic environmental energy-saving day-ahead scheduling problem of power systems considering wind generation(WG)and demand response(DR)by means of multi-objective dynamic optimal power flow(MDOPF).Within the model,fuel cost,carbon emission and active power losses are taken as objectives,and an integrated dispatch modeof conventional coal-fired generation,WG and DRis utilized.The corresponding solution process to the MDOPF is based on ahybrid of a non-dominated sorting genetic algorithm-II(NSGA-II)and fuwzy satisfaction-maximizing method,where NSGA-II obtains the Pareto frontier and the fuzzy satisfaction-maximizing method is the chosen strategy.Illustrative cases of different scenarios are performed based on an IEEE 6-units\,30-nodes system,to verify the proposed model and the solution process,as well as the benefits obtained by the DR into power system.
文摘Battery energy storage systems(BESS)are instrumental in the transition to a low carbon electrical network with enhanced flexibility,however,the set objective can be accomplished only through suitable scheduling of their operation.This paper develops a dynamic optimal power flow(DOPF)-based scheduling framework to optimize the day(s)-ahead operation of a grid-scale BESS aiming to mitigate the predicted limits on the renewable energy generation as well as smooth out the network demand to be supplied by conventional generators.In DOPF,all the generating units,including the ones that model the exports and imports of the BESS,across the entire network and the complete time horizon are integrated on to a single network.Subsequently,an AC-OPF is applied to dispatch their power outputs to minimize the total generation cost,while satisfying the power balance equations,and handling the unit and network constraints at each time step coupled with intertemporal constraints associated with the state of charge(SOC).Furthermore,the DOPF developed here entails the frequently applied constant current-constant voltage charging profile,which is represented in the SOC domain.Considering the practical application of a 1 MW BESS on a particular 33 kV network,the scheduling framework is designed to meet the pragmatic requirements of the optimum utilization of the available energy capacity of BESS in each cycle,while completing up to one cycle per day.
基金supported by the CSIRO Strategic Project on Network Optimisation&Decarbonisation(No.OD-107890).
文摘Dynamic operating envelopes(DOEs),as key enablers to facilitate distributed energy resource(DER)integration,have attracted increasing attention in the past years.However,uncertainties,which may come from load forecasting errors or inaccurate network parameters,have been rarely discussed in DOE calculation,leading to compromised quality of the hosting capacity allocation strategy.This letter studies how to calculate DOEs that are immune to such uncertainties based on a linearised unbalanced three-phase optimal power flow(UTOPF)model.With uncertain parameters constrained by norm balls,formulations for calculating robust DOEs(RDOEs)are presented along with discussions on their tractability.Two cases,including a 2-bus illustrative network and a representative Australian network,are tested to demonstrate the effectiveness and efficiency of the proposed approach.