期刊文献+
共找到27篇文章
< 1 2 >
每页显示 20 50 100
Dynamic Economic Scheduling with Self-Adaptive Uncertainty in Distribution Network Based on Deep Reinforcement Learning
1
作者 Guanfu Wang Yudie Sun +5 位作者 Jinling Li Yu Jiang Chunhui Li Huanan Yu He Wang Shiqiang Li 《Energy Engineering》 EI 2024年第6期1671-1695,共25页
Traditional optimal scheduling methods are limited to accurate physical models and parameter settings, which aredifficult to adapt to the uncertainty of source and load, and there are problems such as the inability to... Traditional optimal scheduling methods are limited to accurate physical models and parameter settings, which aredifficult to adapt to the uncertainty of source and load, and there are problems such as the inability to make dynamicdecisions continuously. This paper proposed a dynamic economic scheduling method for distribution networksbased on deep reinforcement learning. Firstly, the economic scheduling model of the new energy distributionnetwork is established considering the action characteristics of micro-gas turbines, and the dynamic schedulingmodel based on deep reinforcement learning is constructed for the new energy distribution network system with ahigh proportion of new energy, and the Markov decision process of the model is defined. Secondly, Second, for thechanging characteristics of source-load uncertainty, agents are trained interactively with the distributed networkin a data-driven manner. Then, through the proximal policy optimization algorithm, agents adaptively learn thescheduling strategy and realize the dynamic scheduling decision of the new energy distribution network system.Finally, the feasibility and superiority of the proposed method are verified by an improved IEEE 33-node simulationsystem. 展开更多
关键词 SELF-ADAPTIVE the uncertainty of sources and load deep reinforcement learning dynamic economic scheduling
下载PDF
Intelligent optimization method for the dynamic scheduling of hot metal ladles of one-ladle technology on ironmaking and steelmaking interface in steel plants
2
作者 Li Zeng Zhong Zheng +5 位作者 Xiaoyuan Lian Kai Zhang Mingmei Zhu Kaitian Zhang Chaoyue Xu Fei Wang 《International Journal of Minerals,Metallurgy and Materials》 SCIE EI CAS CSCD 2023年第9期1729-1739,共11页
The one-ladle technology requires an efficient ironmaking and steelmaking interface. The scheduling of the hot metal ladle in the steel plant determines the overall operational efficiency of the interface. Considering... The one-ladle technology requires an efficient ironmaking and steelmaking interface. The scheduling of the hot metal ladle in the steel plant determines the overall operational efficiency of the interface. Considering the strong uncertainties of real-world production environments, this work studies the dynamic scheduling problem of hot metal ladles and develops a data-driven three-layer approach to solve this problem. A dynamic scheduling optimization model of the hot metal ladle operation with a minimum average turnover time as the optimization objective is also constructed. Furthermore, the intelligent perception of industrial scenes and autonomous identification of disturbances, adaptive configuration of dynamic scheduling strategies, and real-time adjustment of schedules can be realized. The upper layer generates a demand-oriented prescheduling scheme for hot metal ladles. The middle layer adaptively adjusts this scheme to obtain an executable schedule according to the actual supply–demand relationship. In the lower layer, three types of dynamic scheduling strategies are designed according to the characteristics of the dynamic disturbance in the model:real-time flexible fine-tuning, local machine adjustment, and global rescheduling. Case test using 24 h production data on a certain day during the system operation of a steel plant shows that the method and system can effectively reduce the fluctuation and operation time of the hot metal ladle and improve the stability of the ironmaking and steelmaking interface production rhythm. The data-driven dynamic scheduling strategy is feasible and effective, and the proposed method can improve the operation efficiency of hot metal ladles. 展开更多
关键词 hot metal ladles ironmaking and steelmaking interface one-ladle technology dynamic scheduling data-driven
下载PDF
An Advanced Dynamic Scheduling for Achieving Optimal Resource Allocation
3
作者 R.Prabhu S.Rajesh 《Computer Systems Science & Engineering》 SCIE EI 2023年第1期281-295,共15页
Cloud computing distributes task-parallel among the various resources.Applications with self-service supported and on-demand service have rapid growth.For these applications,cloud computing allocates the resources dyn... Cloud computing distributes task-parallel among the various resources.Applications with self-service supported and on-demand service have rapid growth.For these applications,cloud computing allocates the resources dynami-cally via the internet according to user requirements.Proper resource allocation is vital for fulfilling user requirements.In contrast,improper resource allocations result to load imbalance,which leads to severe service issues.The cloud resources implement internet-connected devices using the protocols for storing,communi-cating,and computations.The extensive needs and lack of optimal resource allo-cating scheme make cloud computing more complex.This paper proposes an NMDS(Network Manager based Dynamic Scheduling)for achieving a prominent resource allocation scheme for the users.The proposed system mainly focuses on dimensionality problems,where the conventional methods fail to address them.The proposed system introduced three–threshold mode of task based on its size STT,MTT,LTT(small,medium,large task thresholding).Along with it,task mer-ging enables minimum energy consumption and response time.The proposed NMDS is compared with the existing Energy-efficient Dynamic Scheduling scheme(EDS)and Decentralized Virtual Machine Migration(DVM).With a Network Manager-based Dynamic Scheduling,the proposed model achieves excellence in resource allocation compared to the other existing models.The obtained results shows the proposed system effectively allocate the resources and achieves about 94%of energy efficient than the other models.The evaluation metrics taken for comparison are energy consumption,mean response time,percentage of resource utilization,and migration. 展开更多
关键词 Cloud computing resource allocation load balance dynamic scheduling dimensionality reduction
下载PDF
Dynamic Scheduling and Path Planning of Automated Guided Vehicles in Automatic Container Terminal 被引量:5
4
作者 Lijun Yue Houming Fan 《IEEE/CAA Journal of Automatica Sinica》 SCIE EI CSCD 2022年第11期2005-2019,共15页
The uninterrupted operation of the quay crane(QC)ensures that the large container ship can depart port within laytime,which effectively reduces the handling cost for the container terminal and ship owners.The QC waiti... The uninterrupted operation of the quay crane(QC)ensures that the large container ship can depart port within laytime,which effectively reduces the handling cost for the container terminal and ship owners.The QC waiting caused by automated guided vehicles(AGVs)delay in the uncertain environment can be alleviated by dynamic scheduling optimization.A dynamic scheduling process is introduced in this paper to solve the AGV scheduling and path planning problems,in which the scheduling scheme determines the starting and ending nodes of paths,and the choice of paths between nodes affects the scheduling of subsequent AGVs.This work proposes a two-stage mixed integer optimization model to minimize the transportation cost of AGVs under the constraint of laytime.A dynamic optimization algorithm,including the improved rule-based heuristic algorithm and the integration of the Dijkstra algorithm and the Q-Learning algorithm,is designed to solve the optimal AGV scheduling and path schemes.A new conflict avoidance strategy based on graph theory is also proposed to reduce the probability of path conflicts between AGVs.Numerical experiments are conducted to demonstrate the effectiveness of the proposed model and algorithm over existing methods. 展开更多
关键词 Automated container terminal dynamic scheduling path planning Q-Learning algorithm rule-based heuristic algorithm
下载PDF
SWARM INTELLIGENCE BASED DYNAMIC REAL-TIME SCHEDULING APPROACH FOR SEMICONDUCTOR WAFER FAB 被引量:4
5
作者 LiLi FeiQiao WuQidi 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2005年第1期71-74,共4页
Based on the analysis of collective activities of ant colonies, the typicalexample of swarm intelligence, a new approach to construct swarm intelligence basedmulti-agent-system (SMAS) for dynamic real-time scheduling ... Based on the analysis of collective activities of ant colonies, the typicalexample of swarm intelligence, a new approach to construct swarm intelligence basedmulti-agent-system (SMAS) for dynamic real-time scheduling for semiconductor wafer fab is proposed.The relevant algorithm, pheromone-based dynamic real-time scheduling algorithm (PBDR), is given.MIMAC test bed data set mini-fab is used to compare PBDR with FIFO (first in first out),SRPT(shortest remaining processing time) and CR(critical ratio) under three different release rules,i.e. deterministic rule, Poisson rule and CONWIP (constant WIP). It is shown that PBDR is prior toFIFO, SRPT and CR with better performance of cycle time, throughput, and on-time delivery,especially for on-time delivery performance. 展开更多
关键词 Swarm intelligence Ant colonies PHEROMONE Ant agents Semiconductor waferfab dynamic real-time scheduling
下载PDF
Research of improving the dynamic scheduling algorithm in the CAN bus control networks 被引量:1
6
作者 Wang Liming Shao Ying +1 位作者 Wang Mingzhe Shan Yong 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2008年第6期1250-1257,共8页
Currently, the article analyzes the CAN bus's rule of priority's arbitration bit by bit without destroy. It elicits the conclusion that if static priority based on the affirmatory system model is used, the lower pri... Currently, the article analyzes the CAN bus's rule of priority's arbitration bit by bit without destroy. It elicits the conclusion that if static priority based on the affirmatory system model is used, the lower priority's messages will be delayed considerably more, even some data will be lost when the bus's bandwidth is widely used. The scheduling cannot be modified neither during the system when static priority is used. The dynamic priority promoting method and the math model of SQSA and SQMA are presented; it analyzes the model's rate of taking in and sending out in large quantities, the largest delay, the problems and solutions when using SQMA. In the end, it is confirmed that the method of improving dynamic priority has good performances on the network rate of taking in and sending out in large quantities, the average delay, and the rate of network usage by emulational experiments. 展开更多
关键词 CAN static scheduling dynamic scheduling single queue single algorithm single queue multi algo-rithm average delay network load rate
下载PDF
STUDY ON THE DYNAMIC SCHEDULING IN FMS REAL-TIME PRODUCTION ENVIRONMENT 被引量:2
7
作者 Yang Honghong,Wu Zhiming (Department of Automation, Shanghai Jiaotong University) 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2001年第3期193-197,共5页
A dynamic database based dynamic scheduling system is proposed.As the schedule is being preformed, the scheduling task data in the dynamic database is updated timely.Genetic algorithm (GA) is employed for generating o... A dynamic database based dynamic scheduling system is proposed.As the schedule is being preformed, the scheduling task data in the dynamic database is updated timely.Genetic algorithm (GA) is employed for generating optimised production plan quickly and easily in response to changes on the shop floor. The current status of the shop is considered while rescheduling, and new plan is used in conjunction with the existing schedule to improve the effeciency of flexble manufacturing systems. Simulation results demonstrate the effectiveness of the proposed system. 展开更多
关键词 dynamic scheduling dynamic database Genetic algorithms
下载PDF
DYNAMIC ADVANCED PLANNING AND SCHEDULING WITH FROZEN INTERVAL FOR NEW ORDERS 被引量:2
8
作者 CHEN Kejia JI Ping 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2007年第4期117-119,共3页
A dynamic advanced planning and scheduling (DAPS) problem is addressed where new orders arrive on a continuous basis. A periodic policy with frozen interval is adopted to increase stability on the shop floor. A gene... A dynamic advanced planning and scheduling (DAPS) problem is addressed where new orders arrive on a continuous basis. A periodic policy with frozen interval is adopted to increase stability on the shop floor. A genetic algorithm is developed to find a schedule at each rescheduling point for both original orders and new orders that both production idle time and penalties on tardiness and earliness of orders are minimized. The proposed methodology is tested on a small example to illustrate the effect of the frozen interval. The results indicate that the suggested approach can improve the schedule stability while retaining efficiency. 展开更多
关键词 dynamic advanced planning and scheduling Genetic algorithm Frozen interval
下载PDF
Dynamic Resource Scheduling in Emergency Environment
9
作者 Yuankun Yan Yan Kong Zhangjie Fu 《Journal of Information Hiding and Privacy Protection》 2019年第3期143-155,共13页
Nowadays,emergency accidents could happen at any time.The accidents occur unpredictably and the accidents requirements are diversely.The accidents happen in a dynamic environment and the resource should be cooperative... Nowadays,emergency accidents could happen at any time.The accidents occur unpredictably and the accidents requirements are diversely.The accidents happen in a dynamic environment and the resource should be cooperative to solve the accidents.Most methods are focusing on minimizing the casualties and property losses in a static environment.However,they are lack in considering the dynamic and unpredictable event handling.In this paper,we propose a representative environmental model in representation of emergency and dynamic resource allocation model,and an adaptive mathematical model based on Genetic Algorithm(GA)to generate an optimal set of solution domain.The experimental results show that the proposed algorithm can get a set of better candidate solutions. 展开更多
关键词 Cooperative allocation dynamic resource scheduling adaptive genetic algorithm
下载PDF
An Envy-Free Online UAV Charging Scheme with Vehicle-Mounted Mobile Wireless Chargers
10
作者 Yuntao Wang Zhou Su 《China Communications》 SCIE CSCD 2023年第8期89-102,共14页
In commercial unmanned aerial vehicle(UAV)applications,one of the main restrictions is UAVs’limited battery endurance when executing persistent tasks.With the mature of wireless power transfer(WPT)technologies,by lev... In commercial unmanned aerial vehicle(UAV)applications,one of the main restrictions is UAVs’limited battery endurance when executing persistent tasks.With the mature of wireless power transfer(WPT)technologies,by leveraging ground vehicles mounted with WPT facilities on their proofs,we propose a mobile and collaborative recharging scheme for UAVs in an on-demand manner.Specifically,we first present a novel air-ground cooperative UAV recharging framework,where ground vehicles cooperatively share their idle wireless chargers to UAVs and a swarm of UAVs in the task area compete to get recharging services.Considering the mobility dynamics and energy competitions,we formulate an energy scheduling problem for UAVs and vehicles under practical constraints.A fair online auction-based solution with low complexity is also devised to allocate and price idle wireless chargers on vehicular proofs in real time.We rigorously prove that the proposed scheme is strategy-proof,envy-free,and produces stable allocation outcomes.The first property enforces that truthful bidding is the dominant strategy for participants,the second ensures that no user is better off by exchanging his allocation with another user when the auction ends,while the third guarantees the matching stability between UAVs and UGVs.Extensive simulations validate that the proposed scheme outperforms benchmarks in terms of energy allocation efficiency and UAV’s utility. 展开更多
关键词 UAV recharging WPT air-ground collaboration dynamic energy scheduling envy-freeness
下载PDF
基于相对残余度的LDPC码置信传播译码调度算法(英文) 被引量:2
11
作者 黄捷 张立军 《China Communications》 SCIE CSCD 2011年第5期47-53,共7页
Two Relative-Residual-based Dynamic Schedules(RRDS) for Belief Propagation(BP) decoding of Low-Density Parity-Check(LDPC) codes are proposed,in which the Variable code-RRDS(VN-RRDS) is a greediness-reduced version of ... Two Relative-Residual-based Dynamic Schedules(RRDS) for Belief Propagation(BP) decoding of Low-Density Parity-Check(LDPC) codes are proposed,in which the Variable code-RRDS(VN-RRDS) is a greediness-reduced version of the Check code-RRDS(CN-RRDS).The RRDS only processes the variable(or check) node,which has the maximum relative residual among all the variable(or check) nodes in each decoding iteration,thus keeping less greediness and decreased complexity in comparison with the edge-based Variable-to-Check Residual Belief Propagation(VC-RBP) algorithm.Moreover,VN-RRDS propagates first the message which has the largest residual based on all check equations.For different types of LDPC codes,simulation results show that the convergence rate of RRDS is higher than that of VC-RBP while keeping very low computational complexity.Furthermore,VN-RRDS achieves faster convergence as well as better performance than CN-RRDS. 展开更多
关键词 LDPC codes dynamic schedule relative-residual greediness BP
下载PDF
一种云数据中心资源的动态综合负载均衡调度算法(英文) 被引量:6
12
作者 田文洪 赵勇 +2 位作者 仲元椋 徐敏贤 景晨 《China Communications》 SCIE CSCD 2011年第6期117-126,共10页
One of the challenging scheduling problems in Cloud data centers is to take the allocation and migration of reconfigurable virtual machines as well as the integrated features of hosting physical machines into consider... One of the challenging scheduling problems in Cloud data centers is to take the allocation and migration of reconfigurable virtual machines as well as the integrated features of hosting physical machines into consideration. We introduce a Dynamic and Integrated Resource Scheduling algorithm (DAIRS) for Cloud data centers. Unlike traditional load-balance scheduling algorithms which often consider only one factor such as the CPU load in physical servers, DAIRS treats CPU, memory and network bandwidth integrated for both physical machines and virtual machines. We develop integrated measurement for the total imbalance level of a Cloud datacenter as well as the average imbalance level of each server. Simulation results show that DAIRS has good performance with regard to total imbalance level, average imbalance level of each server, as well as overall running time. 展开更多
关键词 cloud computing load balance dynamic and integrated resource scheduling algorithm cloud datacenter
下载PDF
Project Management and Coordination of Distributed Cooperative Product Design in a Virtual Enterprise 被引量:2
13
作者 CAOYan ZHANGYing-jie ZHAORu-fia 《International Journal of Plant Engineering and Management》 2004年第4期183-191,共9页
The architecture of project management of distributed concurrent product design in a virtual enterprise is put forward. T he process of project management and its functions are presented. Product design process coo... The architecture of project management of distributed concurrent product design in a virtual enterprise is put forward. T he process of project management and its functions are presented. Product design process coordination is also discussed. First, based on the analysis of traditi onal project management, project management and coordination of distributed coop erative product design in the virtual enterprise is put forward. Then, aiming at the characteristics of a distributed concurrent product design process, the inh erent rules and complex interrelations in product development are studied. Accor dingly, the architecture of project management of distributed cooperative produc t design in a virtual enterprise is presented to adapt to distributed concurrent development of complex products. The main advantages of the architecture are al so discussed. Finally, the emphasis is placed on the project management process. Its main functions are set forth, such as project definition, task decompositio n and distribution, resource constraints and dynamic resource scheduling, proces s fusion, task scheduling and monitoring, project plan, cost and quality evaluat ion, etc. 展开更多
关键词 virtual enterprise project management ar chitecture dynamic resource scheduling process fusion
下载PDF
Scheduling Multi-Mode Resource-Constrained Projects Using Heuristic Rules Under Uncertainty Environment
14
作者 Mohamed Abdel-Basset Ahmed Sleem +2 位作者 Asmaa Atef Yunyoung Nam Mohamed Abouhawwash 《Computers, Materials & Continua》 SCIE EI 2022年第1期847-874,共28页
Project scheduling is a key objective of many models and is the proposed method for project planning and management.Project scheduling problems depend on precedence relationships and resource constraints,in addition t... Project scheduling is a key objective of many models and is the proposed method for project planning and management.Project scheduling problems depend on precedence relationships and resource constraints,in addition to some other limitations for achieving a subset of goals.Project scheduling problems are dependent on many limitations,including limitations of precedence relationships,resource constraints,and some other limitations for achieving a subset of goals.Deterministic project scheduling models consider all information about the scheduling problem such as activity durations and precedence relationships information resources available and required,which are known and stable during the implementation process.The concept of deterministic project scheduling conflicts with real situations,in which in many cases,some data on the activity’s durations of the project and the degree of availability of resources change or may have different modes and strategies during the process of project implementation for dealing with multi-mode conditions surrounded by projects and their activity durations.Scheduling the multi-mode resource-constrained project problem is an optimization problem whose minimum project duration subject to the availability of resources is of particular interest to us.We use the multi-mode resource allocation and schedulingmodel that takes into account the dynamicity features of all parameters,that is,the scheduling process must be flexible to dynamic environment features.In this paper,we propose five priority heuristic rules for scheduling multi-mode resource-constrained projects under dynamicity features for more realistic situations,in which we apply the proposed heuristic rules(PHR)for scheduling multi-mode resource-constrained projects.Five projects are considered test problems for the PHR.The obtained results rendered by these priority rules for the test problems are compared by the results obtained from 10 well-known heuristics rules rendered for the same test problems.The results in many cases of the proposed priority rules are very promising,where they achieve better scheduling dates in many test case problems and the same results for the others.The proposed model is based on the dynamic features for project topography. 展开更多
关键词 Constrained resource scheduling multi-mode durations dynamic scheduling resource allocation heuristic rules
下载PDF
Evaluation of Operation Flexibility and Operation Selection in Multi-agent Based Production Scheduling
15
作者 SUN Rong-lei, XIONG You-lun, DU Run-sheng, DING HanSchool of Mechanical Science and Engineering, Huazhong University of Science and Technology, Wuhan 430074, P. R. China 《International Journal of Plant Engineering and Management》 2002年第2期59-66,共8页
Based on the concept of operation flexibility, we study the relationship among multiple operation sequences and provide a flexibility measure for operation sequences. A criterion is proposed to prioritize each operati... Based on the concept of operation flexibility, we study the relationship among multiple operation sequences and provide a flexibility measure for operation sequences. A criterion is proposed to prioritize each operation (rather than sequence). Under the multi-agent architecture the criterion can be used to guide the decision-making procedure during production scheduling so that there is an adequate flexibility at each decision point. Experimental results demonstrate the efficiency of the criterion when it is used as a scheduling heuristic. It can increase flexibility of manufacturing systems, and consequently improve the performance of the systems. 展开更多
关键词 FLEXIBILITY process plan dynamic scheduling production scheduling
下载PDF
Analysis of dispatching rules in a stochastic dynamic job shop manufacturing system with sequence-dependent setup times 被引量:2
16
作者 Pankaj SHARMA Ajai JAIN 《Frontiers of Mechanical Engineering》 SCIE CSCD 2014年第4期380-389,共10页
Stochastic dynamic job shop scheduling pro- blem with consideration of sequence-dependent setup times are among the most difficult classes of scheduling problems. This paper assesses the performance of nine dispatchin... Stochastic dynamic job shop scheduling pro- blem with consideration of sequence-dependent setup times are among the most difficult classes of scheduling problems. This paper assesses the performance of nine dispatching rules in such shop from makespan, mean flow time, maximum flow time, mean tardiness, maximum tardiness, number of tardy jobs, total setups and mean setup time performance measures viewpoint. A discrete event simulation model of a stochastic dynamic job shop manufacturing system is developed for investigation purpose. Nine dispatching rules identified from literature are incorporated in the simulation model. The simulation experiments are conducted under due date tightness factor of 3, shop utilization percentage of 90 % and setup times less than processing times. Results indicate that shortest setup time (SIMSET) rule provides the best performance for mean flow time and number of tardy jobs measures. The job with similar setup and modified earliest due date (JMEDD) rule provides the best performance for make- span, maximum flow time, mean tardiness, maximum tardiness, total setups and mean setup time measures. 展开更多
关键词 scheduling sequence-dependent setuptionstochastic dynamic job shop times dispatching rule SIMULATION
原文传递
Implementable Strategy Research of Brake Energy Recovery Based on Dynamic Programming Algorithm for a Parallel Hydraulic Hybrid Bus 被引量:6
17
作者 Zhong-Liang Zhang Jie Chen 《International Journal of Automation and computing》 EI CSCD 2014年第3期249-255,共7页
The purpose of this paper is to develop an implementable strategy of brake energy recovery for a parallel hydraulic hybrid bus. Based on brake process analysis, a dynamic programming algorithm of brake energy recovery... The purpose of this paper is to develop an implementable strategy of brake energy recovery for a parallel hydraulic hybrid bus. Based on brake process analysis, a dynamic programming algorithm of brake energy recovery is established. And then an implementable strategy of brake energy recovery is proposed by the constraint variable trajectories analysis of the dynamic programming algorithm in the typical urban bus cycle. The simulation results indicate the brake energy recovery efficiency of the accumulator can reach 60% in the dynamic programming algorithm. And the hydraulic hybrid system can output braking torque as much as possible.Moreover, the accumulator has almost equal efficiency of brake energy recovery between the implementable strategy and the dynamic programming algorithm. Therefore, the implementable strategy is very effective in improving the efficiency of brake energy recovery.The road tests show the fuel economy of the hydraulic hybrid bus improves by 22.6% compared with the conventional bus. 展开更多
关键词 Implementable strategy brake energy recovery dynamic programming parallel hydraulic hybrid bus shifting schedule pump/motor displacement.
原文传递
Associating Memory Through Case-Based Immune Mechanisms for Dynamic Job-Shop Scheduling
18
作者 尹文君 刘民 吴澄 《Tsinghua Science and Technology》 SCIE EI CAS 2004年第4期422-427,共6页
Knowledge plays an active role in job-shop scheduling, especially in dynamic environments. A novel case-based immune framework was developed for static and dynamic job-shop problems, using the associative memory and k... Knowledge plays an active role in job-shop scheduling, especially in dynamic environments. A novel case-based immune framework was developed for static and dynamic job-shop problems, using the associative memory and knowledge reuse from case-based reasoning (CBR) and immune response mechanisms. A 2-level similarity index which combines both job routing and problem solution characteristics based on DNA matching ideas was defined for both the CBR and immune algorithms. A CBR-embedded immune algorithms (CBR-IAs) framework was then developed focusing on case retrieval and adaptation methods. In static environments, the CBR-IAs have excellent population diversity and fast convergence which are necessary for dynamic problems with jobs arriving and leaving continually. The results with dy-namic scheduling problems further confirm the CBR-IAs effectiveness as a problem solving method with knowledge reuse. 展开更多
关键词 case-based reasoning immune algorithm 2-level similarity machine learning dynamic job-shop scheduling
原文传递
The Dynamic Scheduling Model of Battlefield Rush-Repair Tasks
19
作者 陈伟龙 陈春良 +2 位作者 刘彦 昝翔 刘大可 《Journal of Shanghai Jiaotong university(Science)》 EI 2016年第6期744-749,共6页
During the war,equipment is constantly being damaged with limited battlefield rush-repair time and power.Therefore,some military problems are presented in this paper.In order to get more fighting time for damaged equi... During the war,equipment is constantly being damaged with limited battlefield rush-repair time and power.Therefore,some military problems are presented in this paper.In order to get more fighting time for damaged equipment to participate in operation again as much as possible,three problems should be considered properly.The first problem is how to dynamically choose the most suitable damaged equipment for each repair group.The second one is how to divide tasks between different groups.The third one is how to determine execution sequence in the same group.A mathematical model is established to solve the dynamic battlefield rushrepair task scheduling problem(DBRTSP) in wartime.A variant genetic algorithm is designed to dynamically track the change of the optimal solution.A scheduling example is solved through Matlab.Results show that the proposed model is not only scientific and reasonable,but also convenient and efficient. 展开更多
关键词 rush-repair task dynamic scheduling genetic algorithm
原文传递
Dynamic task scheduling modeling in unstructured heterogeneous multiprocessor systems
20
作者 Hamid TABATABAEE Mohammad Reza AKBARZADEH-T Naser PARIZ 《Journal of Zhejiang University-Science C(Computers and Electronics)》 SCIE EI 2014年第6期423-434,共12页
An algorithm is proposed for scheduling dependent tasks in time-varying heterogeneous multiprocessor systems, in which computational power and links between processors are allowed to change over time. Link contention ... An algorithm is proposed for scheduling dependent tasks in time-varying heterogeneous multiprocessor systems, in which computational power and links between processors are allowed to change over time. Link contention is considered in the multiprocessor scheduling problem. A linear switching-state space-modeling paradigm is introduced to enable theoretical analysis from a system engineering perspective. Theoretical analysis of this model shows its robustness against changes in processing power and link failure. The proposed algorithm uses a fuzzy decision-making procedure to handle changes in the multiprocessor system. The efficiency of the proposed algorithm is illustrated by several random experiments and comparison against a recent benchmark approach. The results show up to 18% average improvement in makespan, especially for larger scale systems. 展开更多
关键词 dynamic task scheduling Fuzzy logic Genetic algorithms Unstructured environment Linear switching state space
原文传递
上一页 1 2 下一页 到第
使用帮助 返回顶部