The simulation of a control system for the longitudinal axis of the rotary or fixed-wing unmanned aerial vehicles(UAVs)is demonstrated in this study.The control unit includes design considerations of two controllers t...The simulation of a control system for the longitudinal axis of the rotary or fixed-wing unmanned aerial vehicles(UAVs)is demonstrated in this study.The control unit includes design considerations of two controllers to provide robust stability,tracking of the proposed linear dynamics,an adequate set of proportional-integral-derivative(PID)controller gains,and a minimal cost function.The PID control and linear quadratic regulator(LQR)with or without full-state-observer were evaluated.An optimal control system is assumed to provide fast rise and settling time,minimize overshoot,and eliminate the steady-state error.The effectiveness of this approach was verified by a linear model of the UAV aircraft in the semi-dynamic simulation platform of Matlab/Simulink,in which the open-loop system was assessed in terms of flight robustness and reference tracking.The experimental results show that the proposed controllers effectively improve the configuration of the control system of the plant,maintain the sustainability of the dynamic flight model stability,and diminish the flight controller errors.The LQR provides robust stability,but it is not optimal in the transient phase of particular plant output.The PID control system can adjust the controller’s gains for optimal hovering(or stable slow flight)and is especially useful for the tracking system.Finally,comparing aircraft stability using PID and LQR controllers shows that the latter has less overshoot and a shorter settling time;in addition,all proposed controllers can be practically deployed as one UAV’s system,which can be handled as an exemplary model of the UAV flight management system.展开更多
As a hot topic in Landscape Ecology study,ecological connectivity is an important indicator for regional land sustainable use and biological protection. This paper conducted a systematic assessment of ecological conne...As a hot topic in Landscape Ecology study,ecological connectivity is an important indicator for regional land sustainable use and biological protection. This paper conducted a systematic assessment of ecological connectivity using remote sensing images of Dongshan Island in 1994, 2003 and2011. Based on least-cost modelling, the method takes into consideration the type of barrier, the distance impact, and the adjacent land use types to obtain the Barrier Effect Index(BEI) and Ecological Connectivity Index(ECI). The application of this method to Dongshan Island showed the ecological connectivity index(ECI) was low in 1994, improved in 2003, and decreased significantly in 2011. The results of the dynamic analysis of landscape structure showed farmland and roads were the main landscape classes that caused the low observed ECI in 1994 and 2003;these tended to divide the landscape and cause fragmentation. Construction land and roads were the main landscape classes resulting in low ECI in 2011,while forest and grassland had a high ECI. Trajectory analysis showed ECI tended to decrease in the low mountain forest zone of the northwestern and southeastern parts of Dongshan Island as well as in the coastal protection forest area. The areas where ECI became high were located in the northeastern part of Dongshan Island where cities and towns are concentrated with high human populations.Therefore, rapid urbanization has been the most important factor driving changes in landscape structure and patterns during the last 17 years on Dongshan Island. The approach not only assists us in revealing the driving mechanism of landscape dynamics from another aspect, but also can assess the impacts of regional and urban plans on landscape structure and function.展开更多
The identification and selection of performance measures play an important role in any decision making process. Additionally, millions of dollars are spent on appropriate planning and identification of prospective pro...The identification and selection of performance measures play an important role in any decision making process. Additionally, millions of dollars are spent on appropriate planning and identification of prospective projects for improvements. As a result, current practitioners spend a lot of time and money in prioritizing their limited resources. This research proposes two tasks: 1) estimation of performance measures using a simulation based on dynamic traffic assignment model, and 2) development of a methodology to evaluate multiple projects based on benefit-cost analysis. The model, DynusT, is used for the Las Vegas roadway network during the morning peak time period. A comparative analysis of the results from proposed methodology with existing California Benefit-Cost (Cal-B/C) models is presented. The results indicate that the new methodology provides an accurate benefit-cost ratio of the projects. In addition, it signifies that the existing Cal-B/C models underestimate the benefits associated with the prospective project improvements. The major contribution of this research is the simultaneous estimation of the performance measures and development of a methodology to evaluate multiple projects. This is helpful to decision makers to rank and prioritize future projects in a cost-effective manner. Planning and operational policies for the transportation systems can be developed based on the gained insights from this study.展开更多
文摘The simulation of a control system for the longitudinal axis of the rotary or fixed-wing unmanned aerial vehicles(UAVs)is demonstrated in this study.The control unit includes design considerations of two controllers to provide robust stability,tracking of the proposed linear dynamics,an adequate set of proportional-integral-derivative(PID)controller gains,and a minimal cost function.The PID control and linear quadratic regulator(LQR)with or without full-state-observer were evaluated.An optimal control system is assumed to provide fast rise and settling time,minimize overshoot,and eliminate the steady-state error.The effectiveness of this approach was verified by a linear model of the UAV aircraft in the semi-dynamic simulation platform of Matlab/Simulink,in which the open-loop system was assessed in terms of flight robustness and reference tracking.The experimental results show that the proposed controllers effectively improve the configuration of the control system of the plant,maintain the sustainability of the dynamic flight model stability,and diminish the flight controller errors.The LQR provides robust stability,but it is not optimal in the transient phase of particular plant output.The PID control system can adjust the controller’s gains for optimal hovering(or stable slow flight)and is especially useful for the tracking system.Finally,comparing aircraft stability using PID and LQR controllers shows that the latter has less overshoot and a shorter settling time;in addition,all proposed controllers can be practically deployed as one UAV’s system,which can be handled as an exemplary model of the UAV flight management system.
基金supported by the National Natural Science Foundation of China(Grant Nos.31200365,31370624,and 41301203)the Youth Science Fund of the Forestry College of Fujian Agriculture and Forestry University(Grant No.6112C039V)
文摘As a hot topic in Landscape Ecology study,ecological connectivity is an important indicator for regional land sustainable use and biological protection. This paper conducted a systematic assessment of ecological connectivity using remote sensing images of Dongshan Island in 1994, 2003 and2011. Based on least-cost modelling, the method takes into consideration the type of barrier, the distance impact, and the adjacent land use types to obtain the Barrier Effect Index(BEI) and Ecological Connectivity Index(ECI). The application of this method to Dongshan Island showed the ecological connectivity index(ECI) was low in 1994, improved in 2003, and decreased significantly in 2011. The results of the dynamic analysis of landscape structure showed farmland and roads were the main landscape classes that caused the low observed ECI in 1994 and 2003;these tended to divide the landscape and cause fragmentation. Construction land and roads were the main landscape classes resulting in low ECI in 2011,while forest and grassland had a high ECI. Trajectory analysis showed ECI tended to decrease in the low mountain forest zone of the northwestern and southeastern parts of Dongshan Island as well as in the coastal protection forest area. The areas where ECI became high were located in the northeastern part of Dongshan Island where cities and towns are concentrated with high human populations.Therefore, rapid urbanization has been the most important factor driving changes in landscape structure and patterns during the last 17 years on Dongshan Island. The approach not only assists us in revealing the driving mechanism of landscape dynamics from another aspect, but also can assess the impacts of regional and urban plans on landscape structure and function.
文摘The identification and selection of performance measures play an important role in any decision making process. Additionally, millions of dollars are spent on appropriate planning and identification of prospective projects for improvements. As a result, current practitioners spend a lot of time and money in prioritizing their limited resources. This research proposes two tasks: 1) estimation of performance measures using a simulation based on dynamic traffic assignment model, and 2) development of a methodology to evaluate multiple projects based on benefit-cost analysis. The model, DynusT, is used for the Las Vegas roadway network during the morning peak time period. A comparative analysis of the results from proposed methodology with existing California Benefit-Cost (Cal-B/C) models is presented. The results indicate that the new methodology provides an accurate benefit-cost ratio of the projects. In addition, it signifies that the existing Cal-B/C models underestimate the benefits associated with the prospective project improvements. The major contribution of this research is the simultaneous estimation of the performance measures and development of a methodology to evaluate multiple projects. This is helpful to decision makers to rank and prioritize future projects in a cost-effective manner. Planning and operational policies for the transportation systems can be developed based on the gained insights from this study.