The public procurement system in Bangladesh has been running by traditional manual process under the flagship of Public Procurement Act (PPA 2006) and Public Procurement Rules (PPR 2008). Public procurement agencies h...The public procurement system in Bangladesh has been running by traditional manual process under the flagship of Public Procurement Act (PPA 2006) and Public Procurement Rules (PPR 2008). Public procurement agencies have been facing challenges in this manual tendering system. To overcome this problem and to bring reality to the “Digital Bangladesh” slogan, the Government of Bangladesh introduced the e-Procurement system under the e-GP (Electronic Government Procurement) guideline 2011. After the inception of e-procurement, there is no e-procurement assessment model to improve the e-GP system. The purpose of this research is to develop a conceptual framework and to design an e-procurement assessment model. With this view, we have considered one of the biggest entity Roads and Highways Department (RHD) of the Government of Bangladesh, for field study. Mixed methods along with FGD (Focus Group Discussion), KII (Key Informant Interview), and survey questionnaires are used to collect data from RHD, and then Statistical Package for Social Science (SPSS) software is used for regression analysis and hypothesis testing to develop the e-Procurement assessment model. The novel contribution of the study lies in the test of the hypothesis that focuses on developing the conceptual model of the e-procurement assessment system in Bangladesh. Findings of the study are essential for all Procurement Entity (PE) and suppliers <i>i.e. </i> contractors of RHD who are engaged in the construction of the infrastructure project development project.展开更多
In Bangladesh, both manual and e-GP system is used to perform public procurement. Before tender publication, tender documents have to be prepared by the Procurement Entities (PEs). The problem is that the manual tende...In Bangladesh, both manual and e-GP system is used to perform public procurement. Before tender publication, tender documents have to be prepared by the Procurement Entities (PEs). The problem is that the manual tendering system involves more cost and time in preparing tender documents. The study’s purpose is to compare now the efficiency of tender document preparation in the manual system with the e-GP system. This study tests the cost and time involved in tender document preparation, both manual and e-procurement tenders. Sample data was collected from the 11 RHD zones. Structured survey questionnaires were used to collect primary data from the PE officers of RHD. A hypothesis test was performed using the model of independent samples t-test. The test results indicated that e-Procurement tender document preparation costs and time were less than manual tendering. Academicians, researchers, PE officers, and policymakers will benefit from the study’s conclusions.展开更多
文摘The public procurement system in Bangladesh has been running by traditional manual process under the flagship of Public Procurement Act (PPA 2006) and Public Procurement Rules (PPR 2008). Public procurement agencies have been facing challenges in this manual tendering system. To overcome this problem and to bring reality to the “Digital Bangladesh” slogan, the Government of Bangladesh introduced the e-Procurement system under the e-GP (Electronic Government Procurement) guideline 2011. After the inception of e-procurement, there is no e-procurement assessment model to improve the e-GP system. The purpose of this research is to develop a conceptual framework and to design an e-procurement assessment model. With this view, we have considered one of the biggest entity Roads and Highways Department (RHD) of the Government of Bangladesh, for field study. Mixed methods along with FGD (Focus Group Discussion), KII (Key Informant Interview), and survey questionnaires are used to collect data from RHD, and then Statistical Package for Social Science (SPSS) software is used for regression analysis and hypothesis testing to develop the e-Procurement assessment model. The novel contribution of the study lies in the test of the hypothesis that focuses on developing the conceptual model of the e-procurement assessment system in Bangladesh. Findings of the study are essential for all Procurement Entity (PE) and suppliers <i>i.e. </i> contractors of RHD who are engaged in the construction of the infrastructure project development project.
文摘In Bangladesh, both manual and e-GP system is used to perform public procurement. Before tender publication, tender documents have to be prepared by the Procurement Entities (PEs). The problem is that the manual tendering system involves more cost and time in preparing tender documents. The study’s purpose is to compare now the efficiency of tender document preparation in the manual system with the e-GP system. This study tests the cost and time involved in tender document preparation, both manual and e-procurement tenders. Sample data was collected from the 11 RHD zones. Structured survey questionnaires were used to collect primary data from the PE officers of RHD. A hypothesis test was performed using the model of independent samples t-test. The test results indicated that e-Procurement tender document preparation costs and time were less than manual tendering. Academicians, researchers, PE officers, and policymakers will benefit from the study’s conclusions.