Application Research of Earned Value Management in New Drug Research and Development Projects
1
作者 Wang Wanting Xing Hua 《Asian Journal of Social Pharmacy》 2020年第1期16-21,共6页
Objective To help investors assess and control the costs of new drug development and reduce the risks of new drug development projects.Methods Cost analysis and financial forecasting were carried out with the integrat... Objective To help investors assess and control the costs of new drug development and reduce the risks of new drug development projects.Methods Cost analysis and financial forecasting were carried out with the integrated approach of earned value management.According to the principle of earned value management deviation analysis,the basic process of the new drug research and development project was combined with the hypothesis method from the research of Tufts Drug Development Research Center.Results and Conclusion If the project progress check was carried out in the clinical trial,the project costs were found overspent,the efficiency was low,the project progress was faster,and the resource investment was ahead.It is recommended that the adjustment should be made to reduce the input of resources,and increase the efficient key personnel to take the place of some less efficient staff. 展开更多
关键词 new drug research and development earned value management cost analysis
下载PDF
Stochastic Earned Duration Analysis for Project Schedule Management
2
作者 Fernando Acebes David Poza +1 位作者 JoséManuel González-Varona Adolfo López-Paredes 《Engineering》 SCIE EI 2022年第2期148-161,共14页
Earned duration management(EDM)is a methodology for project schedule management(PSM)that can be considered an alternative to earned value management(EVM).EDM provides an estimation of devia-tions in schedule and a fin... Earned duration management(EDM)is a methodology for project schedule management(PSM)that can be considered an alternative to earned value management(EVM).EDM provides an estimation of devia-tions in schedule and a final project duration estimation.There is a key difference between EDM and EVM:In EDM,the value of activities is expressed as work periods;whereas in EVM,value is expressed in terms of cost.In this paper,we present how EDM can be applied to monitor and control stochastic pro-jects.To explain the methodology,we use a real case study with a project that presents a high level of uncertainty and activities with random durations.We analyze the usability of this approach according to the activities network topology and compare the EVM and earned schedule methodology(ESM)for PSM. 展开更多
关键词 earned duration management earned value management Stochastic project control Duration forecasting UNCERTAINTY
下载PDF
A Study of Quantitative Progress Evaluation Models for Open Source Projects
3
作者 Hironobu Sone Yoshinobu Tamura Shigeru Yamada 《Journal of Software Engineering and Applications》 2022年第5期183-196,共14页
Open source software (OSS) has become an indispensable part of society, not only for personal use but also for corporate use. Projects developed and operated by OSS are called open source projects, and the number of s... Open source software (OSS) has become an indispensable part of society, not only for personal use but also for corporate use. Projects developed and operated by OSS are called open source projects, and the number of such projects is increasing. On the other hand, because anyone can participate in an open source project, the progress of the project is uncertain due to differences in project members’ skills, development environments, and time zones of activity. Therefore, many users and companies need to understand the development and operation status of open source project. Then, the developers carefully make decisions on upgrading or installing new OSS. In this paper, we focus on the maintenance effort estimation for open source projects considering uncertainty. Also, we evaluate the project quantitatively using Earned Value Management (EVM). Moreover, we examine the appropriateness of the model for predicting the maintenance effort expeditures. Furthermore, we discuss the appropriateness of this EVM method. 展开更多
关键词 Open Source Software Stochastic Differential Equation earned value management Software Reliability Growth Model
下载PDF
Development of a BIM-based production planning and control system for Lean Construction through advancement and integration of existing management techniques 被引量:1
4
作者 Christoph Paul SCHIMANSKI Gabriele PASETTI MONIZZA +1 位作者 Carmen MARCHER Dominik T.MATT 《Frontiers of Engineering Management》 2021年第3期429-441,共13页
As part of general construction management,production planning and control is vital for successful project delivery.Numerous approaches supporting production planning and control exist in practice and research.However... As part of general construction management,production planning and control is vital for successful project delivery.Numerous approaches supporting production planning and control exist in practice and research.However,the different approaches focus on distinct areas such as workflow stabilization or cost control,and no single system combines all the requirements of a holistic production management system.Varying production management systems can be explained by the unique characteristics of many construction projects.As an approach for the digital twinning in the construction industry,building information modeling(BIM)can help standardize production management through shifting the management system design toward the digital prototype.Previous scientific work has acknowledged this approach,thereby generating numerous concepts for using building information models within construction management approaches.However,BIM is often merely used as a parallel support rather than as an integral part of production management systems.To address this gap and in terms of research methodology,we follow a Design Science Research approach.Thus,we propose a new BIM-based production management system,which is characterized by a theoretical integration model for BIM and existing construction management techniques,and a methodology for applying these concepts in practice. 展开更多
关键词 production management system design Industry 4.0 Last Planner System KANBAN earned value management
原文传递
PROJECT REGULARITY: DEVELOPMENT AND EVALUATION OF A NEW PROJECT CHARACTERISTIC 被引量:2
5
作者 Jordy Batselier Mario Vanhoucke 《Journal of Systems Science and Systems Engineering》 SCIE EI CSCD 2017年第1期100-120,共21页
The ability to accurately characterize projects novel project characteristic is developed characteristic, called project regularity, is essential to good project management. Therefore, a reflects the value accrue with... The ability to accurately characterize projects novel project characteristic is developed characteristic, called project regularity, is essential to good project management. Therefore, a reflects the value accrue within a project. This expressed in terms of the newly introduced regular/irregular-indicator RI. The widely accepted management system of earned value management (EVM) forms the basis for evaluation of the new characteristic. More concretely, the influence of project regularity on EVMforecasting accuracy is assessed, and is shown to be significant for both time and cost forecasting. Moreover, this effect appears to be stronger than that of the widely used characteristic of project seriality expressed by the serial/parallel-indicator SP. Therefore, project regularity could also be useful as an input parameter for project network generators. Furthermore, the introduction of project regularity can provide project managers with a more accurate indication of the time and cost forecasting accuracy that is to be expected for a certain project and, correspondingly, of how a project should be built up in order to obtain more reliable forecasts during project control. 展开更多
关键词 Project management earned value management time and cost forecasting empirical database Monte Carlo simulation project control system
原文传递