期刊文献+
共找到233篇文章
< 1 2 12 >
每页显示 20 50 100
Optimization of Dead Load State in Earth-Anchored Cable-Stayed Bridges 被引量:4
1
作者 Bin Sun Rucheng Xiao 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2015年第3期87-94,共8页
In order to determine the reasonable completed dead load state in earth-anchored cable-stayed bridges,a practical method is proposed. The method is based on the rigidly supported continuous beam method and the feasibl... In order to determine the reasonable completed dead load state in earth-anchored cable-stayed bridges,a practical method is proposed. The method is based on the rigidly supported continuous beam method and the feasible zone method,emphasizing on the mutual effect between the self-anchored structural parts and the earth-anchored ones. Three cable-stayed bridge models are designed with the main spans of 1 400 m,including a partially earth-anchored cable-stayed bridge,a cable-stayed-suspension bridge and a fully selfanchored cable-stayed bridge,in which the C50 concrete and Q345 steel are adopted. The partially earthanchored cable-stayed bridge and the cable-stayed-suspension bridge secure lower compressive force in the girder than the fully self-anchored cable-stayed bridge by 25 percent at least. The same is for the material consumption of the whole bridge. Furthermore,the anchor volume is more than 20% lower in the partially earthanchored cable-stayed bridge than that in the cable-stayed-suspension bridge. Consequently,the practical span of cable-stayed bridges can be accordingly extended. 展开更多
关键词 CABLE-STAYED BRIDGE partially earth-anchored CABLE-STAYED BRIDGE cable-stayed-suspension BRIDGE REASONABLE completed dead load STATE
下载PDF
一种新型大直径多盘土锚承载力数值模拟分析 被引量:1
2
作者 夏红兵 王佳威 《黑龙江工业学院学报(综合版)》 2024年第1期130-136,共7页
新型大直径多盘土锚是采用专业扩孔成盘装置进行多次扩孔,形成多个空腔,在钻孔中放入带有对中支架的钢绞线,灌注水泥砂浆,固化后得到的。为研究该土锚抗拔特性,将等直径土锚作为对照组,运用FLAC3D软件对其在不同荷载作用下的极限抗拔承... 新型大直径多盘土锚是采用专业扩孔成盘装置进行多次扩孔,形成多个空腔,在钻孔中放入带有对中支架的钢绞线,灌注水泥砂浆,固化后得到的。为研究该土锚抗拔特性,将等直径土锚作为对照组,运用FLAC3D软件对其在不同荷载作用下的极限抗拔承载力、竖向位移、轴力、锚盘承担荷载和侧摩阻力等方面进行数值模拟分析。结果表明:相同条件下,新型大直径多盘土锚的极限抗拔承载力相较于等直径土锚提高了50%;达到各自极限抗拔承载力时,新型大直径多盘土锚的竖向位移相较于等直径土锚减少了24.22%;新型大直径多盘土锚的侧摩阻力较小且增速较慢,达到极限抗拔承载力时,锚盘分担荷载占施加总荷载的32.094%。 展开更多
关键词 新型大直径多盘土锚 承载力 FLAC3D 位移 侧摩阻力
下载PDF
丹江口水库特大桥钢-混凝土组合围堰施工技术
3
作者 于得安 姜永生 +1 位作者 周范武 高海涛 《桥梁建设》 EI CSCD 北大核心 2024年第3期135-141,共7页
丹江口水库特大桥为主跨760 m双塔双索面部分地锚式混合梁斜拉桥,主墩采用整体式承台+大直径群桩基础,主墩承台平面为八边形,尺寸为48 m(横桥向)×26 m(顺桥向)×6.5 m(高),承台底部设置26根直径2.8 m钻孔灌注桩。为适应库区倾... 丹江口水库特大桥为主跨760 m双塔双索面部分地锚式混合梁斜拉桥,主墩采用整体式承台+大直径群桩基础,主墩承台平面为八边形,尺寸为48 m(横桥向)×26 m(顺桥向)×6.5 m(高),承台底部设置26根直径2.8 m钻孔灌注桩。为适应库区倾斜裸岩地形,降低施工难度及施工费用,主墩围堰采用下部混凝土挡墙围堰+上部单壁钢围堰的钢-混凝土组合围堰方案。下部混凝土挡墙围堰采用衡重式挡墙围堰及抗滑桩挡墙围堰,高3~11 m;上部单壁钢围堰分块设置,其长度与下部挡墙围堰匹配,高8 m。钢-混凝土组合围堰施工时,首先根据地形条件进行挡墙围堰分段,之后采用破碎锤开挖混凝土挡墙围堰基础;混凝土挡墙围堰采用分层、分块施工,顶部圈梁与挡墙围堰同步浇筑;上部单壁钢围堰采用加工厂预制+现场分块安装,并预留竖向型钢接长部分;最后进行单壁钢围堰底部及组合围堰山体连接处止水混凝土施工,完成钢-混凝土组合围堰施工。钢-混凝土组合围堰的应用,有效缩短了基础施工周期,降低了围堰施工难度及施工费用,经济合理,满足现场施工各项要求。 展开更多
关键词 部分地锚式斜拉桥 倾斜裸岩 钢-混凝土组合围堰 混凝土挡墙围堰 单壁钢围堰 施工技术
下载PDF
基于FLAC^(3D)下新型多盘土锚抗拔承载力分析
4
作者 华京 夏红兵 《佳木斯大学学报(自然科学版)》 CAS 2024年第7期89-93,共5页
新型多盘土锚是采用新型偏心块旋转挤土扩孔装置进行多次扩孔,在地下结构中生成空腔,在预先钻成的孔中置入钢绞线,注入水泥砂浆,待水泥砂浆硬化得到。为研究该土锚抗拔特性,将等直径土锚作为对照组,运用FLAC^(3D)软件生成所需模型,随后... 新型多盘土锚是采用新型偏心块旋转挤土扩孔装置进行多次扩孔,在地下结构中生成空腔,在预先钻成的孔中置入钢绞线,注入水泥砂浆,待水泥砂浆硬化得到。为研究该土锚抗拔特性,将等直径土锚作为对照组,运用FLAC^(3D)软件生成所需模型,随后对模型在不同拉力下的荷载与位移关系、荷载与轴力、荷载与锚盘承担荷载、荷载与侧摩阻力的关系进行分析。结果表明:相同大小、相同位置的荷载,在新型多盘土锚的极限抗拔承载力对比等直径土锚的极限抗拔承载力拉高了100%,新型多盘土锚的竖向位移小于等直径土锚的竖向位移。新型多盘土锚在达到极限抗拔力时,锚盘所承担的荷载达到了总荷载的36.576%。 展开更多
关键词 新型多盘土锚 承载力 FLAC^(3D) 位移 侧摩阻力
下载PDF
丹江口水库特大桥施工关键技术
5
作者 唐守峰 吴学伟 +2 位作者 阳晏 沈峰 胡龙泳 《桥梁建设》 EI CSCD 北大核心 2024年第2期8-15,共8页
十淅高速丹江口水库特大桥为主跨760 m的双塔双索面部分地锚式混合梁斜拉桥。主墩采用群桩基础、八边形承台;桥塔采用H形混凝土结构;地锚式桥台采用箱形预应力混凝土结构;主梁采用混合梁,边跨为双边主肋预应力混凝土梁,主跨为钢-UHPC组... 十淅高速丹江口水库特大桥为主跨760 m的双塔双索面部分地锚式混合梁斜拉桥。主墩采用群桩基础、八边形承台;桥塔采用H形混凝土结构;地锚式桥台采用箱形预应力混凝土结构;主梁采用混合梁,边跨为双边主肋预应力混凝土梁,主跨为钢-UHPC组合梁,主跨跨中设置中央无轴力连接装置+伸缩缝构造。针对该桥结构特点及水文条件,主墩桩基础和承台采用衡重式挡墙+单壁钢围堰方案,变水中施工为陆地施工,节约了工期和投资;塔柱采用液压爬模分节施工,中塔柱内倾塔肢间设2道水平横撑,保证了施工期塔柱受力和线形;地锚式桥台采用分块、分层并设后浇带的方案,有效改善了大体积混凝土的抗裂性能;边跨混凝土梁采用搭设钢管支架分段现浇施工;主跨钢主梁采取工厂化块件制造,库区陆地总拼并浇筑UHPC形成组合梁,再水运至桥位,采用桥面吊机悬臂吊装,现场施工湿接缝,解决了汉江上游航运能力不足的问题,同时创新提出并应用了钢-UHPC组合梁安装五步施工法,提高了主梁安装质量;中央无轴力连接装置采用逐缝合龙法高精度合龙方案,有效保证了结构功能的发挥。 展开更多
关键词 部分地锚式斜拉桥 钢-UHPC组合梁 衡重式挡墙+单壁钢围堰 地锚式桥台 中央无轴力连接装置 施工技术
下载PDF
丹江口水库特大桥跨中无轴力连接装置施工关键技术
6
作者 刘朝辉 周范武 +1 位作者 于得安 高海涛 《世界桥梁》 北大核心 2024年第3期36-41,共6页
丹江口水库特大桥为主跨760 m的双塔双索面部分地锚式混合梁斜拉桥,边中跨比为0.2,采用梁塔分离、梁台固结的结构体系。根据主桥结构体系受力需要,主梁在跨中位置断开,设置跨中无轴力连接装置+伸缩装置构造。无轴力连接装置由导梁、外... 丹江口水库特大桥为主跨760 m的双塔双索面部分地锚式混合梁斜拉桥,边中跨比为0.2,采用梁塔分离、梁台固结的结构体系。根据主桥结构体系受力需要,主梁在跨中位置断开,设置跨中无轴力连接装置+伸缩装置构造。无轴力连接装置由导梁、外部大箱梁(H梁段和H′梁段)、竖向及横向支座系统组成,导梁长13.68 m。无轴力连接装置现场安装采用导梁跨中分段(2×6.84 m)拼装、外部大箱梁逐缝合龙的施工方法。首先在总拼场地进行无轴力连接装置工厂化预拼装,并安装竖向及横向支座系统,拼装完成后将导梁断开,回位至H梁段和H′梁段进行转运;然后现场吊装匹配连接H梁段,并将H梁段内部导梁向岸侧拖动固定;之后起吊H′梁段并与前置G梁段软连接;再进行H梁段和H′梁段导梁匹配连接;导梁匹配连接完成后进行H′梁段匹配连接;最后进行斜拉索放张、桥面吊机拆除。 展开更多
关键词 部分地锚式斜拉桥 无轴力连接装置 导梁 外部大箱梁 分段拼装 逐缝合龙 施工技术
下载PDF
非饱和边坡中锚托板锚固尺寸的新算法
7
作者 彭俊国 黄宇豪 《岩土力学》 EI CAS CSCD 北大核心 2024年第4期1003-1013,1025,共12页
锚托板支护结构因为其安全稳定、经济和安装简便等优点在填方加固边坡中得到推广应用。然而目前在锚托板支护结构设计过程中,锚托板尺寸仍没有成熟的计算方法,设计过于保守。利用对数螺旋线滑移面结合极限平衡法计算得到非饱和土的主动... 锚托板支护结构因为其安全稳定、经济和安装简便等优点在填方加固边坡中得到推广应用。然而目前在锚托板支护结构设计过程中,锚托板尺寸仍没有成熟的计算方法,设计过于保守。利用对数螺旋线滑移面结合极限平衡法计算得到非饱和土的主动土压力。根据土体内部平衡求出每层锚托板所需承担的拉力,得到了锚托板尺寸的计算方法,根据滑移面的位置得到了锚托板自由段拉杆的最小设计长度。将主动土压力计算结果与现有的经典文献进行了对比分析,发现主动土压力系数变化趋势与现有结论一致。分析了降雨工况和地震工况对锚托板尺寸的影响,结果表明,在降雨强度较小时对锚托板锚固尺寸的影响可以忽略,但在同时考虑强降雨和地震时,会显著增加所需的锚托板锚固尺寸,最大增大幅度可达136.71%。分析结果可为锚托板锚固尺寸的设计提供参考。 展开更多
关键词 锚托板 非饱和土 主动土压力 降雨 地震
下载PDF
复杂环境下基坑加固补强设计与施工
8
作者 陈治法 杨帆 +5 位作者 张训玉 刘磊 李竞 王章永 孙亮 蒋俊良 《地质装备》 2024年第2期44-48,共5页
作者以北京市通州区运河核心区某项目为实例,探讨相邻基坑超过原基坑使用年限的工况下,对基坑进行加固设计的关键控制点。项目7号地块基坑深度14.75 m,基坑周边环境复杂,目前已超期服役三年多。基坑东侧为8号地块基坑,基坑深度为21.90 m... 作者以北京市通州区运河核心区某项目为实例,探讨相邻基坑超过原基坑使用年限的工况下,对基坑进行加固设计的关键控制点。项目7号地块基坑深度14.75 m,基坑周边环境复杂,目前已超期服役三年多。基坑东侧为8号地块基坑,基坑深度为21.90 m,两个基坑之间为地下连接通道。为保证地下连接通道的顺利实施及基坑的稳定性,须制定补强设计方案。项目实施过程中对基坑进行了全过程监测,监测结果表明,在此类复杂环境下采用回填加固+补打预应力锚杆的方案是安全可行的,可供类似超期服役基坑的加固提供参考和借鉴。 展开更多
关键词 复杂环境 深基坑 补强支护 堆土反压 补强锚杆
下载PDF
Experimental evaluation of mechanically stabilized earth walls with recycled crumb rubbers 被引量:9
9
作者 Matin Jalali Moghadam Amirali Zad +1 位作者 Nima Mehrannia Nader Dastaran 《Journal of Rock Mechanics and Geotechnical Engineering》 CSCD 2018年第5期947-957,共11页
Traditional techniques for treatment of waste rubber, such as burning, generate some highly non- degradable synthetic materials that cause unrepairable environmental damages by releasing heavy metals, such as arsenic,... Traditional techniques for treatment of waste rubber, such as burning, generate some highly non- degradable synthetic materials that cause unrepairable environmental damages by releasing heavy metals, such as arsenic, chromium, lead, manganese and nickel. For this, scrap tires are used as light- weight alternative materials in many engineering applications, such as retaining wall backfilling. In the present study, 90 laboratory models were prepared to evaluate the stability of mechanically stabilized earth (MSE) walls with plate anchors. Then, the bearing capacity and horizontal displacements of the retaining walls were monitored by exerting a static loading to investigate the effects of adding different contents (5 wt%, 10 wt%, 15 wt% and 20 wt%) of recycled crumb rubber (RCR) to the fill of a mechanically stabilized retaining wall with plate anchors. To visualize the critical slip surface of the wall, the particle image velocimetry (PIV) technique was employed. Results showed that the circular anchor plates almost continually provided a higher bearing capacity and wall stability than the square plates. Moreover, the backfill with 15 wt% RCR provided the maximum bearing capacity of the wall. Increasing the weight percentage of RCR to 20 wt% resulted in a significant reduction in horizontal displacement of the wall, which occurred due to the decrease in lateral earth pressure against the whole walls. An increase in RCR content resulted in the decrease in the formation of failure wedge and the expansion of the wall slip surface, and the failure wedge did not form in the sand mixtures with 15 wt% and 20 wt% RCRs. 展开更多
关键词 Mechanically stabilized earth (MSE) wall Plate anchor Recycled crumb rubber (RCR) Particle image velocimetry (PIV)
下载PDF
深基坑双排微型钢管桩支护受力特性原位试验 被引量:5
10
作者 张立 白晓宇 +5 位作者 杲晓东 孙林娜 于风波 刘小良 陈吉光 蒋水兵 《中南大学学报(自然科学版)》 EI CAS CSCD 北大核心 2023年第9期3621-3634,共14页
微型钢管桩现场试验研究较少,这制约了该支护结构在深基坑工程中的推广应用。为获知微型钢管桩受力特性,以青岛地区土岩组合地层某超深基坑工程为依托,对双排微型钢管桩支护结构开展原位试验,分析不同开挖深度下,内排桩和外排桩桩身弯... 微型钢管桩现场试验研究较少,这制约了该支护结构在深基坑工程中的推广应用。为获知微型钢管桩受力特性,以青岛地区土岩组合地层某超深基坑工程为依托,对双排微型钢管桩支护结构开展原位试验,分析不同开挖深度下,内排桩和外排桩桩身弯矩的差异及内排桩桩侧土压力的时变规律。研究结果表明:在第一阶开挖过程中,内排桩弯矩大于外排桩弯矩;开挖面附近1 m深度范围内,内排桩弯矩、外排桩弯矩和内排桩桩侧土压力的增幅较大;开挖至第二、三阶时,内排桩弯矩和外排桩弯矩沿深度方向均呈现“桩顶小、中部大、桩端小”的受力特性,且弯矩接近;桩侧土压力沿深度方向呈现复杂的“波浪形”分布特征,主要由空间土拱效应导致;在整个开挖过程中,桩身弯矩与桩侧土压力随开挖深度增加而增大,土层分布及锚索锁定对桩身内力影响显著,桩身正弯矩和负弯矩的最大值位于土岩结合面;桩侧土压力基本小于朗肯主动土压力,多个开挖深度下实测值近似于理论计算值。 展开更多
关键词 微型钢管桩 深基坑 桩锚支护 土压力 现场试验
下载PDF
地锚式独塔悬索桥非对称主缆合理设计参数计算方法研究 被引量:1
11
作者 林阳 朱玉 《桥梁建设》 EI CSCD 北大核心 2023年第S01期54-61,共8页
为快速拟定地锚式独塔悬索桥非对称主缆的合理设计参数,并估算主缆、锚碇、桥塔等工程量,提出非对称主缆合理设计参数计算方法。该方法基于传统抛物线理论,推导主缆的线形以及拉力近似解,通过比选得到满足工程实际控制因素的设计参数合... 为快速拟定地锚式独塔悬索桥非对称主缆的合理设计参数,并估算主缆、锚碇、桥塔等工程量,提出非对称主缆合理设计参数计算方法。该方法基于传统抛物线理论,推导主缆的线形以及拉力近似解,通过比选得到满足工程实际控制因素的设计参数合理取值区间,确定主缆垂跨比与高跨比,估算主缆设计截面面积。以济新高速黄河三峡大桥--单跨510 m地锚式独塔回转缆钢桁梁悬索桥为背景,采用该方法计算主缆的合理设计参数,最终选择垂跨比为0.0675,高跨比为0.20,主缆截面面积为339024.2 mm 2,与节线法、分段悬链线法进行对比验证,结果表明:该计算方法路径明确,效率高,精度满足拟定方案与初步估算需要,可用于同类型桥梁的设计。 展开更多
关键词 地锚式独塔悬索桥 非对称主缆 传统抛物线理论 设计参数 垂跨比 高跨比
下载PDF
Study on Ultimate Pullout Force of Grouting Anchors of the Anchor-Pull Retaining Wall
12
作者 Hongbo Zhang Yifan Yu +2 位作者 Xiuguang Song Yingyong Li Jianqing Wu 《Journal of Geoscience and Environment Protection》 2014年第5期32-37,共6页
Determination of the grouting anchor pullout force is a key step during the design of anchor-pull retaining wall, but it is mostly determined relied on empirical formula at present, and the rationality and the safety ... Determination of the grouting anchor pullout force is a key step during the design of anchor-pull retaining wall, but it is mostly determined relied on empirical formula at present, and the rationality and the safety cannot be effectively guaranteed. Based on the engineering case of the gravity retaining wall of Qinglin Freeway, the model test was designed, and combined with the results of the ABAQUS finite element numerical analysis, it was analyzed that how the anchor axial pulling force distributes. The results showed that the force of the anchor near the wall bolt was large and which far from the wall was small and the ultimate pullout force was proportional to the length, diameter and shear strength. When the end tension of the anchor was small, the top load played a leading role on the anchor tension. This conclusion confirmed the calculation formula of ultimate pullout force was and provided a theoretical basis for anchor-pull retaining wall design and calculation. 展开更多
关键词 anchor-Pull Retaining Wall ULTIMATE PULLOUT Force Lateral earth Pressure Model Test Numerical Analysis
下载PDF
丹江口水库特大桥地锚式桥台CFRP预应力岩锚施工技术 被引量:2
13
作者 于得安 周范武 高海涛 《桥梁建设》 EI CSCD 北大核心 2023年第3期120-126,共7页
丹江口水库特大桥为主跨760 m双塔双索面部分地锚式混合梁斜拉桥,边中跨比为0.2,边跨端部设置空腔式箱形台身+岩锚的组合式地锚式桥台。为提高地锚式桥台在横桥向不平衡土压力作用下的抗滑稳定性,在1号地锚式桥台台身外侧墙中心线位置布... 丹江口水库特大桥为主跨760 m双塔双索面部分地锚式混合梁斜拉桥,边中跨比为0.2,边跨端部设置空腔式箱形台身+岩锚的组合式地锚式桥台。为提高地锚式桥台在横桥向不平衡土压力作用下的抗滑稳定性,在1号地锚式桥台台身外侧墙中心线位置布置14组(每组2束)高性能竖向CFRP预应力岩锚结构,该岩锚结构由CFRP预应力锚杆和RPC粘结介质构成,分为地上锚固段、自由段和地下锚固段3段。该岩锚结构采用后安装工艺施工,即CFRP预应力锚杆先在工厂加工制作,整体运输至现场后单根整体安装下放。为验证CFRP预应力岩锚结构的可靠性、注浆工艺的可行性,在CFRP预应力岩锚主体结构施工前进行足尺模型工艺试验。工艺试验结果表明:CFRP预应力岩锚结构具有良好的锚固性能及足够的安全储备,注浆工艺可行。地锚式桥台施工时在墙身位置预埋管道,桥台及上部主梁施工后从梁面顶部通过预埋管道进行地下锚固段孔道钻孔施工,清孔后进行CFRP预应力锚杆整体下放安装,之后进行孔道注浆,最后进行CFRP预应力锚杆张拉、封锚,完成岩锚施工。该桥28束CFRP预应力岩锚已施工完成,且岩锚注浆密实,注浆强度满足设计要求。 展开更多
关键词 部分地锚式斜拉桥 地锚式桥台 CFRP预应力岩锚 RPC注浆 整体安装 施工技术
下载PDF
丹江口水库特大桥地锚式桥台施工关键技术 被引量:2
14
作者 周范武 于得安 高海涛 《桥梁建设》 EI CSCD 北大核心 2023年第5期131-137,共7页
丹江口水库特大桥为主跨760 m双塔双索面部分地锚式混合梁斜拉桥,边中跨比为0.2,采用“梁塔分离、梁台固结”的结构体系,在边跨主梁端部设置地锚式桥台作为配重。地锚式桥台采用空腔式箱形台身+岩锚的组合式结构,由底板、墙身(包括前墙... 丹江口水库特大桥为主跨760 m双塔双索面部分地锚式混合梁斜拉桥,边中跨比为0.2,采用“梁塔分离、梁台固结”的结构体系,在边跨主梁端部设置地锚式桥台作为配重。地锚式桥台采用空腔式箱形台身+岩锚的组合式结构,由底板、墙身(包括前墙、后墙、侧墙、隔墙)、盖板和锚台段主梁构成,桥台长45.8 m、宽31.6 m。在地锚式桥台施工中,基坑采用明挖放坡方式开挖,并在开挖后对基底进行浅层平板荷载试验,以确保其地基承载力满足不小于350 kPa设计要求;底板采用分层分块方式施工,并设置2条横向后浇带和智能管冷循环控制系统;墙身采用竖向分层+设置双向后浇带(2条横向后浇带、1条纵向后浇带)的方式施工,并根据分块龄期差采用微膨胀混凝土施工后浇带;墙身施工后,采用传送带在墙身腔室内回填砂石,之后进行盖板与锚台段主梁施工;最后进行地锚式桥台竖向预应力施工,并优化竖向预应力张拉顺序,完成地锚式桥台施工。 展开更多
关键词 部分地锚式斜拉桥 地锚式桥台 基坑开挖 双向后浇带 腔室回填 施工技术
下载PDF
高速铁路隧道超前支护稳定性试验研究 被引量:1
15
作者 王朋 赵彦君 +4 位作者 吴红刚 王豫晋 王江 车志远 李慧慧 《铁道勘察》 2023年第5期124-131,共8页
为研究深埋隧道超前支护的应用效果,依托银兰高铁香山隧道工程,模拟开展隧道三台阶法开挖对比试验,通过分析不同位置土压力变化情况、掌子面变形情况和锚杆微应变峰值变化,研究锚杆支护对于掌子面和围岩稳定性的影响。研究表明:(1)锚杆... 为研究深埋隧道超前支护的应用效果,依托银兰高铁香山隧道工程,模拟开展隧道三台阶法开挖对比试验,通过分析不同位置土压力变化情况、掌子面变形情况和锚杆微应变峰值变化,研究锚杆支护对于掌子面和围岩稳定性的影响。研究表明:(1)锚杆支护对土体变形有很好的限制效果,并且对于竖直方向土体限制要优于水平方向。(2)锚杆支护对于掌子面前方土体的加固限制了上方围岩的变形范围,间接提高了围岩稳定性。(3)锚杆支护后,掌子面最终变形量减少0.92 mm,位移量较未支护减小近50%。(4)掌子面中部位置的锚杆支护效果最优,而上部锚杆变形较大,建议与小导管、管棚等配合使用。研究成果可为隧道施工时对于掌子面锚杆超前支护的稳定性提供理论参考。 展开更多
关键词 银兰高铁 铁路隧道 锚杆支护 模型试验 土压力变化 锚杆应变
下载PDF
桩锚支护结构变形过大原因分析及处理措施
16
作者 肖昌建 张军 《江西建材》 2023年第9期199-201,共3页
文中分析了深圳宝安某项目深基坑支护结构水平位移超过监测控制值的原因,为避免支护结构变形继续发展甚至破坏,结合监测情况及时采取了坑底土体反压、坑外土体孔洞探测、桩后土体注浆加固、局部增设锚索、加强监测等措施,有效避免了支... 文中分析了深圳宝安某项目深基坑支护结构水平位移超过监测控制值的原因,为避免支护结构变形继续发展甚至破坏,结合监测情况及时采取了坑底土体反压、坑外土体孔洞探测、桩后土体注浆加固、局部增设锚索、加强监测等措施,有效避免了支护结构变形继续发展,及时化解了安全风险。 展开更多
关键词 深基坑 桩锚支护结构 变形过大 反压土台 注浆加固 监测
下载PDF
大跨度部分地锚斜拉桥力学分析与参数研究 被引量:17
17
作者 肖汝诚 卫璞 孙斌 《东南大学学报(自然科学版)》 EI CAS CSCD 北大核心 2013年第5期1097-1103,共7页
为分析大跨度部分地锚斜拉桥受力特征,合理确定其设计参数,进行了解析方法研究和参数分析.基于斜拉索面膜化假定,推导了大跨度部分地锚斜拉桥的平衡微分方程,求得其近似解;推导了若干关键力学响应的计算公式,并与有限元计算成果进行了对... 为分析大跨度部分地锚斜拉桥受力特征,合理确定其设计参数,进行了解析方法研究和参数分析.基于斜拉索面膜化假定,推导了大跨度部分地锚斜拉桥的平衡微分方程,求得其近似解;推导了若干关键力学响应的计算公式,并与有限元计算成果进行了对比;通过解析计算公式,对边中跨比、塔梁高跨比、主梁刚度、索塔刚度和地锚锚索支承刚度等参数进行了研究,提出了大跨度部分地锚斜拉桥的若干设计建议.计算结果表明,所推导公式的误差均小于15%,可满足概念设计时的精度要求.参数分析表明,大跨度部分地锚斜拉桥边中跨比可取0.3左右,塔梁高跨比可按传统斜拉桥取值;主梁、索塔自身刚度对结构整体受力影响较小,而地锚索支承刚度影响较大. 展开更多
关键词 大跨度 部分地锚 斜拉桥 解析法 力学分析 参数研究
下载PDF
土对锚拉杆的摩阻力实验研究与分析 被引量:5
18
作者 李珠 王显耀 +1 位作者 梁卫民 朱健 《工程力学》 EI CSCD 北大核心 2000年第1期120-124,共5页
本文对锚拉桥台的锚拉杆进行了长达20小时的现场监测试验。对张拉后锚拉杆的张力随时间、温度的变化规律、土摩阻力的变化及分布规律作了分析与研究。为完善锚拉桥台体系的优化设计及提高工程质量提供了有效的依据。
关键词 摩阻力 锚拉杆 试验研究 张拉力 桥梁 桥台
下载PDF
预应力锚杆柔性支护喷射混凝土面层上的土压力 被引量:7
19
作者 涂兵雄 贾金青 +2 位作者 王海涛 蔡燕燕 俞缙 《岩土力学》 EI CAS CSCD 北大核心 2013年第12期3567-3572,3579,共7页
针对锚喷支护设计中面层土压力计算模式存在的问题,以预应力锚杆柔性支护技术为研究对象,假定锚杆间的土拱为二维平面拱,推导出了一种作用在喷射混凝土面层上的土压力计算方法,得到了面层土压力的分布曲线。分析土体黏聚力c、内摩擦角?... 针对锚喷支护设计中面层土压力计算模式存在的问题,以预应力锚杆柔性支护技术为研究对象,假定锚杆间的土拱为二维平面拱,推导出了一种作用在喷射混凝土面层上的土压力计算方法,得到了面层土压力的分布曲线。分析土体黏聚力c、内摩擦角?、外摩擦角?和锚杆水平间距l对面层土压力的影响,并与简仓法计算结果进行了对比。结果表明,?越小,面层土压力越大,且简仓法计算值明显小于文中计算值;c对面层土压力最大值无影响;面层土压力最大值与l成正比;?对面层土压力也有明显影响,在实际工程设计中,不应忽略?对减小面层土压力的贡献。最后给出了计算面层上的土压力简化公式。 展开更多
关键词 土拱效应 喷射混凝土 土压力 锚杆
下载PDF
部分地锚式斜拉桥合理成桥状态二阶段确定法 被引量:7
20
作者 张力文 夏睿杰 +1 位作者 肖汝诚 孙斌 《深圳大学学报(理工版)》 EI CAS 北大核心 2012年第1期51-55,共5页
研究部分地锚式斜拉桥受力特点及其合理成桥状态的确定原则,提出一种二阶段合理成桥状态下的索力确定方法.该方法采用刚性支承连续梁法确定成桥状态下的索力,并以影响矩阵法进行后续调整.根据该桥型受力特点制定了第2阶段的索力调整流程... 研究部分地锚式斜拉桥受力特点及其合理成桥状态的确定原则,提出一种二阶段合理成桥状态下的索力确定方法.该方法采用刚性支承连续梁法确定成桥状态下的索力,并以影响矩阵法进行后续调整.根据该桥型受力特点制定了第2阶段的索力调整流程,对一座主跨1 218 m的混合梁部分地锚斜拉桥进行了计算.结果表明,按照第2阶段索力调整流程可较快确定出合理成桥状态下的索力. 展开更多
关键词 工程结构 部分地锚式斜拉桥 合理成桥状态 索力优化 桥梁结构设计 叠合梁
下载PDF
上一页 1 2 12 下一页 到第
使用帮助 返回顶部