Effect of Seismic Permanent Deformation on Safety and Stability of Earth-Rock Dam Slope
1
作者 戚蓝 陈启振 蔡建成 《Transactions of Tianjin University》 EI CAS 2015年第2期167-171,共5页
In order to study the effect of seismic permanent deformation on the safety and stability of earth-rock dam, the permanent deformation is considered as the non-design permanent load, and the stress-strain hysteresis c... In order to study the effect of seismic permanent deformation on the safety and stability of earth-rock dam, the permanent deformation is considered as the non-design permanent load, and the stress-strain hysteresis curve is also considered when the earth is under cyclic load. The research work can make the calculation results of plastic collapse more accurate by including the effect of the post-earthquake degree of plastic deformation on the stability of the earth-rock dam, and the dam safety factor decreases from 2.50 to 1.90 after the magnitude-8 earthquake. Moreover, the research work will also improve the design of the earth-rock dam under abnormal operating conditions. 展开更多
关键词 EARTHQUAKE PERMANENT DEFORMATION earth-rock DAM safety FACTOR sensitivity analysis
下载PDF
Dynamic Risk Assessment Index System for Earth-Rock Dam during Construction
2
作者 葛巍 李宗坤 +1 位作者 李巍 赵梦蝶 《Journal of Donghua University(English Edition)》 EI CAS 2015年第6期923-926,共4页
During the construction of earth-rock dam,mutual exclusive construction goals such as quality,safety,progress and cost all have influences on each other,with risk factors being everchanging as the construction progres... During the construction of earth-rock dam,mutual exclusive construction goals such as quality,safety,progress and cost all have influences on each other,with risk factors being everchanging as the construction progresses.Accurate identification of the risk factors,as well as clearing any possible effect that any risk factors might have on the construction project is the key and foundation to our cooperative control of the construction goals.According to the construction planning of earth-rock dam,the hall3 D structure was used to identify the potential changes of risk factors,and the possible means of any risk factors to interfere with the construction goals.The dynamic risk assessment index system is established by deploying the WBS-RBS(work breakdown structurerisk breakdown structure)method,aiming at the construction goals of earth-rock dam.The case study shows that the index system is very effective at risk management of earth-rock dam during construction,and relatively practicable. 展开更多
关键词 hydraulic structure construction of earth-rock dam assessment index risk path construction goal
下载PDF
Study on life-cycle risk management of high earth-rock dam project
3
作者 Zhang Nianmu Zhang Zongliang Yan Lei 《Engineering Sciences》 EI 2013年第5期45-50,共6页
Based on advanced computer technology, internet of things (lOT) technology, project management con- cept and professional technology and combined with the innovative theories, methods and techniques in earlier hy- d... Based on advanced computer technology, internet of things (lOT) technology, project management con- cept and professional technology and combined with the innovative theories, methods and techniques in earlier hy- dropower projects, the life-cycle risk management system of high earth-rock dam project for Nuozhadu project was developed. The system mainly includes digital dam, three-dimensional design, construction quality monito- ring, safety assessment and warning, etc, to integrally manage and analyze the dam design, constructional quality and safety monitoring information. It realized the dynamic updates of the comprehensive information and the safe- ty quality monitoring in the project life cycle, and provided the basic platform for the scientific management of the construction and operation safety of high earth-rock dam. Application in Nuozhadu earth-rock dam showed that construction safety monitoring and warning greatly helped accelerate the construction progress and improve project quality, and provided a new way for the quality safety control of high earth-rock dam. 展开更多
关键词 high earth-rock dam Nuozhadu hydropower station LIFE-CYCLE safety construction risk management
下载PDF
Characteristics and factors that influenced damage to dams in the M_s 8.0 Wenchuan earthquake 被引量:7
4
作者 Jing Liping Liang Haian Li Yongqiang Liu Chunhui 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2011年第3期349-358,共10页
Based on raw data from dams damaged in the Wenchuan earthquake, including many that were severely damaged, characteristics and factors that influenced the damage are discussed in this paper. Findings from this study i... Based on raw data from dams damaged in the Wenchuan earthquake, including many that were severely damaged, characteristics and factors that influenced the damage are discussed in this paper. Findings from this study include: severely damaged dams were densely distributed along the seismologic fault; small dams, especially small earth-rock dams, had the most serious damage that was caused by a variety of factors; the most serious damage was caused by seismic waves; damage was aggregated by aftershocks; and the extent of the damage patterns increased with the seismic intensity. Damage patterns varied in different intensity zones and cracking was the most common type of damage. Most of the dams had a good base with relatively high bearing capacity, and the walls of the earth-rock dams were mostly of clay soil. This type of base and body material mitigated some of the damage to dams. Reservoir maintenance and other factors also have a significant impact on the seismic safety of the dam. Finally, some recommendations to reduce seismic damage to dams are proposed. 展开更多
关键词 seismic damage DAM characteristic of damage to dams influencing factors Wenchuan earthquake seismologic fault earth-rock dams
下载PDF
黄登水电站围堰堰型选择及围堰结构设计 被引量:2
5
作者 刘玲玲 黄雪林 《云南水力发电》 2020年第1期127-131,共5页
黄登水电站采用全年围堰挡水,围堰堰体高度大,达61m;堰基冲积层较深,达30m;围堰挡水历时较长,约3.5a;河谷狭窄且两岸岸坡陡峻。围堰的结构及防渗要求高,施工难度大。经多方案比较论证,采用土工膜心墙联合混凝土防渗墙的土石围堰结构形... 黄登水电站采用全年围堰挡水,围堰堰体高度大,达61m;堰基冲积层较深,达30m;围堰挡水历时较长,约3.5a;河谷狭窄且两岸岸坡陡峻。围堰的结构及防渗要求高,施工难度大。经多方案比较论证,采用土工膜心墙联合混凝土防渗墙的土石围堰结构形式。经2014年5月~2017年底,共历时3.5a的运行检验表明,围堰结构稳定,堰体、堰基渗水量很小,运行安全可靠,保证了大坝基坑的顺利施工。 展开更多
关键词 堰型选择 土石围堰 土工膜 混凝土防渗墙
下载PDF
The construction design and practice of Three Gorges Project 被引量:1
6
作者 Weng Yonghong Xie Xiangrong Fan Wuyi 《Engineering Sciences》 EI 2011年第3期96-103,共8页
The construction of Three Gorges Project (TGP) is characterized by large construction scale,high construction intensity and complexity in technology.In view of various technical difficulties such as navigation in cons... The construction of Three Gorges Project (TGP) is characterized by large construction scale,high construction intensity and complexity in technology.In view of various technical difficulties such as navigation in construction period,two river closures,high-intensity concrete and earth-rock construction,high-intensity construction and demolition of RCC (roller compacted concrete) cofferdam in stage III and immediate navigation of double-line five-step shiplock after impoundment of reservoir,the scheme of river diversion during construction is adopted,namely "diversion in 3 stages,open channel navigation and cofferdam power generation".The practice and innovation achievements in river diversion during construction as well as earth-rock and concrete construction are presented emphatically. 展开更多
关键词 Three Gorges Project CONSTRUCTION DIVERSION earth-rock CONCRETE
下载PDF
Breach mechanism and numerical simulation for seepage failure of earth-rock dams 被引量:8
7
作者 CHEN ShengShui ZHONG QiMing CAO Wei 《Science China(Technological Sciences)》 SCIE EI CAS 2012年第6期1757-1764,共8页
In this study,a numerical model,which can capture the full process of the development of seepage passages,the collapse of dams and the failure due to overtopping,is proposed for earth-rock dams.The critical incipient ... In this study,a numerical model,which can capture the full process of the development of seepage passages,the collapse of dams and the failure due to overtopping,is proposed for earth-rock dams.The critical incipient velocity for the occurrence of seepage failure is derived by analyzing the forces acting on soil particles in the seepage passage.The sediment transport formula is proposed to simulate the erosion process and the evolution of breach within the dam.In this model,the grain size distribution,the compaction density and the strength of dam materials are reasonably accounted for.Furthermore,the influences of the direction of seepage paths,the slope of the dam and the velocity of water flow on the amount of erosion are also taken into consideration.The proposed model and the corresponding numerical programs are employed to simulate the development of breaches and discharge of two typical cases due to seepage failure.The development of breaches,the history of discharge and the peak flood flux predicted by the numerical models are rather comparable to the measured data,which confirms the validity of the proposed model and the feasibility of applying the model in evaluating the disaster consequences and preparing the emergency counter measurements in the case of dam collapse. 展开更多
关键词 earth-rock dam seepage failure dam collapse numerical simulation
原文传递
COUPLING EFFECT BETWEEN RELIABILITY OF BEDDING LAYER AND STABILITY OF DOWNSTREAM CONCRETE SLAB OF OVERFLOW EARTH-ROCK COFFERDAM 被引量:4
8
作者 HU Zhi-gen FAN Xi-e +2 位作者 HUAI Wen-xin LIU Quan ZHU Ming-xing 《Journal of Hydrodynamics》 SCIE EI CSCD 2007年第5期613-622,共10页
The protection of downstream concrete slab is a key issue for the stability of overflow earth-rock cofferdam. The coupling effect between bedding layer and concrete slab was taken into account when the stability of do... The protection of downstream concrete slab is a key issue for the stability of overflow earth-rock cofferdam. The coupling effect between bedding layer and concrete slab was taken into account when the stability of downstream concrete slab was researched. The characteristics of overflow and seepage over the downstream concrete slab were investigated when floodwater passes over the cofferdam. Firstly a limit equation of seepage failure for the bedding layer was derived with the consideration of geometric and mechanical factors, and a reliability model was established and numerically simulated. Then based on the reliability calculation for the bedding layer, the coupling effect between bedding layer and downstream concrete slab was analyzed. Under the most unfavorable pressure condition for the concrete slab, its instability criterion was put forward, which offers a structural design tool of downstream concrete slab for overflow earth-rock cofferdam. Compared with model tests, it shows that the model of reliability calculation of bedding layer and the stability analysis of downstream concrete slab are effective. 展开更多
关键词 overflow earth-rock cofferdam couplingeffect reliability calculation stability analysis Monte Carlomethod
原文传递
RESEARCH ON SEEPAGE MONITORING MODEL OF EARTH-ROCK DAM 被引量:2
9
作者 Gu Chong shi, Zhang Qian fei College of Water Conservancy and Hydropower Engineering, Hohai University, Nanjing 210098, China 《Journal of Hydrodynamics》 SCIE EI CSCD 2003年第1期78-83,共6页
With the characteristics of seepage flow in earth-rock dams, a seepagemonitoring model was established based on the finite element method for 3-D seepage flow togetherwith observed data and was used to analyze and mon... With the characteristics of seepage flow in earth-rock dams, a seepagemonitoring model was established based on the finite element method for 3-D seepage flow togetherwith observed data and was used to analyze and monitor the seepage of dams. In order to find out andmonitor the seepage status of the whole dam, the separation of seepage a-mount for dam body, damfoundation and side banks was made theoretically by using the model. Practical example shows thatthe accuracy of computed results is satisfactory and the separation results are more objective. 展开更多
关键词 earth-rock dam seepage monitoring model
原文传递
A novel stacking-based ensemble learning model for drilling efficiency prediction in earth-rock excavation 被引量:1
10
作者 Fei LV Jia YU +3 位作者 Jun ZHANG Peng YU Da-wei TONG Bin-ping WU 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2022年第12期1027-1046,共20页
Accurate prediction of drilling efficiency is critical for developing the earth-rock excavation schedule.The single machine learning(ML)prediction models usually suffer from problems including parameter sensitivity an... Accurate prediction of drilling efficiency is critical for developing the earth-rock excavation schedule.The single machine learning(ML)prediction models usually suffer from problems including parameter sensitivity and overfitting.In addition,the influence of environmental and operational factors is often ignored.In response,a novel stacking-based ensemble learning method taking into account the combined effects of those factors is proposed.Through multiple comparison tests,four models,e Xtreme gradient boosting(XGBoost),random forest(RF),back propagation neural network(BPNN)as the base learners,and support vector regression(SVR)as the meta-learner,are selected for stacking.Furthermore,an improved cuckoo search optimization(ICSO)algorithm is developed for hyper-parameter optimization of the ensemble model.The application to a real-world project demonstrates that the proposed method outperforms the popular single ML method XGBoost and the ensemble model optimized by particle swarm optimization(PSO),with 16.43%and 4.88%improvements of mean absolute percentage error(MAPE),respectively. 展开更多
关键词 Drilling efficiency PREDICTION earth-rock excavation Stacking-based ensemble learning Improved cuckoo search optimization(ICSO)algorithm Comprehensive effects of various factors Hyper-parameter optimization
原文传递