期刊文献+
共找到955篇文章
< 1 2 48 >
每页显示 20 50 100
Rock engineering design of post-tensioned anchors for dams - A review 被引量:8
1
作者 E.T. Brown 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2015年第1期1-13,共13页
High-capacity, post-tensioned anchors have found wide-spread use, originally in initial dam design and construction, and more recently in the strengthening and rehabilitation of concrete dams to meet modern design and... High-capacity, post-tensioned anchors have found wide-spread use, originally in initial dam design and construction, and more recently in the strengthening and rehabilitation of concrete dams to meet modern design and safety standards. Despite the advances that have been made in rock mechanics and rock engineering during the last 80 years in which post-tensioned anchors have been used in dam en- gineering, some aspects of the rock engineering design of high-capacity rock anchors for dams have changed relatively little over the last 30 or 40 years. This applies, in particular, to the calculations usually carried out to establish the grouted embedment lengths required for deep, post-tensioned anchors. These calculations usually make simplified assumptions about the distribution and values of rock-grout interface shear strengths, the shape of the volume of rock likely to be involved in uplift failure under the influence of a system of post-tensioned anchors, and the mechanism of that failure. The resulting designs are generally conservative. It is concluded that these aspects of the rock engineering design of large, post- tensioned rock anchors for dams can be significantly improved by making greater use of modern, comprehensive, numerical analyses in conjunction with three-dimensional (3D) models of the rock mass structure, realistic rock and rock mass properties, and the results of prototype anchor tests in the rock mass concerned. 展开更多
关键词 dam engineering Post-tensioned anchorsRock engineering designGrout-tendon bondRock-grout bondRock mass uplift failure
下载PDF
Using Hydraulic Engineering Model Experiment to Study the Sediment Trapping Efficiency of Adjustable Check Dam
2
作者 Shu-Tzu Chen Hung-Ming Shu +1 位作者 Shin-En Chiu Chung-Li Hsu 《Engineering(科研)》 2016年第7期471-480,共11页
The construction of fully closed check dam (CD) is a conventional flood prevention mechanism implemented on rivers. Fully closed CDs trap large amounts of sediments in rivers to stabilize the river slopes and control ... The construction of fully closed check dam (CD) is a conventional flood prevention mechanism implemented on rivers. Fully closed CDs trap large amounts of sediments in rivers to stabilize the river slopes and control erosion. However, fully closed CDs cannot selectively trap sediment and may easily overflow, causing them to losing their ability to mediate and hold sediments. Previous studies proposed the concept of “breathable CDs”. The researcher introduced metal slit dam (SD) that could be assembled and disassembled quickly and conveniently. Once a CD reaches maximum capacity, operators must ensure that the water channels of the dam are free from blockage. Moreover, they must inspect the internal accumulation conditions of the dam periodically or immediately following heavy typhoon rains. When necessary, either the sediment buildup in the upriver blockage must be cleared, or the transverse structure of the dam must be removed to allow fine particles to be discharged along with a moderate amount of water. These actions can free up the sediment-storing capacity of the dam for the next heavy typhoon rains. In addition, operators should also inspect the damages inflicted on the dam, such as erosion, wear and tear, and deformation conditions. Damaged components should be disassembled and repaired if possible, or recycled and reused. The present study performed channel tests to simulate closed CDs, SDs, steel pipe dam (SPDs), and steel pipe plus slit dam (SPSDs) for 50-year and 100-year frequency floods. Results were then analyzed to determine the sediment trapping (ST) effects of various CDs, the effects of “adjustable CDs”, and the changes of moderated riverbeds. 展开更多
关键词 Sediment Trapping Check dam Riverbed Change Hydraulic engineering Model Experiment
下载PDF
Effect of Seismic Permanent Deformation on Safety and Stability of Earth-Rock Dam Slope
3
作者 戚蓝 陈启振 蔡建成 《Transactions of Tianjin University》 EI CAS 2015年第2期167-171,共5页
In order to study the effect of seismic permanent deformation on the safety and stability of earth-rock dam, the permanent deformation is considered as the non-design permanent load, and the stress-strain hysteresis c... In order to study the effect of seismic permanent deformation on the safety and stability of earth-rock dam, the permanent deformation is considered as the non-design permanent load, and the stress-strain hysteresis curve is also considered when the earth is under cyclic load. The research work can make the calculation results of plastic collapse more accurate by including the effect of the post-earthquake degree of plastic deformation on the stability of the earth-rock dam, and the dam safety factor decreases from 2.50 to 1.90 after the magnitude-8 earthquake. Moreover, the research work will also improve the design of the earth-rock dam under abnormal operating conditions. 展开更多
关键词 EARTHQUAKE PERMANENT DEFORMATION earth-rock dam safety FACTOR sensitivity analysis
下载PDF
Dynamic Risk Assessment Index System for Earth-Rock Dam during Construction
4
作者 葛巍 李宗坤 +1 位作者 李巍 赵梦蝶 《Journal of Donghua University(English Edition)》 EI CAS 2015年第6期923-926,共4页
During the construction of earth-rock dam,mutual exclusive construction goals such as quality,safety,progress and cost all have influences on each other,with risk factors being everchanging as the construction progres... During the construction of earth-rock dam,mutual exclusive construction goals such as quality,safety,progress and cost all have influences on each other,with risk factors being everchanging as the construction progresses.Accurate identification of the risk factors,as well as clearing any possible effect that any risk factors might have on the construction project is the key and foundation to our cooperative control of the construction goals.According to the construction planning of earth-rock dam,the hall3 D structure was used to identify the potential changes of risk factors,and the possible means of any risk factors to interfere with the construction goals.The dynamic risk assessment index system is established by deploying the WBS-RBS(work breakdown structurerisk breakdown structure)method,aiming at the construction goals of earth-rock dam.The case study shows that the index system is very effective at risk management of earth-rock dam during construction,and relatively practicable. 展开更多
关键词 hydraulic structure construction of earth-rock dam assessment index risk path construction goal
下载PDF
250 m级特高面板堆石坝混凝土面板顺坡向应力控制措施研究
5
作者 王芳 李国英 +1 位作者 米占宽 魏匡民 《三峡大学学报(自然科学版)》 CAS 北大核心 2024年第2期28-34,共7页
面板应力变形控制是建设250 m级特高混凝土面板堆石坝的关键难题.大量工程实测案例和研究计算表明,特高面板坝压应力常处于较高水平,对于坝轴向应力来说,采用柔性缝降低压应力措施已被工程界普遍接受,然而,目前对于如何降低面板顺坡向... 面板应力变形控制是建设250 m级特高混凝土面板堆石坝的关键难题.大量工程实测案例和研究计算表明,特高面板坝压应力常处于较高水平,对于坝轴向应力来说,采用柔性缝降低压应力措施已被工程界普遍接受,然而,目前对于如何降低面板顺坡向压应力尚缺少有效的解决方法.本文以拟建的240 m级GS面板坝为研究对象,从特殊增模区布置、面板施工顺序、面板低高程柔性横缝、高压力区高强度混凝土材料等4个方面提出改善面板顺坡向应力的工程措施.文中通过三维有限元精细模拟方法分析了提出的顺坡向应力改善措施的效果,文中提出的措施可为250 m面板堆石坝面板应力控制提供借鉴. 展开更多
关键词 特高面板堆石坝 结构应力 工程措施 有限元法
下载PDF
尾矿坝位移分级预警阈值研究及规律分析
6
作者 胡少华 曹思佳 袁友翠 《安全与环境学报》 CAS CSCD 北大核心 2024年第2期511-516,共6页
针对尾矿坝在线监测重建设、轻利用的现状,基于尾矿坝位移在线监测时间序列,通过多步逆向云变换算法(Multi-step Backward Cloud Transformation Algorithm Based on Sampling with Replacement,MBCT-SR)改进云模型,根据“3E_(n)原则”... 针对尾矿坝在线监测重建设、轻利用的现状,基于尾矿坝位移在线监测时间序列,通过多步逆向云变换算法(Multi-step Backward Cloud Transformation Algorithm Based on Sampling with Replacement,MBCT-SR)改进云模型,根据“3E_(n)原则”和内外包络曲线确定在线监测位移的正常运行值,从而建立尾矿坝位移分级预警阈值模型,并利用某尾矿坝全球导航卫星(Global Navigation Satellite System,GNSS)技术表面位移在线监测数据进行实例验证。结果表明:该尾矿坝水平方向位移的黄、橙、红预警阈值分别为8.41 mm/d、12.94 mm/d、19.41 mm/d,呈现出坝体中间预警阈值最大、并由中间向两侧减小的空间变化规律;尾矿坝垂直方向位移的黄、橙、红预警阈值分别为16.56 mm/d、25.48 mm/d、38.22 mm/d,且随着子坝的堆积,预警阈值逐渐增大。 展开更多
关键词 安全工程 尾矿坝 分级预警 多步逆向云变换算法(MBCT-SR) 阈值 空间分布
下载PDF
基于云模型-模糊FMECA法的水库大坝安全性分析 被引量:1
7
作者 陈泳江 汪魁 +1 位作者 赵明阶 范正强 《重庆交通大学学报(自然科学版)》 CAS CSCD 北大核心 2024年第4期30-36,共7页
模糊FMECA法通过对水库大坝隐患出现的频率、影响程度进行评价,并通过赋予权重及模糊综合评判对大坝进行风险评估,具有一定的科学性及实用性,但仍存在无法体现大坝隐患因子的随机性及无法准确反应专家主观偏好关系的缺陷。基于此,提出... 模糊FMECA法通过对水库大坝隐患出现的频率、影响程度进行评价,并通过赋予权重及模糊综合评判对大坝进行风险评估,具有一定的科学性及实用性,但仍存在无法体现大坝隐患因子的随机性及无法准确反应专家主观偏好关系的缺陷。基于此,提出了云模型-模糊FMECA法的水库大坝安全性分析方法,将模糊FMECA法中的评判矩阵、权重矩阵、对应的评语集进行逆向计算,得出了云模型数字特征值,通过模糊评判得到水库大坝风险评判结果的云模型;根据约束条件确定相应评语集的云模型的数字特征值,将大坝风险评判结果的云模型及各评语集云模型通过MATLAB仿真化,以此实现对水库大坝的安全性评价;将该方法运用到云南省某大坝中,得到了该大坝的内部安全评估等级为A,与现场专家组评判结果一致。证明了基于云模型-模糊FMECA法的水库大坝安全性分析具有一定的可行性及科学性。 展开更多
关键词 水利工程 水工结构 健康诊断 云模型-模糊FMECA法 大坝安全性
下载PDF
基于序贯高斯模拟法的水利工程坝址区速度建模
8
作者 李伟 周怀来 +2 位作者 刘兴业 王元君 马慧莲 《科学技术与工程》 北大核心 2024年第2期748-756,共9页
水利工程坝址的选取不仅关系着安全性,也影响着后期的投入使用以及稳定运行。通常坝址区选择需要对区域的速度和岩性进行分析,其中高精度的速度建模至关重要。针对水利坝址选取,提出了一种地震信息约束的地质统计学建模方法对坝址区进... 水利工程坝址的选取不仅关系着安全性,也影响着后期的投入使用以及稳定运行。通常坝址区选择需要对区域的速度和岩性进行分析,其中高精度的速度建模至关重要。针对水利坝址选取,提出了一种地震信息约束的地质统计学建模方法对坝址区进行高精度速度建模,在此基础上分析坝址选取的安全性及合理性。通过地质统计学理论,分析坝址区速度的区域变异性,利用地震层位的横向信息以及测井资料的纵向信息联合进行序贯高斯模拟,从而建立速度模型,建模结果更加符合实际情况,能有效反映速度的空间分布情况。最后通过建立的速度模型合成地震记录,与实际地震记录相对比,吻合程度较高,表明建立的模型能反映坝址区的速度分布情况,能基于此圈定出有利于修建坝址的区域,验证了方法的可行性。 展开更多
关键词 水利坝址区 速度建模 地质统计学 序贯高斯模拟 地震约束
下载PDF
隧道爆破施工对邻近水坝安全性影响分析
9
作者 毕志刚 陈有 +3 位作者 李旭哲 尹能俄 董子慧 梁斌 《水电能源科学》 北大核心 2024年第2期108-112,共5页
以义东高速防军隧道项目为依托,针对隧道爆破施工对邻近麻车坑水库坝体安全性影响进行研究。从混凝土损伤理论阐述了坝体的破坏过程,采用有限元软件MIDAS GTS NX建立隧道-水坝三维数值模型,通过分析坝体监测点的振速峰值、应力、位移及... 以义东高速防军隧道项目为依托,针对隧道爆破施工对邻近麻车坑水库坝体安全性影响进行研究。从混凝土损伤理论阐述了坝体的破坏过程,采用有限元软件MIDAS GTS NX建立隧道-水坝三维数值模型,通过分析坝体监测点的振速峰值、应力、位移及坝体边坡动安全系数,对其整体稳定性进行评估。结果表明,爆心距为100 m时,所产生的拉应力为0.1 kPa,此时隧道爆破对大坝的损伤几乎忽略不计;隧道爆破振动会导致坝体发生微小沉降变形,最大位移点在坝体中部,爆心距为70 m时,最小Y向位移约0.42 mm;水库大坝现场监测振速峰值为5.65 cm/s,模拟结果中振速峰值最大为2.6 cm/s,坝体边坡动安全系数最小值为1.034,结果均在安全范围内,这表明隧道出口段爆破施工结束后邻近水库坝体仍处于相对稳定状态,研究方法可为今后类似工程提供参考。 展开更多
关键词 隧道工程 水库坝体 爆破 爆破振速 数值模拟
下载PDF
水利工程中的橡胶坝锚固与安装施工技术研究
10
作者 张舶航 张玉婷 +1 位作者 朱颖 武磊 《科技资讯》 2024年第1期122-125,共4页
橡胶坝作为当前水利工程建设领域拦水调蓄中较为流行的全新低水头建筑物,在水利工程领域有着确切的应用价值。随着工程应用经验的累积,发现此类橡胶坝最典型漏水部位出现在锚固部位,而锚固部位漏水会受到一系列因素的影响。如何控制风... 橡胶坝作为当前水利工程建设领域拦水调蓄中较为流行的全新低水头建筑物,在水利工程领域有着确切的应用价值。随着工程应用经验的累积,发现此类橡胶坝最典型漏水部位出现在锚固部位,而锚固部位漏水会受到一系列因素的影响。如何控制风险因素,提高锚固件安装质量,对橡胶坝运行产生积极影响。尝试对水利工程中橡胶坝锚固与安装施工技术要点展开分析,对关键施工技术要点以及质量控制的具体内容进行分析,以锚固槽施工、充排水管安装、泵房混凝土施工以及坝袋安装为施工要点,在参建单位的共同协作与努力下,能够顺利完成橡胶坝锚固与安装作业,且通过验收达到合格标准,后期投入使用后,未见质量缺陷,所取得的工程实践应用效果是非常显著与确切的。希望能够引起业内重视,以更好地保障橡胶坝整体施工质量。 展开更多
关键词 水利工程 橡胶坝 锚固 安装 施工技术
下载PDF
高碾压混凝土拱坝整体稳定安全评估与工程类比研究
11
作者 汪妍 程恒 +3 位作者 杨仕志 解凌飞 杨波 李烽 《水力发电》 CAS 2024年第3期75-81,共7页
为分析高碾压混凝土拱坝的整体安全性,综合模拟主要断层、软弱夹层、裂隙、岩体材料分区以及坝体结构特征,建立拱坝整体稳定三维有限元模型。采用非线性有限元法分析正常运行条件下拱坝-地基的整体工作性态;在此基础上采用水容重超载法... 为分析高碾压混凝土拱坝的整体安全性,综合模拟主要断层、软弱夹层、裂隙、岩体材料分区以及坝体结构特征,建立拱坝整体稳定三维有限元模型。采用非线性有限元法分析正常运行条件下拱坝-地基的整体工作性态;在此基础上采用水容重超载法,计算拱坝的极限承载能力。结果表明,正常运行条件下,拱坝整体稳定性较好;通过对水容重安全系数进行工程类比,该拱坝具有较高的超载安全系数,处于拱坝工程的中等偏上水平。 展开更多
关键词 高拱坝 弹塑性有限元 超载法 整体稳定 安全度 工程类比
下载PDF
广东省罗定市大水坑水库大坝安全运行水文地质工程地质条件研究
12
作者 杨敬良 邓石林 +1 位作者 简兴飞 李志强 《地下水》 2024年第2期117-122,共6页
随着经济的飞速发展,我国水利事业建设迎来了黄金发展时期,水利工程项目越来越多,一些问题也逐渐暴露出来。本文以广东大水坑水库大坝安全运行水文地质工程地质条件为研究对象,通过资料收集、野外调查、地质钻探、原位试验、物探检测、... 随着经济的飞速发展,我国水利事业建设迎来了黄金发展时期,水利工程项目越来越多,一些问题也逐渐暴露出来。本文以广东大水坑水库大坝安全运行水文地质工程地质条件为研究对象,通过资料收集、野外调查、地质钻探、原位试验、物探检测、室内测试等手段,对该水库大坝进行了安全运行水文地质工程地质条件研究。研究结果表明:水库不存在水库渗漏和库岸稳定问题;如水库高水位运行,坝体渗漏危胁大坝安全,建议进行相应的防渗处理;并加强运行期间的监测。本研究为类似条件的水库后期安全运行、水库区可持续发展,提供了有益的参考。 展开更多
关键词 水利工程 水库大坝 水文地质 工程地质 安全鉴定
下载PDF
大坝填筑施工技术在水利水电工程中的应用
13
作者 丁丹 《科技资讯》 2024年第7期123-125,共3页
水利工程属于关系民生和经济发展的重要基础设施,对周边居民的生活质量和生产作业具有重要影响,尤其是对农业生产和畜牧养殖的影响较为深远。要想充分发挥水利工程的功能作用,则需加强水利工程建设投入。并重点分析了大坝填筑施工技术... 水利工程属于关系民生和经济发展的重要基础设施,对周边居民的生活质量和生产作业具有重要影响,尤其是对农业生产和畜牧养殖的影响较为深远。要想充分发挥水利工程的功能作用,则需加强水利工程建设投入。并重点分析了大坝填筑施工技术的应用方法,唯有如此才能为水利水电施工奠定良好的基础,保障水利水电工程的顺利施工。 展开更多
关键词 大坝填筑施工技术 水利水电工程 防渗性能 大坝填筑
下载PDF
综合技术在坝址区重大工程地质问题勘察中的应用
14
作者 谢忠伟 甘彬 +1 位作者 李俊燚 廖伟 《水利水电技术(中英文)》 北大核心 2024年第S01期176-181,共6页
针对拟建水库坝址区近坝库岸稳定性问题、坝基抗滑稳定性问题、坝基(肩)渗漏问题,采用工程地质测绘、综合物探、工程地质钻探及坑探、综合试验、综合分析等方法对拟建场地进行勘察,并对主要工程地质问题进行评价。结果表明,采用工程地... 针对拟建水库坝址区近坝库岸稳定性问题、坝基抗滑稳定性问题、坝基(肩)渗漏问题,采用工程地质测绘、综合物探、工程地质钻探及坑探、综合试验、综合分析等方法对拟建场地进行勘察,并对主要工程地质问题进行评价。结果表明,采用工程地质钻探与坑探、现场及室内试验、理正边坡稳定性分析的综合方法查明了崩积体的分布情况、组成结构,分析了其形成机理及破坏机制;采用工程地质测绘及赤平投影方法查明了卸荷裂隙的发育情况并分析其对边坡稳定性的影响;采用工程地质钻探、综合物探、压水试验、钻孔电视成像等综合技术查明坝址断层及缓倾角结构面的发育情况及工程性质,评价其对坝基抗滑稳定的影响,勘察效果良好。 展开更多
关键词 坝址勘察 工程地质测绘 工程钻探及坑探 综合物探 综合试验 综合分析
下载PDF
坝基固结灌浆施工技术研究
15
作者 罗康权 《广东建材》 2024年第4期119-121,共3页
以某水库大坝为例,通过孔内循环式灌浆法完成水库大坝固结灌浆施工,在施工过程中控制灌浆段的长度在10m以内,逐级加压,从上至下进行连续固结灌浆作业。施工完毕后监测点所在坝基位置的透水率均小于3Lu,符合基岩固结灌浆标准,有效地规避... 以某水库大坝为例,通过孔内循环式灌浆法完成水库大坝固结灌浆施工,在施工过程中控制灌浆段的长度在10m以内,逐级加压,从上至下进行连续固结灌浆作业。施工完毕后监测点所在坝基位置的透水率均小于3Lu,符合基岩固结灌浆标准,有效地规避了坝基岩体发生变形的风险,应用效果优势显著。 展开更多
关键词 坝基 水利水电工程 固结 灌浆施工技术 水库大坝
下载PDF
新型单组分喷涂聚氨酯对改进蓄水大坝工程止水性的试验研究
16
作者 孙乙庭 孟昕 +4 位作者 李永林 刘传军 刘建新 刘加利 王树武 《世界地质》 CAS 2024年第1期136-142,共7页
以某抽水蓄能电站大坝工程混凝土面板为例,采用新型单组分喷涂聚氨酯防水涂料对改进大坝工程止水性进行试验研究,分析涂料本身性能、涂层抗渗能力、涂层附着力以及耐候性能。结果表明,该新型单组分喷涂聚氨酯防水涂料具有优异的拉伸性... 以某抽水蓄能电站大坝工程混凝土面板为例,采用新型单组分喷涂聚氨酯防水涂料对改进大坝工程止水性进行试验研究,分析涂料本身性能、涂层抗渗能力、涂层附着力以及耐候性能。结果表明,该新型单组分喷涂聚氨酯防水涂料具有优异的拉伸性能、良好的耐久性能和优异的黏结性能,可有效改进蓄水大坝工程的止水性。 展开更多
关键词 蓄水大坝工程 混凝土面板 单组分聚氨酯 止水性
下载PDF
水库堤坝工程中防渗墙施工技术研究
17
作者 程文钲 《建筑技术开发》 2024年第7期48-50,共3页
防渗墙是一种用于修筑松散透水层、土石坝工程的构件。为进一步明确水库堤坝工程中防渗墙施工技术的实际应用,研究以塑性混凝土防渗墙施工技术为例,分别从施工准备阶段、混凝土试验、槽段布置与浇筑等方面,对该技术施工要点展开了分析... 防渗墙是一种用于修筑松散透水层、土石坝工程的构件。为进一步明确水库堤坝工程中防渗墙施工技术的实际应用,研究以塑性混凝土防渗墙施工技术为例,分别从施工准备阶段、混凝土试验、槽段布置与浇筑等方面,对该技术施工要点展开了分析。最后应用钻芯取样法与超声波检测技术对工程防渗墙质量进行检测。结果表明,塑形混凝土防渗墙施工技术在水库堤坝工程中的抗压强度等各项指标均达到设计标准,墙体完好无裂缝,故其符合工程设计要求。 展开更多
关键词 水库堤坝工程 防渗墙 施工技术
下载PDF
贵州省惠水县涟江大坝土壤硒分布特征及影响因素研究
18
作者 息朝庄 张鹏飞 +3 位作者 吴林锋 杨茗钛 范云飞 夏浩东 《中国地质》 CAS CSCD 北大核心 2024年第2期650-662,共13页
【研究目的】涟江大坝位于贵州省惠水县,为查明该地区土壤硒分布特征,系统采集了表层土壤样品337件,成土母岩样品4件,土壤剖面样品16件,分析测定Se、养分元素和As、Cd、Cr、Cu、Hg、Ni、Pb、Zn重金属元素等含量。【研究方法】通过表层... 【研究目的】涟江大坝位于贵州省惠水县,为查明该地区土壤硒分布特征,系统采集了表层土壤样品337件,成土母岩样品4件,土壤剖面样品16件,分析测定Se、养分元素和As、Cd、Cr、Cu、Hg、Ni、Pb、Zn重金属元素等含量。【研究方法】通过表层土壤、成土母岩、土壤剖面样品中Se、养分元素、重金属元素含量对比分析,结合相关性分析方法,对该区土壤Se分布特征进行评估。【研究结果】区内土壤偏酸性,土壤中Se元素含量范围为0.19~3.65 mg/kg;土壤中养分元素P、B和SOM含量高;区内不同成土母质表层土壤Se平均值具有上石炭统灰岩>中二叠统茅口组灰岩>中二叠统栖霞组灰岩>上白垩统茅台组砂岩>中三叠统罗楼组灰岩>中三叠统边阳组碎屑岩的变化规律;区内土壤剖面中Se含量随深度加深而降低。【结论】区内富硒土壤丰富,主要为中等和高级,富硒土壤面积为42.94 km2;土壤中Se与SOM呈显著正相关关系,Se与K_(2)O、pH呈显著负相关关系。 展开更多
关键词 土壤 生态环境 茅口组灰岩P2m 茅台组砂岩K2m 环境地质调查 涟江大坝 惠水 贵州省
下载PDF
东莞市三坑水库枢纽工程安全评价分析及处理建议
19
作者 罗小林 《云南水力发电》 2024年第4期172-175,共4页
水库枢纽工程运行可靠与否直接关系到流域防洪、区域供水安全等问题。东莞市三坑水库枢纽工程由大坝、溢洪道和输水涵管3个部分组成,经多年运行后存在一定病险隐患。为保证枢纽工程防洪兴利效益的稳定发挥,有必要开展安全评价工作。对... 水库枢纽工程运行可靠与否直接关系到流域防洪、区域供水安全等问题。东莞市三坑水库枢纽工程由大坝、溢洪道和输水涵管3个部分组成,经多年运行后存在一定病险隐患。为保证枢纽工程防洪兴利效益的稳定发挥,有必要开展安全评价工作。对三坑水库各分项性能进行了复核评价,最终评价大坝安全性为二类坝。在安全评价基础上,提出了相关处理措施建议供主管部门采纳和决策。 展开更多
关键词 水库枢纽工程 大坝 溢洪道 安全评价
下载PDF
百把寨水库坝址工程地质条件分析及坝型比选
20
作者 孙维太 《水电与新能源》 2024年第5期50-53,58,共5页
为降低百把寨水库工程建设风险和确保工程安全运行,充分发挥其经济与社会效益,针对水库工程可选坝址的地质构造、岩土性质、水文条件等,深入探究了上、下两处坝址的坝基、边坡和防渗条件等,推荐选择上坝址为宜;同时通过技术、经济、环... 为降低百把寨水库工程建设风险和确保工程安全运行,充分发挥其经济与社会效益,针对水库工程可选坝址的地质构造、岩土性质、水文条件等,深入探究了上、下两处坝址的坝基、边坡和防渗条件等,推荐选择上坝址为宜;同时通过技术、经济、环境影响、运行管理等方面对重力坝、拱坝和面板堆石坝三种坝型进行工程适宜性分析,推荐采用砌石重力坝。该工程的分析论证可供类似中型水库工程坝址坝型比选参考。 展开更多
关键词 中型水库 工程地质条件 坝型比选 适宜性分析 砌石重力坝
下载PDF
上一页 1 2 48 下一页 到第
使用帮助 返回顶部