Based on advanced computer technology, internet of things (lOT) technology, project management con- cept and professional technology and combined with the innovative theories, methods and techniques in earlier hy- d...Based on advanced computer technology, internet of things (lOT) technology, project management con- cept and professional technology and combined with the innovative theories, methods and techniques in earlier hy- dropower projects, the life-cycle risk management system of high earth-rock dam project for Nuozhadu project was developed. The system mainly includes digital dam, three-dimensional design, construction quality monito- ring, safety assessment and warning, etc, to integrally manage and analyze the dam design, constructional quality and safety monitoring information. It realized the dynamic updates of the comprehensive information and the safe- ty quality monitoring in the project life cycle, and provided the basic platform for the scientific management of the construction and operation safety of high earth-rock dam. Application in Nuozhadu earth-rock dam showed that construction safety monitoring and warning greatly helped accelerate the construction progress and improve project quality, and provided a new way for the quality safety control of high earth-rock dam.展开更多
With the population growth through natural growth and migration,coupled with the city expansion,it is the fact that Dehradun City in India faces severe water scarcity.Therefore,the Song Dam Drinking Water Project(SDDW...With the population growth through natural growth and migration,coupled with the city expansion,it is the fact that Dehradun City in India faces severe water scarcity.Therefore,the Song Dam Drinking Water Project(SDDWP)is proposed to provide ample drinking water to Dehradun City and its suburban areas.This paper examined economic significance and environmental impacts of the SDDWP in Garhwal Himalaya,India.To conduct this study,we collected data from both primary and secondary sources.There are 12 villages and 3 forest divisions in the surrounding areas of the proposed dam project,of which 3 villages will be fully submerged and 50 households will be affected.For this study,50 heads of the households were interviewed in the 3 submerged villages.The questions mainly focused on economic significance,environmental impacts,and rehabilitation issues of the dam project.The findings of this study indicate that economic significance of the dam project is substantial,including providing ample water for drinking and irrigation,contributing to groundwater recharge,creating job opportunities,and promoting the development of tourism and fisheries in the Doon Valley.In terms of the rehabilitation of the affected people,there are only 50 households in need of rehabilitation.Currently,the arable land of these affected people is not sufficient to sustain their livelihoods.The entire landscape is fragile,rugged,and precipitous;therefore,the affected people are willing to rehabilitate to more suitable areas in the Doon Valley.Moreover,it is essential to provide them with sufficient compensation packages including the compensation of arable land,houses,cash,common property resources,institutions,belongingness,and cultural adaptation.On the other hand,the proposed dam project will have adverse environmental impacts including arable land degradation,forest degradation,loss of fauna and flora,soil erosion,landslides,and soil siltation.These impacts will lead to the ecological imbalances in both upstream and downstream areas.This study suggests that the affected people should be given sufficient compensation packages in all respects.Afforestation programs can be launched in the degraded areas to compensate for the loss of forest in the affected areas.展开更多
As a national cultural property,General Zhang Fei’s Temple is the largest ancient architectural complex in the Three Gorges of the Yangtze River.It was built in the Han Dynasty and has a long history of nearly 2,000 ...As a national cultural property,General Zhang Fei’s Temple is the largest ancient architectural complex in the Three Gorges of the Yangtze River.It was built in the Han Dynasty and has a long history of nearly 2,000 years.In 1994,the Chinese government launched the Three Gorges Dam project at the Yangtze River and implemented the largest relocation project for the General Zhang Fei Temple to prevent it from being submerged.The temple was relocated 32 kilometers upstream along with the local people of Yunyang County,and the historic environment was rebuilt on the opposite side of the migrant city of New Yunyang County.The temple was restored successfully and the tradition of offering sacrifices to General Zhang Fei continued in the local community.The relocation project lasted for 8 years and became the largest cultural heritage conservation project of the People’s Republic of China at the end of the 20th century.This paper comprehensively summarizes and reviews the project goals,implementation process,and project highlights of this relocation,so as to provide an important case reference for heritage conservation projects in the future.展开更多
In order to study the effect of seismic permanent deformation on the safety and stability of earth-rock dam, the permanent deformation is considered as the non-design permanent load, and the stress-strain hysteresis c...In order to study the effect of seismic permanent deformation on the safety and stability of earth-rock dam, the permanent deformation is considered as the non-design permanent load, and the stress-strain hysteresis curve is also considered when the earth is under cyclic load. The research work can make the calculation results of plastic collapse more accurate by including the effect of the post-earthquake degree of plastic deformation on the stability of the earth-rock dam, and the dam safety factor decreases from 2.50 to 1.90 after the magnitude-8 earthquake. Moreover, the research work will also improve the design of the earth-rock dam under abnormal operating conditions.展开更多
During the construction of earth-rock dam,mutual exclusive construction goals such as quality,safety,progress and cost all have influences on each other,with risk factors being everchanging as the construction progres...During the construction of earth-rock dam,mutual exclusive construction goals such as quality,safety,progress and cost all have influences on each other,with risk factors being everchanging as the construction progresses.Accurate identification of the risk factors,as well as clearing any possible effect that any risk factors might have on the construction project is the key and foundation to our cooperative control of the construction goals.According to the construction planning of earth-rock dam,the hall3 D structure was used to identify the potential changes of risk factors,and the possible means of any risk factors to interfere with the construction goals.The dynamic risk assessment index system is established by deploying the WBS-RBS(work breakdown structurerisk breakdown structure)method,aiming at the construction goals of earth-rock dam.The case study shows that the index system is very effective at risk management of earth-rock dam during construction,and relatively practicable.展开更多
The dam of Three Gorges Project is a concrete gravity dam with the crest elevation of 185 m,the maximum height of 181 m and dam axis length of 2 309.5 m.The dam consists of spillway,powerhouse,non-over flow,ship-lift,...The dam of Three Gorges Project is a concrete gravity dam with the crest elevation of 185 m,the maximum height of 181 m and dam axis length of 2 309.5 m.The dam consists of spillway,powerhouse,non-over flow,ship-lift,temporary ship-lock,left diversion wall and longitudinal cofferdam blocks.Some key techniques relating to dam structure design are presented,including hydraulics of flood discharge structure,dam joint design,layout and structural type of penstock,deep anti-sliding stability of dam foundation,reconstruction of temporary ship-lock and closed drainage and pumping of dam foundation.展开更多
Selecting right equipment has been playing an important role in the success of construction projects. This paper presents a computer model, ESCMODEL, for equipment selection in Earth-fill dam projects. The proposed mo...Selecting right equipment has been playing an important role in the success of construction projects. This paper presents a computer model, ESCMODEL, for equipment selection in Earth-fill dam projects. The proposed model is capable of assisting the users in making decisions to determine the size, number, type and schedule of presence of dozers, loaders, graders, excavators, trucks, sheepsfoot rollers and smooth wheel rollers. ESCMODEL can contribute to resolve this selection process through the application of an optimization technique, based on nonlinear programming. Three actual case studies of earth-fill dam projects are presented in order to illustrate the effectiveness and performance of the model.展开更多
It hasn’t been easy, but almost all of the work on the Three Gorges Project is on schedule, according to a corporation overseeing construction of the dam. The China Yangtze Three Gorges Project Development Corporatio...It hasn’t been easy, but almost all of the work on the Three Gorges Project is on schedule, according to a corporation overseeing construction of the dam. The China Yangtze Three Gorges Project Development Corporation has reported that contractors and other staff are working hard to ensure that the flood season does not slow the dam project. The company recently detailed the mammoth tasks that have taken place so展开更多
文摘Based on advanced computer technology, internet of things (lOT) technology, project management con- cept and professional technology and combined with the innovative theories, methods and techniques in earlier hy- dropower projects, the life-cycle risk management system of high earth-rock dam project for Nuozhadu project was developed. The system mainly includes digital dam, three-dimensional design, construction quality monito- ring, safety assessment and warning, etc, to integrally manage and analyze the dam design, constructional quality and safety monitoring information. It realized the dynamic updates of the comprehensive information and the safe- ty quality monitoring in the project life cycle, and provided the basic platform for the scientific management of the construction and operation safety of high earth-rock dam. Application in Nuozhadu earth-rock dam showed that construction safety monitoring and warning greatly helped accelerate the construction progress and improve project quality, and provided a new way for the quality safety control of high earth-rock dam.
文摘With the population growth through natural growth and migration,coupled with the city expansion,it is the fact that Dehradun City in India faces severe water scarcity.Therefore,the Song Dam Drinking Water Project(SDDWP)is proposed to provide ample drinking water to Dehradun City and its suburban areas.This paper examined economic significance and environmental impacts of the SDDWP in Garhwal Himalaya,India.To conduct this study,we collected data from both primary and secondary sources.There are 12 villages and 3 forest divisions in the surrounding areas of the proposed dam project,of which 3 villages will be fully submerged and 50 households will be affected.For this study,50 heads of the households were interviewed in the 3 submerged villages.The questions mainly focused on economic significance,environmental impacts,and rehabilitation issues of the dam project.The findings of this study indicate that economic significance of the dam project is substantial,including providing ample water for drinking and irrigation,contributing to groundwater recharge,creating job opportunities,and promoting the development of tourism and fisheries in the Doon Valley.In terms of the rehabilitation of the affected people,there are only 50 households in need of rehabilitation.Currently,the arable land of these affected people is not sufficient to sustain their livelihoods.The entire landscape is fragile,rugged,and precipitous;therefore,the affected people are willing to rehabilitate to more suitable areas in the Doon Valley.Moreover,it is essential to provide them with sufficient compensation packages including the compensation of arable land,houses,cash,common property resources,institutions,belongingness,and cultural adaptation.On the other hand,the proposed dam project will have adverse environmental impacts including arable land degradation,forest degradation,loss of fauna and flora,soil erosion,landslides,and soil siltation.These impacts will lead to the ecological imbalances in both upstream and downstream areas.This study suggests that the affected people should be given sufficient compensation packages in all respects.Afforestation programs can be launched in the degraded areas to compensate for the loss of forest in the affected areas.
文摘As a national cultural property,General Zhang Fei’s Temple is the largest ancient architectural complex in the Three Gorges of the Yangtze River.It was built in the Han Dynasty and has a long history of nearly 2,000 years.In 1994,the Chinese government launched the Three Gorges Dam project at the Yangtze River and implemented the largest relocation project for the General Zhang Fei Temple to prevent it from being submerged.The temple was relocated 32 kilometers upstream along with the local people of Yunyang County,and the historic environment was rebuilt on the opposite side of the migrant city of New Yunyang County.The temple was restored successfully and the tradition of offering sacrifices to General Zhang Fei continued in the local community.The relocation project lasted for 8 years and became the largest cultural heritage conservation project of the People’s Republic of China at the end of the 20th century.This paper comprehensively summarizes and reviews the project goals,implementation process,and project highlights of this relocation,so as to provide an important case reference for heritage conservation projects in the future.
文摘In order to study the effect of seismic permanent deformation on the safety and stability of earth-rock dam, the permanent deformation is considered as the non-design permanent load, and the stress-strain hysteresis curve is also considered when the earth is under cyclic load. The research work can make the calculation results of plastic collapse more accurate by including the effect of the post-earthquake degree of plastic deformation on the stability of the earth-rock dam, and the dam safety factor decreases from 2.50 to 1.90 after the magnitude-8 earthquake. Moreover, the research work will also improve the design of the earth-rock dam under abnormal operating conditions.
基金National Natural Science Foundation of China(No.51379192)
文摘During the construction of earth-rock dam,mutual exclusive construction goals such as quality,safety,progress and cost all have influences on each other,with risk factors being everchanging as the construction progresses.Accurate identification of the risk factors,as well as clearing any possible effect that any risk factors might have on the construction project is the key and foundation to our cooperative control of the construction goals.According to the construction planning of earth-rock dam,the hall3 D structure was used to identify the potential changes of risk factors,and the possible means of any risk factors to interfere with the construction goals.The dynamic risk assessment index system is established by deploying the WBS-RBS(work breakdown structurerisk breakdown structure)method,aiming at the construction goals of earth-rock dam.The case study shows that the index system is very effective at risk management of earth-rock dam during construction,and relatively practicable.
文摘The dam of Three Gorges Project is a concrete gravity dam with the crest elevation of 185 m,the maximum height of 181 m and dam axis length of 2 309.5 m.The dam consists of spillway,powerhouse,non-over flow,ship-lift,temporary ship-lock,left diversion wall and longitudinal cofferdam blocks.Some key techniques relating to dam structure design are presented,including hydraulics of flood discharge structure,dam joint design,layout and structural type of penstock,deep anti-sliding stability of dam foundation,reconstruction of temporary ship-lock and closed drainage and pumping of dam foundation.
文摘Selecting right equipment has been playing an important role in the success of construction projects. This paper presents a computer model, ESCMODEL, for equipment selection in Earth-fill dam projects. The proposed model is capable of assisting the users in making decisions to determine the size, number, type and schedule of presence of dozers, loaders, graders, excavators, trucks, sheepsfoot rollers and smooth wheel rollers. ESCMODEL can contribute to resolve this selection process through the application of an optimization technique, based on nonlinear programming. Three actual case studies of earth-fill dam projects are presented in order to illustrate the effectiveness and performance of the model.
文摘It hasn’t been easy, but almost all of the work on the Three Gorges Project is on schedule, according to a corporation overseeing construction of the dam. The China Yangtze Three Gorges Project Development Corporation has reported that contractors and other staff are working hard to ensure that the flood season does not slow the dam project. The company recently detailed the mammoth tasks that have taken place so