Two explicit expressions of the stress concentration factor for a tension finite-width strip with a central elliptical hole and an eccentric elliptical hole, respectively, are formulated by using a semi-analytical and...Two explicit expressions of the stress concentration factor for a tension finite-width strip with a central elliptical hole and an eccentric elliptical hole, respectively, are formulated by using a semi-analytical and semi-empiricai method. Accuracy of the results obtained from these expressions is better, and application scope is wider, than the results of Durelli's photo-elastic experiment and Isida's formula. When eccentricity of the elliptical hole is within a certain range, the error is less than 8%. Based on the relation between the stress concentration factor and the stress intensity factor, a stress intensity factor expression for tension strips with a center or an eccentric crack is derived with the obtained stress concentration factor expressions. Compared with the existing formulae and the finite element analysis, this stress intensity factor expression also has sufficient accuracy.展开更多
With special drilling operation equipment and specific conditions of geology, how does drilling fluid carry cuttings effectively? So far, it is still an urgent problem for drilling researchers to study. This work just...With special drilling operation equipment and specific conditions of geology, how does drilling fluid carry cuttings effectively? So far, it is still an urgent problem for drilling researchers to study. This work just aims at the actual engineering background to develop studying model. In this paper, according to non Newtonian fluid mechanics, the law of the solid liquid, two phase fluid flow and actual drilling engineering, the major factors affecting cuttings transport are drilling fluid velocity, hole inclination and fluid rheological properties. Getting a clear understanding of the law of drilling fluid and its cutting taking mechanism, this paper puts forward a model for analysis of field data and quantitative forecast of cutting taking capability of drilling fluid. The full scale annular test section was 6.1 m with 76 and 114 mm drillpipe in a 203 mm ID (wellbore diameter). Hole angle varied from 0° to 90°.展开更多
基金supported by the National Natural Science Foundation of China (No. 51179115)
文摘Two explicit expressions of the stress concentration factor for a tension finite-width strip with a central elliptical hole and an eccentric elliptical hole, respectively, are formulated by using a semi-analytical and semi-empiricai method. Accuracy of the results obtained from these expressions is better, and application scope is wider, than the results of Durelli's photo-elastic experiment and Isida's formula. When eccentricity of the elliptical hole is within a certain range, the error is less than 8%. Based on the relation between the stress concentration factor and the stress intensity factor, a stress intensity factor expression for tension strips with a center or an eccentric crack is derived with the obtained stress concentration factor expressions. Compared with the existing formulae and the finite element analysis, this stress intensity factor expression also has sufficient accuracy.
文摘With special drilling operation equipment and specific conditions of geology, how does drilling fluid carry cuttings effectively? So far, it is still an urgent problem for drilling researchers to study. This work just aims at the actual engineering background to develop studying model. In this paper, according to non Newtonian fluid mechanics, the law of the solid liquid, two phase fluid flow and actual drilling engineering, the major factors affecting cuttings transport are drilling fluid velocity, hole inclination and fluid rheological properties. Getting a clear understanding of the law of drilling fluid and its cutting taking mechanism, this paper puts forward a model for analysis of field data and quantitative forecast of cutting taking capability of drilling fluid. The full scale annular test section was 6.1 m with 76 and 114 mm drillpipe in a 203 mm ID (wellbore diameter). Hole angle varied from 0° to 90°.