In this paper, an approach is presented to calculate the reserve capacity of Pump- Hydro Combined Energy Storage (PHCES) integrated with wind generation. The proposed approach utilizes Monte Carlo methods to obtain al...In this paper, an approach is presented to calculate the reserve capacity of Pump- Hydro Combined Energy Storage (PHCES) integrated with wind generation. The proposed approach utilizes Monte Carlo methods to obtain all the reasonable capacity of PHCES based on the power system reliability requirement. The pumping and hydro period of PHCES will be taken into consideration to estimate the reliability of wind power generation with PHCES. Finally this approach is applied in a RBTS system to calculate the minimum capacity of PHCES.展开更多
The first stage project of Jiuquan wind energy base with 5.5-GW installed capacity is about to be completed. However, there exist several technical issues such as power transfer capability, electricity accommodation, ...The first stage project of Jiuquan wind energy base with 5.5-GW installed capacity is about to be completed. However, there exist several technical issues such as power transfer capability, electricity accommodation, frequency control and peak load regulation as well as system stability. In addition, the high capital cost and operation cost of the supporting transmission project invested and constructed by the Gansu Provincial Power Company will definitely have significant impacts on the management and economic profit of the Company. Through analysis of the construction and operation cost changes resulting from the wind power collection and delivery project, the author carried out research into the effects of developing large-scale wind power base on the management and economic benefits of power grid enterprises and proposed corresponding suggestions to make the related policies perfect.展开更多
文摘In this paper, an approach is presented to calculate the reserve capacity of Pump- Hydro Combined Energy Storage (PHCES) integrated with wind generation. The proposed approach utilizes Monte Carlo methods to obtain all the reasonable capacity of PHCES based on the power system reliability requirement. The pumping and hydro period of PHCES will be taken into consideration to estimate the reliability of wind power generation with PHCES. Finally this approach is applied in a RBTS system to calculate the minimum capacity of PHCES.
文摘The first stage project of Jiuquan wind energy base with 5.5-GW installed capacity is about to be completed. However, there exist several technical issues such as power transfer capability, electricity accommodation, frequency control and peak load regulation as well as system stability. In addition, the high capital cost and operation cost of the supporting transmission project invested and constructed by the Gansu Provincial Power Company will definitely have significant impacts on the management and economic profit of the Company. Through analysis of the construction and operation cost changes resulting from the wind power collection and delivery project, the author carried out research into the effects of developing large-scale wind power base on the management and economic benefits of power grid enterprises and proposed corresponding suggestions to make the related policies perfect.