As the scale of the power system continues to expand,the environment for power operations becomes more and more complex.Existing risk management and control methods for power operations can only set the same risk dete...As the scale of the power system continues to expand,the environment for power operations becomes more and more complex.Existing risk management and control methods for power operations can only set the same risk detection standard and conduct the risk detection for any scenario indiscriminately.Therefore,more reliable and accurate security control methods are urgently needed.In order to improve the accuracy and reliability of the operation risk management and control method,this paper proposes a method for identifying the key links in the whole process of electric power operation based on the spatiotemporal hybrid convolutional neural network.To provide early warning and control of targeted risks,first,the video stream is framed adaptively according to the pixel changes in the video stream.Then,the optimized MobileNet is used to extract the feature map of the video stream,which contains both time-series and static spatial scene information.The feature maps are combined and non-linearly mapped to realize the identification of dynamic operating scenes.Finally,training samples and test samples are produced by using the whole process image of a power company in Xinjiang as a case study,and the proposed algorithm is compared with the unimproved MobileNet.The experimental results demonstrated that the method proposed in this paper can accurately identify the type and start and end time of each operation link in the whole process of electric power operation,and has good real-time performance.The average accuracy of the algorithm can reach 87.8%,and the frame rate is 61 frames/s,which is of great significance for improving the reliability and accuracy of security control methods.展开更多
As new power systems and dual carbon policies develop,virtual power plant cluster(VPPC)provides another reliable way to promote the efficient utilization of energy and solve environmental pollution problems.To solve t...As new power systems and dual carbon policies develop,virtual power plant cluster(VPPC)provides another reliable way to promote the efficient utilization of energy and solve environmental pollution problems.To solve the coordinated optimal operation and low-carbon economic operation problem in multi-virtual power plant,a multi-virtual power plant(VPP)electricity-carbon interaction optimal scheduling model considering integrated demand response(IDR)is proposed.Firstly,a multi-VPP electricity-carbon interaction framework is established.The interaction of electric energy and carbon quotas can realize energy complementarity,reduce energy waste and promote low-carbon operation.Secondly,in order to coordinate the multiple types of energy and load in VPPC to further achieve low-carbon operation,the IDR mechanism based on the user comprehensive satisfaction(UCS)of electricity,heat as well as hydrogen is designed,which can effectively maintain the UCS in the cluster within a relatively high range.Finally,the unit output scheme is formulated to minimize the total cost of VPPC and the model is solved using theCPLEX solver.The simulation results showthat the proposed method effectively promotes the coordinated operation among multi-VPP,increases the consumption rate of renewable energy sources and the economics of VPPC and reduces carbon emissions.展开更多
Distributed photovoltaic power (PV) is the main development model of distributed generation. It is necessary to research on dispatching and operation management with large-scale distributed PV connected. This paper an...Distributed photovoltaic power (PV) is the main development model of distributed generation. It is necessary to research on dispatching and operation management with large-scale distributed PV connected. This paper analyzes development status, technical requirement and dispatching and operation management situation of distributed PV in Germany and China. Then introduce the preparation of distributed PV dispatching and operation management criterion. Through summarizing the experiences and lessons of large-scale distributed PV development in Germany, it gives advice to the development of distributed PV dispatching and operation management in China.展开更多
With the development of power systems, power grid within a control area becomes much more complicated due to increasing number of nodes and renewable energy interconnections. The role of power system control center is...With the development of power systems, power grid within a control area becomes much more complicated due to increasing number of nodes and renewable energy interconnections. The role of power system control center is more critical in maintaining system reliable and security operations. Latest developed information and communication technologies provide a platform to enhance the functions and performance of power system control center. Smart power dispatch concept will be the trend of future control center development. In this paper, we start from the human factors of control center design and propose operation indices to reduce the information presented to the system operator. The operation indices will be the important criteria in situation awareness of a power grid. Past, present, future and capability states of a power grid are also proposed to provide better visions to the operator of system conditions. The basic ideas of operation indices and operation states are discussed in the paper. In the end, the design factors for a power dispatch cockpit are discussed.展开更多
It is important to distribute the load efficiently to minimize the cost of the economic dispatch of electrical power system. The uncertainty and volatility of wind energy make the economic dispatch much more complex w...It is important to distribute the load efficiently to minimize the cost of the economic dispatch of electrical power system. The uncertainty and volatility of wind energy make the economic dispatch much more complex when the general power systems are combined with wind farms. The short term wind power prediction method was discussed in this paper. The method was based on the empirical mode decomposition (EMD) and ensemble empirical mode decomposition (EEMD). Furthermore,the effect of wind farms on the traditional economic dispatch of electrical power system was analyzed. The mathematical model of the economic dispatch was established considering the environmental factors and extra spinning reserve cost. The multi-objective co-evolutionary algorithm was used to figure out the model. And the results were compared with the NSGA-Ⅱ(non-dominated sorting genetic algorithm-Ⅱ) to verify its feasibility.展开更多
National Grid is the electricity system operator in Great Britain and has an unique feature in so far as it is one of the world’s few for-profit system operators. In addition, the commercially orientation of the Brit...National Grid is the electricity system operator in Great Britain and has an unique feature in so far as it is one of the world’s few for-profit system operators. In addition, the commercially orientation of the British market rules means that nearly every action taken by National Grid to operate the system has a cost associated to it. Based on those factors and in order to encourage National Grid to seek continuous improvements and drive for efficient and economic system operation, the regulator (Ofgem) offers an incentive scheme, whereby a target is agreed annually and any savings in relation to this target are shared between consumers and National Grid in the form of a profit. It is in National Grid’s best interest to have mechanisms to mitigate the impacts of volatility in the costs it faces as system operator so that it can implement cost saving actions without the risk of windfall losses (or gains) arising from sudden changes in uncontrollable drivers. The purpose of this paper is to share the experiences of National Grid in the operation of Great Britain's electricity system, with a special interest on the mechanisms created to manage the associated costs in response to the incentive scheme. It does so by describing the market operation in Great Britain and the costs drivers impacting National Grid’s system operation and illustrating the steps recently taken by National Grid to propose volatility mitigation mechanisms. It concludes with the rationale and expected results from the latest proposals as consulted with the industry for introduction in the incentive scheme starting on 1st April 2011. It is worth noting that with this work, the authors wish to both share the experience with other system operators and regulators in the world, as well as give British market participants an insight on the inner workings of National Grid.展开更多
For the implementation of power market in China,medium-and Iong-term security checks are essential for bilateral transactions,of which the electricity quantity that constitutes the generation feasible region(GFR)is th...For the implementation of power market in China,medium-and Iong-term security checks are essential for bilateral transactions,of which the electricity quantity that constitutes the generation feasible region(GFR)is the target.However,uncertainties from load forecasting errors and transmission contingencies are threats to medium-and Iong-term electricity tradi ng in terms of their in flue nces on the GFR.In this paper,we prese nt a graphic distortio n pattern in a typical threegenerator system using the Monte Carlo method and projection theory based on security constrained economic dispatch.The underlying potential risk to GFR from uncertainties is clearly visualized,and their impact characteristics are discussed.A case study on detailed GFR distortion was included to dem on strate the effectiveness of this visualization model.The result implies that a small uncertainty could distort the GFR to a remarkable extent and that different line-contingency precipitates disparate the GFR distortion patterns,thereby eliciting great emphasis on load forecasting and line reliability in electricity transacti ons.展开更多
Electricity network is a very complex entity that comprises several components like generators, transmission lines, loads among others. As technologies continue to evolve, the complexity of the electricity network has...Electricity network is a very complex entity that comprises several components like generators, transmission lines, loads among others. As technologies continue to evolve, the complexity of the electricity network has also increased as more devices are being connected to the network. To understand the physical laws governing the operation of the network, techniques such as optimal power flow (OPF), Economic dispatch (ED) and Security constrained optimal power flow (SCOPF) were developed. These techniques have been used extensively in network operation, planning and so on. However, an in-depth presentation showcasing the merits and demerits of these techniques is still lacking in the literature. Hence, this paper intends to fill this gap. In this paper, Economic dispatch, optimal power flow and security-constrained optimal power flow are applied to a 3-bus test system using a linear programming approach. The results of the ED, OPF and SC-OPF are compared and presented.展开更多
There is a false notion of existing available, abundant, and long lasting fuel energy in the Gulf Cooperation Council (GCC) Countries;with continual income return from its exports. This is not true as the sustainabili...There is a false notion of existing available, abundant, and long lasting fuel energy in the Gulf Cooperation Council (GCC) Countries;with continual income return from its exports. This is not true as the sustainability of this income is questionable. Energy problems started to appear, and can be intensified in coming years due to continuous growth of energy demands and consumptions. The demands already consume all produced Natural Gas (NG) in all GCC, except Qatar;and the NG is the needed fuel for Electric Power (EP) production. These countries have to import NG to run their EP plants. Fuel oil production can be locally consumed within two to three decades if the current rate of consumed energy prevails. The returns from selling the oil and natural gas are the main income to most of the GCC. While NG and oil can be used in EP plants, NG is cheaper, cleaner, and has less negative effects on the environment than fuel oil. Moreover, oil has much better usage than being burned in steam generators of steam power plants or combustion chambers of gas turbines. Introducing renewable energy or nuclear energy may be a necessity for the GCC to keep the flow of their main income from exporting oil. This paper reviews the GCC productions and consumptions of the prime energy (fuel oil and NG) and their role in electric power production. The paper shows that, NG should be the only fossil fuel used to run the power plants in the GCC. It also shows that the all GCC except Qatar, have to import NG. They should diversify the prime energy used in power plants;and consider alternative energy such as nuclear and renewable energy, (solar and wind) energy.展开更多
基金This paper is supported by the Science and technology projects of Yunnan Province(Grant No.202202AD080004).
文摘As the scale of the power system continues to expand,the environment for power operations becomes more and more complex.Existing risk management and control methods for power operations can only set the same risk detection standard and conduct the risk detection for any scenario indiscriminately.Therefore,more reliable and accurate security control methods are urgently needed.In order to improve the accuracy and reliability of the operation risk management and control method,this paper proposes a method for identifying the key links in the whole process of electric power operation based on the spatiotemporal hybrid convolutional neural network.To provide early warning and control of targeted risks,first,the video stream is framed adaptively according to the pixel changes in the video stream.Then,the optimized MobileNet is used to extract the feature map of the video stream,which contains both time-series and static spatial scene information.The feature maps are combined and non-linearly mapped to realize the identification of dynamic operating scenes.Finally,training samples and test samples are produced by using the whole process image of a power company in Xinjiang as a case study,and the proposed algorithm is compared with the unimproved MobileNet.The experimental results demonstrated that the method proposed in this paper can accurately identify the type and start and end time of each operation link in the whole process of electric power operation,and has good real-time performance.The average accuracy of the algorithm can reach 87.8%,and the frame rate is 61 frames/s,which is of great significance for improving the reliability and accuracy of security control methods.
基金supported by the National Natural Science Foundation of China (NSFC) (Grant No.52107107).
文摘As new power systems and dual carbon policies develop,virtual power plant cluster(VPPC)provides another reliable way to promote the efficient utilization of energy and solve environmental pollution problems.To solve the coordinated optimal operation and low-carbon economic operation problem in multi-virtual power plant,a multi-virtual power plant(VPP)electricity-carbon interaction optimal scheduling model considering integrated demand response(IDR)is proposed.Firstly,a multi-VPP electricity-carbon interaction framework is established.The interaction of electric energy and carbon quotas can realize energy complementarity,reduce energy waste and promote low-carbon operation.Secondly,in order to coordinate the multiple types of energy and load in VPPC to further achieve low-carbon operation,the IDR mechanism based on the user comprehensive satisfaction(UCS)of electricity,heat as well as hydrogen is designed,which can effectively maintain the UCS in the cluster within a relatively high range.Finally,the unit output scheme is formulated to minimize the total cost of VPPC and the model is solved using theCPLEX solver.The simulation results showthat the proposed method effectively promotes the coordinated operation among multi-VPP,increases the consumption rate of renewable energy sources and the economics of VPPC and reduces carbon emissions.
文摘Distributed photovoltaic power (PV) is the main development model of distributed generation. It is necessary to research on dispatching and operation management with large-scale distributed PV connected. This paper analyzes development status, technical requirement and dispatching and operation management situation of distributed PV in Germany and China. Then introduce the preparation of distributed PV dispatching and operation management criterion. Through summarizing the experiences and lessons of large-scale distributed PV development in Germany, it gives advice to the development of distributed PV dispatching and operation management in China.
文摘With the development of power systems, power grid within a control area becomes much more complicated due to increasing number of nodes and renewable energy interconnections. The role of power system control center is more critical in maintaining system reliable and security operations. Latest developed information and communication technologies provide a platform to enhance the functions and performance of power system control center. Smart power dispatch concept will be the trend of future control center development. In this paper, we start from the human factors of control center design and propose operation indices to reduce the information presented to the system operator. The operation indices will be the important criteria in situation awareness of a power grid. Past, present, future and capability states of a power grid are also proposed to provide better visions to the operator of system conditions. The basic ideas of operation indices and operation states are discussed in the paper. In the end, the design factors for a power dispatch cockpit are discussed.
基金Innovation Program of Shanghai Municipal Education Commission,China(No.13YZ139)Climbing Peak Discipline Project of Shanghai Dianji University,China(No.15DFXK01)
文摘It is important to distribute the load efficiently to minimize the cost of the economic dispatch of electrical power system. The uncertainty and volatility of wind energy make the economic dispatch much more complex when the general power systems are combined with wind farms. The short term wind power prediction method was discussed in this paper. The method was based on the empirical mode decomposition (EMD) and ensemble empirical mode decomposition (EEMD). Furthermore,the effect of wind farms on the traditional economic dispatch of electrical power system was analyzed. The mathematical model of the economic dispatch was established considering the environmental factors and extra spinning reserve cost. The multi-objective co-evolutionary algorithm was used to figure out the model. And the results were compared with the NSGA-Ⅱ(non-dominated sorting genetic algorithm-Ⅱ) to verify its feasibility.
文摘National Grid is the electricity system operator in Great Britain and has an unique feature in so far as it is one of the world’s few for-profit system operators. In addition, the commercially orientation of the British market rules means that nearly every action taken by National Grid to operate the system has a cost associated to it. Based on those factors and in order to encourage National Grid to seek continuous improvements and drive for efficient and economic system operation, the regulator (Ofgem) offers an incentive scheme, whereby a target is agreed annually and any savings in relation to this target are shared between consumers and National Grid in the form of a profit. It is in National Grid’s best interest to have mechanisms to mitigate the impacts of volatility in the costs it faces as system operator so that it can implement cost saving actions without the risk of windfall losses (or gains) arising from sudden changes in uncontrollable drivers. The purpose of this paper is to share the experiences of National Grid in the operation of Great Britain's electricity system, with a special interest on the mechanisms created to manage the associated costs in response to the incentive scheme. It does so by describing the market operation in Great Britain and the costs drivers impacting National Grid’s system operation and illustrating the steps recently taken by National Grid to propose volatility mitigation mechanisms. It concludes with the rationale and expected results from the latest proposals as consulted with the industry for introduction in the incentive scheme starting on 1st April 2011. It is worth noting that with this work, the authors wish to both share the experience with other system operators and regulators in the world, as well as give British market participants an insight on the inner workings of National Grid.
基金the National Key R&D Program of China under Grant No.2020YFB0905900in part by the State Grid Corporation of China project“Research on inter-provincial price coupling mechanism of national unified electricity spot market”.
文摘For the implementation of power market in China,medium-and Iong-term security checks are essential for bilateral transactions,of which the electricity quantity that constitutes the generation feasible region(GFR)is the target.However,uncertainties from load forecasting errors and transmission contingencies are threats to medium-and Iong-term electricity tradi ng in terms of their in flue nces on the GFR.In this paper,we prese nt a graphic distortio n pattern in a typical threegenerator system using the Monte Carlo method and projection theory based on security constrained economic dispatch.The underlying potential risk to GFR from uncertainties is clearly visualized,and their impact characteristics are discussed.A case study on detailed GFR distortion was included to dem on strate the effectiveness of this visualization model.The result implies that a small uncertainty could distort the GFR to a remarkable extent and that different line-contingency precipitates disparate the GFR distortion patterns,thereby eliciting great emphasis on load forecasting and line reliability in electricity transacti ons.
文摘Electricity network is a very complex entity that comprises several components like generators, transmission lines, loads among others. As technologies continue to evolve, the complexity of the electricity network has also increased as more devices are being connected to the network. To understand the physical laws governing the operation of the network, techniques such as optimal power flow (OPF), Economic dispatch (ED) and Security constrained optimal power flow (SCOPF) were developed. These techniques have been used extensively in network operation, planning and so on. However, an in-depth presentation showcasing the merits and demerits of these techniques is still lacking in the literature. Hence, this paper intends to fill this gap. In this paper, Economic dispatch, optimal power flow and security-constrained optimal power flow are applied to a 3-bus test system using a linear programming approach. The results of the ED, OPF and SC-OPF are compared and presented.
文摘There is a false notion of existing available, abundant, and long lasting fuel energy in the Gulf Cooperation Council (GCC) Countries;with continual income return from its exports. This is not true as the sustainability of this income is questionable. Energy problems started to appear, and can be intensified in coming years due to continuous growth of energy demands and consumptions. The demands already consume all produced Natural Gas (NG) in all GCC, except Qatar;and the NG is the needed fuel for Electric Power (EP) production. These countries have to import NG to run their EP plants. Fuel oil production can be locally consumed within two to three decades if the current rate of consumed energy prevails. The returns from selling the oil and natural gas are the main income to most of the GCC. While NG and oil can be used in EP plants, NG is cheaper, cleaner, and has less negative effects on the environment than fuel oil. Moreover, oil has much better usage than being burned in steam generators of steam power plants or combustion chambers of gas turbines. Introducing renewable energy or nuclear energy may be a necessity for the GCC to keep the flow of their main income from exporting oil. This paper reviews the GCC productions and consumptions of the prime energy (fuel oil and NG) and their role in electric power production. The paper shows that, NG should be the only fossil fuel used to run the power plants in the GCC. It also shows that the all GCC except Qatar, have to import NG. They should diversify the prime energy used in power plants;and consider alternative energy such as nuclear and renewable energy, (solar and wind) energy.