Environmental stress screening (ESS) is a technological process to reduce the costly early field failure of electronic components. This paper builds an optimization model for ESS of electronic components to obtain the...Environmental stress screening (ESS) is a technological process to reduce the costly early field failure of electronic components. This paper builds an optimization model for ESS of electronic components to obtain the optimal ESS duration. The failure phenomena of ESS are modeled by mixed distribution, and optimal ESS duration is defined by maximizing life-cycle cost savings under the condition of meeting reliability requirement.展开更多
介绍了基于直流潮流的负荷削减线性规划模型和基于交流潮流的负荷削减非线性规划模型的基本原理,对它们各自的优缺点进行了分析,并使用它们对RBTS(RoyBillinton Test system)可靠性测试系统进行了评估。计算结果表明,直流潮流的负荷削...介绍了基于直流潮流的负荷削减线性规划模型和基于交流潮流的负荷削减非线性规划模型的基本原理,对它们各自的优缺点进行了分析,并使用它们对RBTS(RoyBillinton Test system)可靠性测试系统进行了评估。计算结果表明,直流潮流的负荷削减线性规划模型由于忽略了节点电压约束的影响,存在较大的模型误差,要得到精确的可靠性指标,应该使用基于交流潮流的负荷削减非线性规划模型。展开更多
文摘Environmental stress screening (ESS) is a technological process to reduce the costly early field failure of electronic components. This paper builds an optimization model for ESS of electronic components to obtain the optimal ESS duration. The failure phenomena of ESS are modeled by mixed distribution, and optimal ESS duration is defined by maximizing life-cycle cost savings under the condition of meeting reliability requirement.
文摘介绍了基于直流潮流的负荷削减线性规划模型和基于交流潮流的负荷削减非线性规划模型的基本原理,对它们各自的优缺点进行了分析,并使用它们对RBTS(RoyBillinton Test system)可靠性测试系统进行了评估。计算结果表明,直流潮流的负荷削减线性规划模型由于忽略了节点电压约束的影响,存在较大的模型误差,要得到精确的可靠性指标,应该使用基于交流潮流的负荷削减非线性规划模型。