The design of electrical layout is a key element in the offshore wind farm planning.We present a novel electrical layout design optimization method for offshore wind farms in this paper.The proposed method can be used...The design of electrical layout is a key element in the offshore wind farm planning.We present a novel electrical layout design optimization method for offshore wind farms in this paper.The proposed method can be used to generate the network model based on fuzzy c-means(FCM)and binary integer programming(BIP)methods.It can automatically allocate wind turbines to the nearest substations and obtain the topology structure of cables utilized to connect wind turbines or turbine and substation.The objective of this optimization is to minimize the investment costs of cable connection and the transmission power losses.The results of case study clearly demonstrated the feasibility of the proposed method and showed that it can be used as a reliable tool for electrical layout design of offshore wind farms.展开更多
Electric propulsion is used for all electric propulsion satellites to perform the orbit transfer,attitude control and station-keeping tasks. Generally electric propulsion subsystem contains 4 thrusters. But if one thr...Electric propulsion is used for all electric propulsion satellites to perform the orbit transfer,attitude control and station-keeping tasks. Generally electric propulsion subsystem contains 4 thrusters. But if one thruster fails in the beginning of satellite lifetime,other thrusters will undertake all the firing tasks. The firing time will be 2 to 3 times of thrusters without failure. Thus it may go beyond the allow ed lifetime of thruster. This paper puts forward two thruster redundancy configuration solutions with 6 thrusters to solve this problem. Two layout configurations and their corresponding station-keeping strategies are simulated and compared. The results show that the maximum firing time of both layout configurations can meet the lifetime limitation. This solution is a good reference for all electric propulsion satellites design.展开更多
文摘The design of electrical layout is a key element in the offshore wind farm planning.We present a novel electrical layout design optimization method for offshore wind farms in this paper.The proposed method can be used to generate the network model based on fuzzy c-means(FCM)and binary integer programming(BIP)methods.It can automatically allocate wind turbines to the nearest substations and obtain the topology structure of cables utilized to connect wind turbines or turbine and substation.The objective of this optimization is to minimize the investment costs of cable connection and the transmission power losses.The results of case study clearly demonstrated the feasibility of the proposed method and showed that it can be used as a reliable tool for electrical layout design of offshore wind farms.
文摘Electric propulsion is used for all electric propulsion satellites to perform the orbit transfer,attitude control and station-keeping tasks. Generally electric propulsion subsystem contains 4 thrusters. But if one thruster fails in the beginning of satellite lifetime,other thrusters will undertake all the firing tasks. The firing time will be 2 to 3 times of thrusters without failure. Thus it may go beyond the allow ed lifetime of thruster. This paper puts forward two thruster redundancy configuration solutions with 6 thrusters to solve this problem. Two layout configurations and their corresponding station-keeping strategies are simulated and compared. The results show that the maximum firing time of both layout configurations can meet the lifetime limitation. This solution is a good reference for all electric propulsion satellites design.