In recent years,China has made significant progress in the construction of highways,resulting in an improved highway network that has provided robust support for economic and social development.However,the rapid expan...In recent years,China has made significant progress in the construction of highways,resulting in an improved highway network that has provided robust support for economic and social development.However,the rapid expansion of highway construction,power supply,and distribution has led to several challenges in mechanical and electrical engineering technology.Ensuring the safe,stable,and cost-effective operation of the power supply and distribution system to meet the diverse requirements of highway operations has become a pressing issue.This article takes an example of a highway electromechanical engineering power supply and distribution construction project to provide insight into the construction process of highway electromechanical engineering power supply and distribution technology.展开更多
A novel three-phase traction power supply system is proposed to eliminate the adverse effects caused by electric phase separation in catenary and accomplish a unifying manner of traction power supply for rail transit....A novel three-phase traction power supply system is proposed to eliminate the adverse effects caused by electric phase separation in catenary and accomplish a unifying manner of traction power supply for rail transit.With the application of two-stage three-phase continuous power supply structure,the electrical characteristics exhibit new features differing from the existing traction system.In this work,the principle for voltage levels determining two-stage network is dissected in accordance with the requirements of traction network and electric locomotive.The equivalent model of three-phase traction system is built for deducing the formula of current distribution and voltage losses.Based on the chain network model of the traction network,a simulation model is established to analyze the electrical characteristics such as traction current distribution,voltage losses,system equivalent impedance,voltage distribution,voltage unbalance and regenerative energy utilization.In a few words,quite a lot traction current of about 99%is undertaken by long-section cable network.The proportion of system voltage losses is small attributed to the two-stage three-phase power supply structure,and the voltage unbal-ance caused by impedance asymmetry of traction network is less than 1‰.In addition,the utilization rate of regenerative energy for locomotive achieves a significant promotion of over 97%.展开更多
As a matured technique used in many fields,the distributed computer system is still a new management method for the aeronautical electrical power distribution system in our country. In this paper, a novel aircraft ele...As a matured technique used in many fields,the distributed computer system is still a new management method for the aeronautical electrical power distribution system in our country. In this paper, a novel aircraft electrical power distribution system based on the distributed computer system is proposed. The principles, features and structure of the aircraft electrical power distribution system and the distributed computer system named electrical load management system (ELMS) are studied. The ELMS composed of four electrical load management centers (ELMCs) and two power source processors (PSPs) operates in the 1553B buses. Principles of the ELMCs and the PSPs are introduced. With the application of the distributed computer system, the aircraft electrical power distribution system is simple, adaptable and flexible.展开更多
In this research, the performance of the solar thermal powered systems (STPS) is analyzed with different models (without inserts, with inserts and with Nano fluids with different concentrations) and its impact on the ...In this research, the performance of the solar thermal powered systems (STPS) is analyzed with different models (without inserts, with inserts and with Nano fluids with different concentrations) and its impact on the Electric load in a residential/Institutional Electrical Distribution system. For this purpose, the electrical and solar thermal water heater is tested and validated. Solar thermal powered systems and its impact on the Institutional electrical distribution feeders are tested and compared with the energy efficiency (EE) and cost optimization. The goal of this paper is to analyze the impact of solar thermal energy on electrical energy consumption in the electrical distribution feeder level. The electrical system cost and energy consumptions are tabulated and observed that there is a considerable savings.展开更多
With the rapid development of China's economy, the entire social requires the safety, reliability and automation of power supply and distribution system must be improved. Therefore, extensive application of PLC techn...With the rapid development of China's economy, the entire social requires the safety, reliability and automation of power supply and distribution system must be improved. Therefore, extensive application of PLC technology in power supply and distribution system has great significance to ensure normal social life and production, so as to realize the entire national economy sustained and healthy development. This paper briefly introduces the PLC technology, and with practice elaborates the applications of control technology based on PLC in power supply and distribution system fi:om the reform of low-voltage distribution system, automation management and relay protection of power supply and distribution system etc.展开更多
A 28 V-half-regulated power bus topology and an integrated PCDU (Power Conditioning and Distribution Unit) were adopted to meet the energy demand for the Chang'e 4 relay satellite.This paper first introduces the m...A 28 V-half-regulated power bus topology and an integrated PCDU (Power Conditioning and Distribution Unit) were adopted to meet the energy demand for the Chang'e 4 relay satellite.This paper first introduces the mission features and composition of the PSDS (Power Supply and Distribution System) for the Chang'e 4 relay satellite.Due to this satellite's unusual orbit,operational mode and project restrictions,special analysis and design was conducted on the PSDS from the perspective of weight-reduction,power management,and reliability and so on.Extreme low temperature storage of SA (Solar Array) was considered and how the antenna affects the SA was analyzed.A new kind of high-specific-energy 45 Ah (Ampere-hour) battery cell was used for the first time.To make sure that the satellite would successfully pass the long shadow zones,a 100% DOD (Depth of Discharge) experiment was carried out on the battery.Since the sunlight is almost always available and there are very few times for the battery to charge or discharge,battery care to extend its lifetime is also discussed.PCDU is a device that integrates power conditioning and power distribution in one unit.The PCDU on Chang'e 4 relay satellite can output more power with less weight because of the adoption of a 28 V-half-regulated power bus topology which was also used for the first time and used lighter material for its mechanical framework.Experiment under low temperature on PCDU was conducted as well and a hot backup equalizing charge technique which is beneficial to keep performance of the battery is illustrated.The power distribution module,which is a module of PCDU,enhances the power utilization security by utilizing a static impedance measurement and build-in-test to avoid possible short circuits.As for EED (Electrical Explosive Device) module,a protection plug was specially designed and three switches with different functions were connected in series to prevent the EED from exploding by error.In addition,the allowable minimum EED bus voltage for each EED was evaluated in case of low battery voltage caused by the possible postponement of the launching time.Complete verification experiments on the ground were conducted to confirm the correctness of the design and on-orbit test data conformed to the expected results and theoretical calculation.The power supply and distribution system has been working normally since the day the Chang'e 4 relay satellite was launched into space.展开更多
Purpose–Auxiliary power system is an indispensable part of the train;the auxiliary systems of both electric locomotives and EMUs mainly are powered by one of the two ways,which are either from auxiliary windings of t...Purpose–Auxiliary power system is an indispensable part of the train;the auxiliary systems of both electric locomotives and EMUs mainly are powered by one of the two ways,which are either from auxiliary windings of traction transformers or from DC-link voltage of traction converters.Powered by DC-link voltage of traction converters,the auxiliary systems were maintained of uninterruptable power supply with energy from electric braking.Meanwhile,powered by traction transformers,the auxiliary systems were always out of power while passing the neutral section of power supply grid and control system is powered by battery at this time.Design/methodology/approach–Uninterrupted power supply of auxiliary power system powered by auxiliary winding of traction transformer was studied.Failure reasons why previous solutions cannot be realized are analyzed.An uninterruptable power supply scheme for the auxiliary systems powered by auxiliary windings of traction transformers is proposed in this paper.The validity of the proposed scheme is verified by simulation and experimental results and on-site operation of an upgraded HXD3C type locomotive.This scheme is attractive for upgrading practical locomotives with the auxiliary systems powered by auxiliary windings of traction transformers.Findings–This scheme regenerates braking power supplied to auxiliary windings of traction transformers while a locomotive runs in the neutral section of the power supply grid.Control objectives of uninterrupted power supply technology are proposed,which are no overvoltage,no overcurrent and uninterrupted power supply.Originality/value–The control strategies of the scheme ensure both overvoltage free and inrush current free when a locomotive enters or leaves the neutral section.Furthermore,this scheme is cost low by employing updated control strategy of software and add both the two current sensors and two connection wires of hardware.展开更多
A novel operation control method for relay protection in flexible DC distribution networks with distributed power supply is proposed to address the issue of inaccurate fault location during relay protection,leading to...A novel operation control method for relay protection in flexible DC distribution networks with distributed power supply is proposed to address the issue of inaccurate fault location during relay protection,leading to poor performance.The method combines a fault-tolerant fault location method based on long-term and short-term memory networks to accurately locate the fault section.Then,an operation control method for relay protection based on adaptive weight and whale optimization algorithm(WOA)is used to construct an objective function considering the shortest relay protection action time and the smallest impulse current.The adaptive weight and WOA are employed to obtain the optimal strategy for relay protection operation control,reducing the action time and impulse current.Experimental results demonstrate the effectiveness of the proposed method in accurately locating faults and improving relay protection performance.The longest operation time is reduced by 4.7023 s,and the maximum impulse current is limited to 0.3 A,effectively controlling the impact of large impulse currents and enhancing control efficiency.展开更多
The current research of vehicle electrical power supply system mainly focuses on electric vehicles(EV) and hybrid electric vehicles(HEV).The vehicle electrical power supply system used in traditional fuel vehicles...The current research of vehicle electrical power supply system mainly focuses on electric vehicles(EV) and hybrid electric vehicles(HEV).The vehicle electrical power supply system used in traditional fuel vehicles is rather simple and imperfect;electrical/electronic devices(EEDs) applied in vehicles are usually directly connected with the vehicle's battery.With increasing numbers of EEDs being applied in traditional fuel vehicles,vehicle electrical power supply systems should be optimized and improved so that they can work more safely and more effectively.In this paper,a new vehicle electrical power supply system for traditional fuel vehicles,which accounts for all electrical/electronic devices and complex work conditions,is proposed based on a smart electrical/electronic device(SEED) system.Working as an independent intelligent electrical power supply network,the proposed system is isolated from the electrical control module and communication network,and access to the vehicle system is made through a bus interface.This results in a clean controller power supply with no electromagnetic interference.A new practical battery state of charge(So C) estimation method is also proposed to achieve more accurate So C estimation for lead-acid batteries in traditional fuel vehicles so that the intelligent power system can monitor the status of the battery for an over-current state in each power channel.Optimized protection methods are also used to ensure power supply safety.Experiments and tests on a traditional fuel vehicle are performed,and the results reveal that the battery So C is calculated quickly and sufficiently accurately for battery over-discharge protection.Over-current protection is achieved,and the entire vehicle's power utilization is optimized.For traditional fuel vehicles,the proposed vehicle electrical power supply system is comprehensive and has a unified system architecture,enhancing system reliability and security.展开更多
High-power electric actuators are generally used on solid propellant motors,which further enhances the requirement on onboard supply voltage and output power of a launch vehicle.In this paper,combined with the electri...High-power electric actuators are generally used on solid propellant motors,which further enhances the requirement on onboard supply voltage and output power of a launch vehicle.In this paper,combined with the electrical demand of China’s new generation solid-liquid bundled launch vehicle(LM-6 A),high-voltage battery technology,high-power switch control technology,insulation protection technology under low pressure are studied,and the key technologies and schemes are presented.The flight test of LM-6 A shows that the high-voltage power supply and distribution technology adopted is reasonable and feasible,and can be used as a reference for the designs of other launch vehicles or spacecrafts.展开更多
The high utilization level of renewable generation including residential photovoltaic (PV) systems together with the uncontrolled charging of electric vehicles (EVs) can have a significant impact on load characteristi...The high utilization level of renewable generation including residential photovoltaic (PV) systems together with the uncontrolled charging of electric vehicles (EVs) can have a significant impact on load characteristics in distribution networks. Harmonic content of PV generation, EV charging loads, and their influence on power quality indicators in residential distribution networks are discussed in this paper. For investigating likely power quality scenarios, PV generation and EV charging measurement results including current harmonic amplitude and phase angle values are used and compared with present load characteristics. Different modelling scenarios are analysed and a simplified model of harmonics in PVs and EVs is offered. The results of the study show moderate additional harmonic distortion in residential load current and voltage distortion at the substation’s busbar when PV generation and EV loading are added. The scenarios presented in this paper can be further used for modelling the actual harmonic loads of the PVs and EVs in distribution networks.展开更多
The study presents possibilities for reconstruction of electric power supply systems in Bulgarian Black Sea resorts and possibilities to use statistical methods in energy planning. The paper shows the use of classic s...The study presents possibilities for reconstruction of electric power supply systems in Bulgarian Black Sea resorts and possibilities to use statistical methods in energy planning. The paper shows the use of classic statistical methods in combination with advanced digital measurement systems in order to obtain the correlation dependencies, nature of energy consumption and opportunities for energy forecasting. The main purpose of the study is to obtain statistical dependencies of the nature of power consumption and correlations between electricity consumption and ambient temperature in order to improve the accuracy of energy planning. The analysis includes application of energy management systems for proper energy planning, improving economical efficiency and reducing power and energy losses.展开更多
Lack of up-to-date information on efficient operation and maintenance of EPDS (electric power distribution systems), Nigeria is addressed by designing and implementing an indigenous real-time monitoring and diagnosi...Lack of up-to-date information on efficient operation and maintenance of EPDS (electric power distribution systems), Nigeria is addressed by designing and implementing an indigenous real-time monitoring and diagnosis system. The system encompasses the development of software driven hardware positioned at the remotely located sub-stations at the low voltage level to keep track of the network in real-time. The detection of faults exploits threshold passing algorithm through continuous monitoring of the network power quality. Communication between the RTU (remote terminal unit) and the DCC (distribution control center) which is based on GSM is initiated by disturbance. The DCC performs fault evaluation processing using the received data and predetermined faults signatures to determine the nature of disturbance and presents the result in graphic user interface environment. A fault reporting time of 2 s was achieved. The developed system exhibits a high degree of accuracy and manifests no spurious reports during testing. The resultant system limits the effects of interruption and increases power availability by reducing the down time. The system strengthens engineering and management capabilities required to enhance reliability by providing information about the network health status.展开更多
The power supply system of ion source for the Neutral Beam Injector (NBI) in the HT-7 superconducting tokamak is based on a single injector with one ion source that can deliver 700 kW of neutral beam power. Experiment...The power supply system of ion source for the Neutral Beam Injector (NBI) in the HT-7 superconducting tokamak is based on a single injector with one ion source that can deliver 700 kW of neutral beam power. Experiments and a discharges test on the ion source were successfully performed. In this paper, the circuit structures and features of every power supply are described and the results of the discharges test are presented.展开更多
Based on the two-stage Stackelberg game method, value creation of supply chain cooperation between coal enterprise and power utilities is studied by formulating profit functions of coal and power enterprises and calcu...Based on the two-stage Stackelberg game method, value creation of supply chain cooperation between coal enterprise and power utilities is studied by formulating profit functions of coal and power enterprises and calculating the maximum profit. According to the analysis, it is found that the profit from supply chain cooperation between coal and power enterprises is more than that of non- cooperation. The cooperation is validated to be beneficial for both units; however, the profit is mainly taken by the power enterprise. Thus, it is necessary to set up the incentive mechanism to distribute cooperation value between coal and power enterprises to promote their continual cooperation.展开更多
Conventional maintenance mode for the traction power supply system(TPSS)is to perform scheduled regular maintenance activities for power supply equipment,while such maintenance mode may result in undue maintenance tas...Conventional maintenance mode for the traction power supply system(TPSS)is to perform scheduled regular maintenance activities for power supply equipment,while such maintenance mode may result in undue maintenance tasks and low efficiency due to different degradation processes of different sorts of equipment.To address this problem,this paper introduces a preventive opportunistic maintenance(POM)method for TPSS based on equipment reliability.Firstly,a POM model is established by considering the equipment reliability degradation process based on Weibull distribution.Then,by considering the total power outage time in the planned operation cycle of TPSS as the optimization objective,the optimal maintenance scheme of TPSS is formulated by iterative method of maintenance strategies.The proposed method is verified by introducing practical maintenance strategies and fault record data of the traction transformer,circuit breaker and disconnector in an actual TPSS of a railway administration.Results show that the presented method can make full use of the existing fault data to develop a POM scheme for TPSS.It can improve maintenance efficiency and reduce power outage time,providing guidance to formulate scientific maintenance strategies for TPSS.展开更多
During faults in a distribution network,the output power of a distributed generation(DG)may be uncertain.Moreover,the output currents of distributed power sources are also affected by the output power,resulting in unc...During faults in a distribution network,the output power of a distributed generation(DG)may be uncertain.Moreover,the output currents of distributed power sources are also affected by the output power,resulting in uncertainties in the calculation of the short-circuit current at the time of a fault.Additionally,the impacts of such uncertainties around short-circuit currents will increase with the increase of distributed power sources.Thus,it is very important to develop a method for calculating the short-circuit current while considering the uncertainties in a distribution network.In this study,an affine arithmetic algorithm for calculating short-circuit current intervals in distribution networks with distributed power sources while considering power fluctuations is presented.The proposed algorithm includes two stages.In the first stage,normal operations are considered to establish a conservative interval affine optimization model of injection currents in distributed power sources.Constrained by the fluctuation range of distributed generation power at the moment of fault occurrence,the model can then be used to solve for the fluctuation range of injected current amplitudes in distributed power sources.The second stage is implemented after a malfunction occurs.In this stage,an affine optimization model is first established.This model is developed to characterizes the short-circuit current interval of a transmission line,and is constrained by the fluctuation range of the injected current amplitude of DG during normal operations.Finally,the range of the short-circuit current amplitudes of distribution network lines after a short-circuit fault occurs is predicted.The algorithm proposed in this article obtains an interval range containing accurate results through interval operation.Compared with traditional point value calculation methods,interval calculation methods can provide more reliable analysis and calculation results.The range of short-circuit current amplitude obtained by this algorithm is slightly larger than those obtained using the Monte Carlo algorithm and the Latin hypercube sampling algorithm.Therefore,the proposed algorithm has good suitability and does not require iterative calculations,resulting in a significant improvement in computational speed compared to the Monte Carlo algorithm and the Latin hypercube sampling algorithm.Furthermore,the proposed algorithm can provide more reliable analysis and calculation results,improving the safety and stability of power systems.展开更多
Multi-converter approach based on the series and parallel connection topology of modular power converters has been proposed to realize higher power density DC-DC converter. The availability of the proposed approach ha...Multi-converter approach based on the series and parallel connection topology of modular power converters has been proposed to realize higher power density DC-DC converter. The availability of the proposed approach has been verified through the design consideration and the experiment. The design consideration for two DC-DC converters has been carried out by utilizing the power converter exact loss simulator, and the design parameters to maximize their power densities have been extracted taking the trade-off between the conversion efficiency and the power density into account. The prototypes of a 2,400 W, 256-384 V boost chopper using SiC-MOSFETs and a 300 W, 32-48 V GaN-FETs boost chopper have been also developed based on the design. The SiC chopper achieved the efficiency of 97.8% and the power density of 12,8 W/cm3, and the GaN chopper accomplished 98.9% and 18.6 W/cm3 in the experiment. These results show the validity of the design and the availability of the proposed approach. The multi-converter approach enables the cost reduction of the modular power converters, and contributes to realizing the widespread use of power electronics converters in the future 380 V DC distribution system.展开更多
In order to testify and examine the ability and correctness of an expert system for diagnosing the faults in the electrical power system of a certain kind of satellite, the authors have developed a simulated testbed a...In order to testify and examine the ability and correctness of an expert system for diagnosing the faults in the electrical power system of a certain kind of satellite, the authors have developed a simulated testbed according to the operational principle of the electrical power system. This paper takes the solar battery array as an instance to introduce the designing principle of its hardware circuits, and presents the methods to design the interface and the software program of the single-chip microprocessor system. The software scheme of the upper computer is introduced at the end of this paper. It has been proved that this simulated system could effectively achieve the complete functions coupled with the simple design by using of various mature techniques in the fields of electronic circuits, single-chip microprocessor and numerical emulation.展开更多
High Speed Drilling Electrical Discharge Machining (HSDEDM) uses controlled electric sparks to erode the metal in a work-piece. Through the years, HSDEDM process has widely been used in high speed drilling and in manu...High Speed Drilling Electrical Discharge Machining (HSDEDM) uses controlled electric sparks to erode the metal in a work-piece. Through the years, HSDEDM process has widely been used in high speed drilling and in manufacturing large aspect ratio holes for hard-to-machine material. The power supplies of HSDEDM providing high power applica-tions can have different topologies. In this paper, a novel Pulsed-Width-Modulated (PWM) half-bridge HSDEDM power supply that achieves Zero-Voltage-Switching (ZVS) for switches and Zero-Current-Switching (ZCS) for the dis-charge gap has been developed. This power supply has excellent features that include minimal component count and inherent protection under short circuit conditions. This topology has an energy conservation feature and removes the need for output bulk capacitors and resistances. Energy used in the erosion process will be controlled by the switched IGBTs in the half-bridge network and be transferred to the gap between the tool and work-piece. The relative tool wear and machining speed of our proposed topology have been compared with that of a normal power supply with current limiting resistances.展开更多
文摘In recent years,China has made significant progress in the construction of highways,resulting in an improved highway network that has provided robust support for economic and social development.However,the rapid expansion of highway construction,power supply,and distribution has led to several challenges in mechanical and electrical engineering technology.Ensuring the safe,stable,and cost-effective operation of the power supply and distribution system to meet the diverse requirements of highway operations has become a pressing issue.This article takes an example of a highway electromechanical engineering power supply and distribution construction project to provide insight into the construction process of highway electromechanical engineering power supply and distribution technology.
基金This research was supported by the Science and Technology Plan Project of Sichuan Province(No.21YYJC3324)the Science and Technology Plan Project of Sichuan Province(No.2022YFQ0104).
文摘A novel three-phase traction power supply system is proposed to eliminate the adverse effects caused by electric phase separation in catenary and accomplish a unifying manner of traction power supply for rail transit.With the application of two-stage three-phase continuous power supply structure,the electrical characteristics exhibit new features differing from the existing traction system.In this work,the principle for voltage levels determining two-stage network is dissected in accordance with the requirements of traction network and electric locomotive.The equivalent model of three-phase traction system is built for deducing the formula of current distribution and voltage losses.Based on the chain network model of the traction network,a simulation model is established to analyze the electrical characteristics such as traction current distribution,voltage losses,system equivalent impedance,voltage distribution,voltage unbalance and regenerative energy utilization.In a few words,quite a lot traction current of about 99%is undertaken by long-section cable network.The proportion of system voltage losses is small attributed to the two-stage three-phase power supply structure,and the voltage unbal-ance caused by impedance asymmetry of traction network is less than 1‰.In addition,the utilization rate of regenerative energy for locomotive achieves a significant promotion of over 97%.
文摘As a matured technique used in many fields,the distributed computer system is still a new management method for the aeronautical electrical power distribution system in our country. In this paper, a novel aircraft electrical power distribution system based on the distributed computer system is proposed. The principles, features and structure of the aircraft electrical power distribution system and the distributed computer system named electrical load management system (ELMS) are studied. The ELMS composed of four electrical load management centers (ELMCs) and two power source processors (PSPs) operates in the 1553B buses. Principles of the ELMCs and the PSPs are introduced. With the application of the distributed computer system, the aircraft electrical power distribution system is simple, adaptable and flexible.
文摘In this research, the performance of the solar thermal powered systems (STPS) is analyzed with different models (without inserts, with inserts and with Nano fluids with different concentrations) and its impact on the Electric load in a residential/Institutional Electrical Distribution system. For this purpose, the electrical and solar thermal water heater is tested and validated. Solar thermal powered systems and its impact on the Institutional electrical distribution feeders are tested and compared with the energy efficiency (EE) and cost optimization. The goal of this paper is to analyze the impact of solar thermal energy on electrical energy consumption in the electrical distribution feeder level. The electrical system cost and energy consumptions are tabulated and observed that there is a considerable savings.
文摘With the rapid development of China's economy, the entire social requires the safety, reliability and automation of power supply and distribution system must be improved. Therefore, extensive application of PLC technology in power supply and distribution system has great significance to ensure normal social life and production, so as to realize the entire national economy sustained and healthy development. This paper briefly introduces the PLC technology, and with practice elaborates the applications of control technology based on PLC in power supply and distribution system fi:om the reform of low-voltage distribution system, automation management and relay protection of power supply and distribution system etc.
文摘A 28 V-half-regulated power bus topology and an integrated PCDU (Power Conditioning and Distribution Unit) were adopted to meet the energy demand for the Chang'e 4 relay satellite.This paper first introduces the mission features and composition of the PSDS (Power Supply and Distribution System) for the Chang'e 4 relay satellite.Due to this satellite's unusual orbit,operational mode and project restrictions,special analysis and design was conducted on the PSDS from the perspective of weight-reduction,power management,and reliability and so on.Extreme low temperature storage of SA (Solar Array) was considered and how the antenna affects the SA was analyzed.A new kind of high-specific-energy 45 Ah (Ampere-hour) battery cell was used for the first time.To make sure that the satellite would successfully pass the long shadow zones,a 100% DOD (Depth of Discharge) experiment was carried out on the battery.Since the sunlight is almost always available and there are very few times for the battery to charge or discharge,battery care to extend its lifetime is also discussed.PCDU is a device that integrates power conditioning and power distribution in one unit.The PCDU on Chang'e 4 relay satellite can output more power with less weight because of the adoption of a 28 V-half-regulated power bus topology which was also used for the first time and used lighter material for its mechanical framework.Experiment under low temperature on PCDU was conducted as well and a hot backup equalizing charge technique which is beneficial to keep performance of the battery is illustrated.The power distribution module,which is a module of PCDU,enhances the power utilization security by utilizing a static impedance measurement and build-in-test to avoid possible short circuits.As for EED (Electrical Explosive Device) module,a protection plug was specially designed and three switches with different functions were connected in series to prevent the EED from exploding by error.In addition,the allowable minimum EED bus voltage for each EED was evaluated in case of low battery voltage caused by the possible postponement of the launching time.Complete verification experiments on the ground were conducted to confirm the correctness of the design and on-orbit test data conformed to the expected results and theoretical calculation.The power supply and distribution system has been working normally since the day the Chang'e 4 relay satellite was launched into space.
文摘Purpose–Auxiliary power system is an indispensable part of the train;the auxiliary systems of both electric locomotives and EMUs mainly are powered by one of the two ways,which are either from auxiliary windings of traction transformers or from DC-link voltage of traction converters.Powered by DC-link voltage of traction converters,the auxiliary systems were maintained of uninterruptable power supply with energy from electric braking.Meanwhile,powered by traction transformers,the auxiliary systems were always out of power while passing the neutral section of power supply grid and control system is powered by battery at this time.Design/methodology/approach–Uninterrupted power supply of auxiliary power system powered by auxiliary winding of traction transformer was studied.Failure reasons why previous solutions cannot be realized are analyzed.An uninterruptable power supply scheme for the auxiliary systems powered by auxiliary windings of traction transformers is proposed in this paper.The validity of the proposed scheme is verified by simulation and experimental results and on-site operation of an upgraded HXD3C type locomotive.This scheme is attractive for upgrading practical locomotives with the auxiliary systems powered by auxiliary windings of traction transformers.Findings–This scheme regenerates braking power supplied to auxiliary windings of traction transformers while a locomotive runs in the neutral section of the power supply grid.Control objectives of uninterrupted power supply technology are proposed,which are no overvoltage,no overcurrent and uninterrupted power supply.Originality/value–The control strategies of the scheme ensure both overvoltage free and inrush current free when a locomotive enters or leaves the neutral section.Furthermore,this scheme is cost low by employing updated control strategy of software and add both the two current sensors and two connection wires of hardware.
文摘A novel operation control method for relay protection in flexible DC distribution networks with distributed power supply is proposed to address the issue of inaccurate fault location during relay protection,leading to poor performance.The method combines a fault-tolerant fault location method based on long-term and short-term memory networks to accurately locate the fault section.Then,an operation control method for relay protection based on adaptive weight and whale optimization algorithm(WOA)is used to construct an objective function considering the shortest relay protection action time and the smallest impulse current.The adaptive weight and WOA are employed to obtain the optimal strategy for relay protection operation control,reducing the action time and impulse current.Experimental results demonstrate the effectiveness of the proposed method in accurately locating faults and improving relay protection performance.The longest operation time is reduced by 4.7023 s,and the maximum impulse current is limited to 0.3 A,effectively controlling the impact of large impulse currents and enhancing control efficiency.
基金Supported by Collaborative Innovation Center of Intelligent New Energy Vehicle of U.S.and China-Clean Energy Research Center,Fund of China Scholarship Council(Grant No.201406215015)
文摘The current research of vehicle electrical power supply system mainly focuses on electric vehicles(EV) and hybrid electric vehicles(HEV).The vehicle electrical power supply system used in traditional fuel vehicles is rather simple and imperfect;electrical/electronic devices(EEDs) applied in vehicles are usually directly connected with the vehicle's battery.With increasing numbers of EEDs being applied in traditional fuel vehicles,vehicle electrical power supply systems should be optimized and improved so that they can work more safely and more effectively.In this paper,a new vehicle electrical power supply system for traditional fuel vehicles,which accounts for all electrical/electronic devices and complex work conditions,is proposed based on a smart electrical/electronic device(SEED) system.Working as an independent intelligent electrical power supply network,the proposed system is isolated from the electrical control module and communication network,and access to the vehicle system is made through a bus interface.This results in a clean controller power supply with no electromagnetic interference.A new practical battery state of charge(So C) estimation method is also proposed to achieve more accurate So C estimation for lead-acid batteries in traditional fuel vehicles so that the intelligent power system can monitor the status of the battery for an over-current state in each power channel.Optimized protection methods are also used to ensure power supply safety.Experiments and tests on a traditional fuel vehicle are performed,and the results reveal that the battery So C is calculated quickly and sufficiently accurately for battery over-discharge protection.Over-current protection is achieved,and the entire vehicle's power utilization is optimized.For traditional fuel vehicles,the proposed vehicle electrical power supply system is comprehensive and has a unified system architecture,enhancing system reliability and security.
文摘High-power electric actuators are generally used on solid propellant motors,which further enhances the requirement on onboard supply voltage and output power of a launch vehicle.In this paper,combined with the electrical demand of China’s new generation solid-liquid bundled launch vehicle(LM-6 A),high-voltage battery technology,high-power switch control technology,insulation protection technology under low pressure are studied,and the key technologies and schemes are presented.The flight test of LM-6 A shows that the high-voltage power supply and distribution technology adopted is reasonable and feasible,and can be used as a reference for the designs of other launch vehicles or spacecrafts.
文摘The high utilization level of renewable generation including residential photovoltaic (PV) systems together with the uncontrolled charging of electric vehicles (EVs) can have a significant impact on load characteristics in distribution networks. Harmonic content of PV generation, EV charging loads, and their influence on power quality indicators in residential distribution networks are discussed in this paper. For investigating likely power quality scenarios, PV generation and EV charging measurement results including current harmonic amplitude and phase angle values are used and compared with present load characteristics. Different modelling scenarios are analysed and a simplified model of harmonics in PVs and EVs is offered. The results of the study show moderate additional harmonic distortion in residential load current and voltage distortion at the substation’s busbar when PV generation and EV loading are added. The scenarios presented in this paper can be further used for modelling the actual harmonic loads of the PVs and EVs in distribution networks.
文摘The study presents possibilities for reconstruction of electric power supply systems in Bulgarian Black Sea resorts and possibilities to use statistical methods in energy planning. The paper shows the use of classic statistical methods in combination with advanced digital measurement systems in order to obtain the correlation dependencies, nature of energy consumption and opportunities for energy forecasting. The main purpose of the study is to obtain statistical dependencies of the nature of power consumption and correlations between electricity consumption and ambient temperature in order to improve the accuracy of energy planning. The analysis includes application of energy management systems for proper energy planning, improving economical efficiency and reducing power and energy losses.
文摘Lack of up-to-date information on efficient operation and maintenance of EPDS (electric power distribution systems), Nigeria is addressed by designing and implementing an indigenous real-time monitoring and diagnosis system. The system encompasses the development of software driven hardware positioned at the remotely located sub-stations at the low voltage level to keep track of the network in real-time. The detection of faults exploits threshold passing algorithm through continuous monitoring of the network power quality. Communication between the RTU (remote terminal unit) and the DCC (distribution control center) which is based on GSM is initiated by disturbance. The DCC performs fault evaluation processing using the received data and predetermined faults signatures to determine the nature of disturbance and presents the result in graphic user interface environment. A fault reporting time of 2 s was achieved. The developed system exhibits a high degree of accuracy and manifests no spurious reports during testing. The resultant system limits the effects of interruption and increases power availability by reducing the down time. The system strengthens engineering and management capabilities required to enhance reliability by providing information about the network health status.
基金The project supported by the Chinese Academy of Sciences (No. SYKXD04)
文摘The power supply system of ion source for the Neutral Beam Injector (NBI) in the HT-7 superconducting tokamak is based on a single injector with one ion source that can deliver 700 kW of neutral beam power. Experiments and a discharges test on the ion source were successfully performed. In this paper, the circuit structures and features of every power supply are described and the results of the discharges test are presented.
文摘Based on the two-stage Stackelberg game method, value creation of supply chain cooperation between coal enterprise and power utilities is studied by formulating profit functions of coal and power enterprises and calculating the maximum profit. According to the analysis, it is found that the profit from supply chain cooperation between coal and power enterprises is more than that of non- cooperation. The cooperation is validated to be beneficial for both units; however, the profit is mainly taken by the power enterprise. Thus, it is necessary to set up the incentive mechanism to distribute cooperation value between coal and power enterprises to promote their continual cooperation.
基金the National Natural Science Foundation of China under Grant(51907166)the Science and Technology Project of CHINA RAILWAY under Grant(2017J001-F&N2018G023)the Sichuan Science and Technology Program under Grant(2018GZ0020).
文摘Conventional maintenance mode for the traction power supply system(TPSS)is to perform scheduled regular maintenance activities for power supply equipment,while such maintenance mode may result in undue maintenance tasks and low efficiency due to different degradation processes of different sorts of equipment.To address this problem,this paper introduces a preventive opportunistic maintenance(POM)method for TPSS based on equipment reliability.Firstly,a POM model is established by considering the equipment reliability degradation process based on Weibull distribution.Then,by considering the total power outage time in the planned operation cycle of TPSS as the optimization objective,the optimal maintenance scheme of TPSS is formulated by iterative method of maintenance strategies.The proposed method is verified by introducing practical maintenance strategies and fault record data of the traction transformer,circuit breaker and disconnector in an actual TPSS of a railway administration.Results show that the presented method can make full use of the existing fault data to develop a POM scheme for TPSS.It can improve maintenance efficiency and reduce power outage time,providing guidance to formulate scientific maintenance strategies for TPSS.
基金This article was supported by the general project“Research on Wind and Photovoltaic Fault Characteristics and Practical Short Circuit Calculation Model”(521820200097)of Jiangxi Electric Power Company.
文摘During faults in a distribution network,the output power of a distributed generation(DG)may be uncertain.Moreover,the output currents of distributed power sources are also affected by the output power,resulting in uncertainties in the calculation of the short-circuit current at the time of a fault.Additionally,the impacts of such uncertainties around short-circuit currents will increase with the increase of distributed power sources.Thus,it is very important to develop a method for calculating the short-circuit current while considering the uncertainties in a distribution network.In this study,an affine arithmetic algorithm for calculating short-circuit current intervals in distribution networks with distributed power sources while considering power fluctuations is presented.The proposed algorithm includes two stages.In the first stage,normal operations are considered to establish a conservative interval affine optimization model of injection currents in distributed power sources.Constrained by the fluctuation range of distributed generation power at the moment of fault occurrence,the model can then be used to solve for the fluctuation range of injected current amplitudes in distributed power sources.The second stage is implemented after a malfunction occurs.In this stage,an affine optimization model is first established.This model is developed to characterizes the short-circuit current interval of a transmission line,and is constrained by the fluctuation range of the injected current amplitude of DG during normal operations.Finally,the range of the short-circuit current amplitudes of distribution network lines after a short-circuit fault occurs is predicted.The algorithm proposed in this article obtains an interval range containing accurate results through interval operation.Compared with traditional point value calculation methods,interval calculation methods can provide more reliable analysis and calculation results.The range of short-circuit current amplitude obtained by this algorithm is slightly larger than those obtained using the Monte Carlo algorithm and the Latin hypercube sampling algorithm.Therefore,the proposed algorithm has good suitability and does not require iterative calculations,resulting in a significant improvement in computational speed compared to the Monte Carlo algorithm and the Latin hypercube sampling algorithm.Furthermore,the proposed algorithm can provide more reliable analysis and calculation results,improving the safety and stability of power systems.
文摘Multi-converter approach based on the series and parallel connection topology of modular power converters has been proposed to realize higher power density DC-DC converter. The availability of the proposed approach has been verified through the design consideration and the experiment. The design consideration for two DC-DC converters has been carried out by utilizing the power converter exact loss simulator, and the design parameters to maximize their power densities have been extracted taking the trade-off between the conversion efficiency and the power density into account. The prototypes of a 2,400 W, 256-384 V boost chopper using SiC-MOSFETs and a 300 W, 32-48 V GaN-FETs boost chopper have been also developed based on the design. The SiC chopper achieved the efficiency of 97.8% and the power density of 12,8 W/cm3, and the GaN chopper accomplished 98.9% and 18.6 W/cm3 in the experiment. These results show the validity of the design and the availability of the proposed approach. The multi-converter approach enables the cost reduction of the modular power converters, and contributes to realizing the widespread use of power electronics converters in the future 380 V DC distribution system.
文摘In order to testify and examine the ability and correctness of an expert system for diagnosing the faults in the electrical power system of a certain kind of satellite, the authors have developed a simulated testbed according to the operational principle of the electrical power system. This paper takes the solar battery array as an instance to introduce the designing principle of its hardware circuits, and presents the methods to design the interface and the software program of the single-chip microprocessor system. The software scheme of the upper computer is introduced at the end of this paper. It has been proved that this simulated system could effectively achieve the complete functions coupled with the simple design by using of various mature techniques in the fields of electronic circuits, single-chip microprocessor and numerical emulation.
文摘High Speed Drilling Electrical Discharge Machining (HSDEDM) uses controlled electric sparks to erode the metal in a work-piece. Through the years, HSDEDM process has widely been used in high speed drilling and in manufacturing large aspect ratio holes for hard-to-machine material. The power supplies of HSDEDM providing high power applica-tions can have different topologies. In this paper, a novel Pulsed-Width-Modulated (PWM) half-bridge HSDEDM power supply that achieves Zero-Voltage-Switching (ZVS) for switches and Zero-Current-Switching (ZCS) for the dis-charge gap has been developed. This power supply has excellent features that include minimal component count and inherent protection under short circuit conditions. This topology has an energy conservation feature and removes the need for output bulk capacitors and resistances. Energy used in the erosion process will be controlled by the switched IGBTs in the half-bridge network and be transferred to the gap between the tool and work-piece. The relative tool wear and machining speed of our proposed topology have been compared with that of a normal power supply with current limiting resistances.