Time stress includes all kinds of environment and operating stress such as shock, vibration, temperature and electric current that the electromechanical system suffers in the manufacture, transport and operating proce...Time stress includes all kinds of environment and operating stress such as shock, vibration, temperature and electric current that the electromechanical system suffers in the manufacture, transport and operating process. In this paper, the conception of time stress and prognostics and health management ( PHM) system are introduced. Then, in order to improve the false alarm recognition and fault prediction capabilities of the electromechanical equipment, a novel PHM architecture for electromechanical equipment is put forward based on a built-in test (BIT) system design technology and time stress analysis method. Finally, the structure, the design and implementing method and the functions of each module of this PHM system are described in detail.展开更多
In this paper, a method of intelligent fault tolerant management on electromechanical equipment is presented. It is based on condition monitoring of equipment and realized by condition prediction and condition contro...In this paper, a method of intelligent fault tolerant management on electromechanical equipment is presented. It is based on condition monitoring of equipment and realized by condition prediction and condition control. An example is introduced and analyzed in this paper.展开更多
With the development of electronic equipment to high accuracy, high density, high frequency, and atrocious ser- vice environment, the functional surface in this type of equipment has increasingly serious problems,
文摘Time stress includes all kinds of environment and operating stress such as shock, vibration, temperature and electric current that the electromechanical system suffers in the manufacture, transport and operating process. In this paper, the conception of time stress and prognostics and health management ( PHM) system are introduced. Then, in order to improve the false alarm recognition and fault prediction capabilities of the electromechanical equipment, a novel PHM architecture for electromechanical equipment is put forward based on a built-in test (BIT) system design technology and time stress analysis method. Finally, the structure, the design and implementing method and the functions of each module of this PHM system are described in detail.
文摘In this paper, a method of intelligent fault tolerant management on electromechanical equipment is presented. It is based on condition monitoring of equipment and realized by condition prediction and condition control. An example is introduced and analyzed in this paper.
文摘With the development of electronic equipment to high accuracy, high density, high frequency, and atrocious ser- vice environment, the functional surface in this type of equipment has increasingly serious problems,