In this paper,the following problems are discussed:the mounting conditionsof three probes,the transmission characteristics of measuring system,the elimination ofmounting eccentricity,and so forth.The measures for solv...In this paper,the following problems are discussed:the mounting conditionsof three probes,the transmission characteristics of measuring system,the elimination ofmounting eccentricity,and so forth.The measures for solving these problems are also pres-ented.At last,the author gives some ideas about the solubility and the correlations of theoutput equations.展开更多
The BeiDou-3 navigation satellite system(BDS-3)provides a full-domain high-precision positioning service for the power system to ensure safe and stable operation.However,BDS-3 power system positioning faces certain ch...The BeiDou-3 navigation satellite system(BDS-3)provides a full-domain high-precision positioning service for the power system to ensure safe and stable operation.However,BDS-3 power system positioning faces certain challenges,such as complex electromagnetic interference and incomplete error elimination.Herein,a back propagation neural network-improved least mean square(BP-LMS)adaptive filtering method is proposed for the BDS-3 full-domain and high-precision power system positioning,which utilizes the loss function to update the weight of the BP hidden layer,computes the pseudo compensation range,and eliminates the impact of electromagnetic interference to enhance the accuracy of power system positioning.Simulation results confirm the superior performance of BP-LMS in positioning accuracy and error elimination.Compared with LMS and normalized least mean square(NLMS),the filtering error of the proposed BP-LMS adaptive filtering method is decreased by 57.14%and 51.38%,respectively.展开更多
The checking survey in Open mine is one of the most frequent and important work.It plays the role of forming a connecting link between open mine planning and pro- duction.Traditional checking method has such disadvant...The checking survey in Open mine is one of the most frequent and important work.It plays the role of forming a connecting link between open mine planning and pro- duction.Traditional checking method has such disadvantages as long time consumption, heavy workload,complicated calculating process,and lower automation.Used GPS and GIS technologies to systematically study the core issues of checking survey in open mine. A detail GPS data acquisition coding scheme was presented.Based on the scheme an algorithm used for computer semiautomatic cartography was made.Three methods used for eliminating gross errors from raw data which were needed for creating DEM was dis- cussed.Two algorithms were researched and realized which can be used to create open mine fine DEM model with constrained conditions and to dynamically update the model. The precision analysis and evaluation of the created model were carried out.展开更多
The prediction process often runs with small samples and under-sufficient information.To target this problem,we propose a performance comparison study that combines prediction and optimization algorithms based on expe...The prediction process often runs with small samples and under-sufficient information.To target this problem,we propose a performance comparison study that combines prediction and optimization algorithms based on experimental data analysis.Through a large number of prediction and optimization experiments,the accuracy and stability of the prediction method and the correction ability of the optimization method are studied.First,five traditional single-item prediction methods are used to process small samples with under-sufficient information,and the standard deviation method is used to assign weights on the five methods for combined forecasting.The accuracy of the prediction results is ranked.The mean and variance of the rankings reflect the accuracy and stability of the prediction method.Second,the error elimination prediction optimization method is proposed.To make,the prediction results are corrected by error elimination optimization method(EEOM),Markov optimization and two-layer optimization separately to obtain more accurate prediction results.The degree improvement and decline are used to reflect the correction ability of the optimization method.The results show that the accuracy and stability of combined prediction are the best in the prediction methods,and the correction ability of error elimination optimization is the best in the optimization methods.The combination of the two methods can well solve the problem of prediction with small samples and under-sufficient information.Finally,the accuracy of the combination of the combined prediction and the error elimination optimization is verified by predicting the number of unsafe events in civil aviation in a certain year.展开更多
Several results on optical-axis perturbation and elimination of the mismatching error C of a monolithic triaxial ring resonator (MTRR) are reported. Based on the augmented 5×5 ray matrix method, by simultaneous...Several results on optical-axis perturbation and elimination of the mismatching error C of a monolithic triaxial ring resonator (MTRR) are reported. Based on the augmented 5×5 ray matrix method, by simultaneously considering axial displacement of a mirror and the misalignments in three planar square ring resonators of a MTRR, the rules of optical-axis perturbation are obtained. The mismatching error C of the MTRR is eliminated. The results obtained are important for cavity design, as well as in the improvement and alignment of MTRR.展开更多
Aiming at regional services,the space segment of COMPASS (Phase I) satellite navigation system is a constellation of Geostationary Earth Orbit (GEO),Inclined Geostationary Earth Orbit (IGSO) and Medium Earth Orbit (ME...Aiming at regional services,the space segment of COMPASS (Phase I) satellite navigation system is a constellation of Geostationary Earth Orbit (GEO),Inclined Geostationary Earth Orbit (IGSO) and Medium Earth Orbit (MEO) satellites.Precise orbit determination (POD) for the satellites is limited by the geographic distribution of regional tracking stations.Independent time synchronization (TS) system is developed to supplement the regional tracking network,and satellite clock errors and orbit data may be obtained by simultaneously processing both tracking data and TS data.Consequently,inconsistency between tracking system and TS system caused by remaining instrumental errors not calibrated may decrease navigation accuracy.On the other hand,POD for the mixed constellation of GEO/IGSO/MEO with the regional tracking network leads to parameter estimations that are highly correlated.Notorious example of correlation is found between GEO's orbital elements and its clock errors.We estimate orbital elements and clock errors for a 3GEO+2IGSO constellation in this study using a multi-satellite precise orbit determination (MPOD) strategy,with which clock error elimination algorithm is applied to separate orbital and clock estimates to improve numerical efficiency.Satellite Laser Ranging (SLR) data are used to evaluate User Ranging Error (URE),which is the orbital error projected on a receiver's line-of-sight direction.Two-way radio-wave time transfer measurements are used to evaluate clock errors.Experimenting with data from the regional tracking network,we conclude that the fitting of code data is better than 1 m in terms of Root-Mean-Square (RMS),and fitting of carrier phase is better than 1 cm.For orbital evaluation,difference between computed receiver-satellite ranging based on estimated orbits and SLR measurements is better than 1 m (RMS).For clock estimates evaluation,2-hour linear-fitting shows that the satellite clock rates are about 1.E-10 s/s,while receiver clock rates are about 1×10 13-1×10 12 s/s.For the 72-hour POD experiment,the average differences between POD satellite clock rates estimates and clock measurements based on TS system are about 1×10 13 s/s,and for receiver clock rates,the differences are about 1×10 15 s/s.展开更多
文摘In this paper,the following problems are discussed:the mounting conditionsof three probes,the transmission characteristics of measuring system,the elimination ofmounting eccentricity,and so forth.The measures for solving these problems are also pres-ented.At last,the author gives some ideas about the solubility and the correlations of theoutput equations.
基金supported by the Science and Technology Project of the China Southern Power Grid Company Limited under Grant Number(GDKJXM20202001).
文摘The BeiDou-3 navigation satellite system(BDS-3)provides a full-domain high-precision positioning service for the power system to ensure safe and stable operation.However,BDS-3 power system positioning faces certain challenges,such as complex electromagnetic interference and incomplete error elimination.Herein,a back propagation neural network-improved least mean square(BP-LMS)adaptive filtering method is proposed for the BDS-3 full-domain and high-precision power system positioning,which utilizes the loss function to update the weight of the BP hidden layer,computes the pseudo compensation range,and eliminates the impact of electromagnetic interference to enhance the accuracy of power system positioning.Simulation results confirm the superior performance of BP-LMS in positioning accuracy and error elimination.Compared with LMS and normalized least mean square(NLMS),the filtering error of the proposed BP-LMS adaptive filtering method is decreased by 57.14%and 51.38%,respectively.
基金the Ph.D.Program Research Foundation from MOE of China(20060147004)Research Foundation from Liaoning Technical University(04A02001)
文摘The checking survey in Open mine is one of the most frequent and important work.It plays the role of forming a connecting link between open mine planning and pro- duction.Traditional checking method has such disadvantages as long time consumption, heavy workload,complicated calculating process,and lower automation.Used GPS and GIS technologies to systematically study the core issues of checking survey in open mine. A detail GPS data acquisition coding scheme was presented.Based on the scheme an algorithm used for computer semiautomatic cartography was made.Three methods used for eliminating gross errors from raw data which were needed for creating DEM was dis- cussed.Two algorithms were researched and realized which can be used to create open mine fine DEM model with constrained conditions and to dynamically update the model. The precision analysis and evaluation of the created model were carried out.
基金This work was supported by the Scientific Research Projects of Tianjin Educational Committee(No.2020KJ029)。
文摘The prediction process often runs with small samples and under-sufficient information.To target this problem,we propose a performance comparison study that combines prediction and optimization algorithms based on experimental data analysis.Through a large number of prediction and optimization experiments,the accuracy and stability of the prediction method and the correction ability of the optimization method are studied.First,five traditional single-item prediction methods are used to process small samples with under-sufficient information,and the standard deviation method is used to assign weights on the five methods for combined forecasting.The accuracy of the prediction results is ranked.The mean and variance of the rankings reflect the accuracy and stability of the prediction method.Second,the error elimination prediction optimization method is proposed.To make,the prediction results are corrected by error elimination optimization method(EEOM),Markov optimization and two-layer optimization separately to obtain more accurate prediction results.The degree improvement and decline are used to reflect the correction ability of the optimization method.The results show that the accuracy and stability of combined prediction are the best in the prediction methods,and the correction ability of error elimination optimization is the best in the optimization methods.The combination of the two methods can well solve the problem of prediction with small samples and under-sufficient information.Finally,the accuracy of the combination of the combined prediction and the error elimination optimization is verified by predicting the number of unsafe events in civil aviation in a certain year.
基金supported by the National Natural Science Foundation of China under Grant Nos.60608002and 60608002
文摘Several results on optical-axis perturbation and elimination of the mismatching error C of a monolithic triaxial ring resonator (MTRR) are reported. Based on the augmented 5×5 ray matrix method, by simultaneously considering axial displacement of a mirror and the misalignments in three planar square ring resonators of a MTRR, the rules of optical-axis perturbation are obtained. The mismatching error C of the MTRR is eliminated. The results obtained are important for cavity design, as well as in the improvement and alignment of MTRR.
基金supported by the Shanghai Committee of Science and Technology,China (Grant No.11ZR1443500)the National Natural Science Foundation of China (Grant No.11033004)
文摘Aiming at regional services,the space segment of COMPASS (Phase I) satellite navigation system is a constellation of Geostationary Earth Orbit (GEO),Inclined Geostationary Earth Orbit (IGSO) and Medium Earth Orbit (MEO) satellites.Precise orbit determination (POD) for the satellites is limited by the geographic distribution of regional tracking stations.Independent time synchronization (TS) system is developed to supplement the regional tracking network,and satellite clock errors and orbit data may be obtained by simultaneously processing both tracking data and TS data.Consequently,inconsistency between tracking system and TS system caused by remaining instrumental errors not calibrated may decrease navigation accuracy.On the other hand,POD for the mixed constellation of GEO/IGSO/MEO with the regional tracking network leads to parameter estimations that are highly correlated.Notorious example of correlation is found between GEO's orbital elements and its clock errors.We estimate orbital elements and clock errors for a 3GEO+2IGSO constellation in this study using a multi-satellite precise orbit determination (MPOD) strategy,with which clock error elimination algorithm is applied to separate orbital and clock estimates to improve numerical efficiency.Satellite Laser Ranging (SLR) data are used to evaluate User Ranging Error (URE),which is the orbital error projected on a receiver's line-of-sight direction.Two-way radio-wave time transfer measurements are used to evaluate clock errors.Experimenting with data from the regional tracking network,we conclude that the fitting of code data is better than 1 m in terms of Root-Mean-Square (RMS),and fitting of carrier phase is better than 1 cm.For orbital evaluation,difference between computed receiver-satellite ranging based on estimated orbits and SLR measurements is better than 1 m (RMS).For clock estimates evaluation,2-hour linear-fitting shows that the satellite clock rates are about 1.E-10 s/s,while receiver clock rates are about 1×10 13-1×10 12 s/s.For the 72-hour POD experiment,the average differences between POD satellite clock rates estimates and clock measurements based on TS system are about 1×10 13 s/s,and for receiver clock rates,the differences are about 1×10 15 s/s.