期刊文献+
共找到1,233篇文章
< 1 2 62 >
每页显示 20 50 100
Numerical simulation of flow field deposition and erosion characteristics around bridge-road transition section
1
作者 ZHANG Kai WANG Zhenghui +3 位作者 WANG Tao TIAN Jianjin ZHANG Hailong LIU Yonghe 《Journal of Mountain Science》 SCIE CSCD 2024年第5期1491-1508,共18页
Wind-sand flow generates erosion and deposition around obstacles such as bridges and roadbeds, resulting in sand damage and endangering railway systems in sandy regions. Previous studies have mainly focused on the flo... Wind-sand flow generates erosion and deposition around obstacles such as bridges and roadbeds, resulting in sand damage and endangering railway systems in sandy regions. Previous studies have mainly focused on the flow field around roadbeds, overlooking detailed examinations of sand particle erosion and deposition patterns near bridges and roadbeds. This study employs numerical simulations to analyze the influence of varying heights and wind speeds on sand deposition and erosion characteristics at different locations: the bridge-road transition section(side piers), middle piers, and roadbeds. The results show that the side piers, experience greater accumulation than the middle piers. Similarly, the leeward side of the roadbed witnesses more deposition compared to the windward side. Another finding reveals a reduced sand deposition length as the vertical profile, in alignment with the wind direction, moves further from the bridge abutments at the same clearance height. As wind speeds rise, there’s a decline in sand deposition and a marked increase in erosion around the side piers, middle piers and roadbeds. In conclusion, a bridge clearance that’s too low can cause intense sand damage near the side piers, while an extremely high roadbed may lead to extensive surface sand deposition. Hence, railway bridges in areas prone to sandy winds should strike a balance in clearance height. This research provides valuable guidelines for determining the most suitable bridge and roadbed heights in regions affected by wind and sand. 展开更多
关键词 SANDSTORM Flow field Bridge-road transition section Sedimentation erosion Numerical simulation
下载PDF
Structural Design of Roadbed and Pavement in Transition Section of Roads and Bridges
2
作者 Bai Fan 《Journal of World Architecture》 2024年第4期21-26,共6页
As the lifeline of social development,road and bridge projects are the main channel to realize resource transportation and economic circulation.Ensuring the quality of road and bridge project construction is crucial f... As the lifeline of social development,road and bridge projects are the main channel to realize resource transportation and economic circulation.Ensuring the quality of road and bridge project construction is crucial for the development of society,the economy,and people’s livelihoods.This paper studies the design of roadbed pavement structures in road and bridge transition sections.It aims to provide technical references and significance for China’s road and bridge engineering design and construction units,promoting scientific and standardized design in these actions.This will contribute to the safety and stable operation of road and bridge projects,offering effective technical support.Furthermore,it seeks to foster the sustainable and healthy development of China’s road and bridge engineering on a macro level. 展开更多
关键词 Road and bridge transition section Roadbed pavement structure design Lap plate Easing transition section Drainage system
下载PDF
Load Transferring Mechanism on Transition Section of Composite Bucket Foundation for Offshore Wind Turbines 被引量:2
3
作者 Puyang Zhang Zhi Zhang +2 位作者 Junjie Ma Hongyan Ding Ruiqi Hu 《Transactions of Tianjin University》 EI CAS 2017年第5期434-444,共11页
The composite bucket foundation (CBF) is a new kind of foundation which has been applied in the offshore wind industry. A reasonable connection pattern between the tower and the CBF top cover is crucial for load trans... The composite bucket foundation (CBF) is a new kind of foundation which has been applied in the offshore wind industry. A reasonable connection pattern between the tower and the CBF top cover is crucial for load transmissions from the superstructure. Therefore, it is essential to choose an optimum structure type for the transition section. The line type and the arc transition section models were established by ABAQUS, and the internal forces of cross section were extracted along the height direction. Specifically, the force transfer mechanism for different types of the transition sections was investigated comparatively with monotonic as well as composite loadings. The results show that the curved transition structure exhibits the better mechanical characteristics under the monotonic and composite loadings, and the reason can be illustrated that its specific arc-shape structure can effectively convert the tremendous bending moment from the turbine tower into the limited tensile and compressive stresses downwards, without the occurrence of force concentration. © 2017, Tianjin University and Springer-Verlag Berlin Heidelberg. 展开更多
关键词 FOUNDATIONS Offshore wind turbines Steel beams and girders Wind turbines
下载PDF
Modeling and Analysis of Transitional Tube with Constant Sectional Area along Derivative Central Route 被引量:1
4
作者 MENG Xiang-bao TONG Bao-guo +1 位作者 PAN Zi-jian LI Hai-xing 《Computer Aided Drafting,Design and Manufacturing》 2011年第2期19-24,共6页
Firstly, sample square-circular transition tube along straight central route was modeled on CATIA software. The parameters are as follows: let the tube length is L, and the constant cross section area is S, and S = ... Firstly, sample square-circular transition tube along straight central route was modeled on CATIA software. The parameters are as follows: let the tube length is L, and the constant cross section area is S, and S = πR^2 = a2, in which R stands for the circle radius on one end, and a the square side length on the other end; set up the coordinate system with OX axis on the central route in which the origin O is on centroid of the square end and assume the cross section size at x as the square shaped with all four comers filleted in radius r which is proportional to x, that is, the linear slope of r is R/L, thus, both values r and square side length ax can be attained on the constant cross section area assumption. Secondly, some sample polygonal-circular transition tubes along straight, circular and helical central route were implemented similarly. Thirdly, numerical analysis of stress and displacement of these tubes were carried out on MSC/PATRAN software which are important to the distribution of turbulent flow and the layout of these transitional tube structures. 展开更多
关键词 parametric modeling transitional tube constant cross section area finite element analysis CATIA application
下载PDF
Finite element analysis on impact of foundation treatment in bridgehead transition section upon bridge piles
5
作者 ZHENG Wei DU Lizhi WANG Yong 《Global Geology》 2011年第4期254-258,共5页
In order to decrease relative settlement, foundation treatment plays an extremely important role in bridgehead transition section, especially, the situation of building the bridge piles firstly, and then processing pi... In order to decrease relative settlement, foundation treatment plays an extremely important role in bridgehead transition section, especially, the situation of building the bridge piles firstly, and then processing piles. On the basis of engineering practice, the authors analyzed the influence of foundation treatment on bridge piles in bridgehead transition section by finite-element method (FEM). This research has positive significance in predicting displacement of bridge pile, directing construction of foundation treatment, and improving quality of engineering and so forth. 展开更多
关键词 foundation treatment finite element analysis bridge pile bridgehead transition section
下载PDF
Design Strategy of Highway Speed Transition Section
6
作者 Yong Yang 《Journal of Architectural Research and Development》 2021年第2期59-61,共3页
In this paper,combined with the relevant speed theory and characteristics of the law,the current highway speed transition design problems are studied and analyzed.In the process of specific analysis,mainly combined wi... In this paper,combined with the relevant speed theory and characteristics of the law,the current highway speed transition design problems are studied and analyzed.In the process of specific analysis,mainly combined with the characteristics of different types of highway speed changes and road section design requirements,this paper studies and analyzes the design methods of different types of highway speed transition section.And on this basis,according to the design principles and requirements of highway operation speed transition section,the paper summarizes the matters needing attention in the design of highway operation speed transition section,in order to provide certain reference value for relevant personnel. 展开更多
关键词 Road route Operating speed transition section design Strategy analysis
下载PDF
FE Analysis of Longitudinal Dynamic Response of Subgrade in Bridge-Subgrade Transition of Heavy Haul Railway 被引量:4
7
作者 Shengchuan Liu Guiling Ding +1 位作者 Lianjun Wang Jianguo Chen 《Journal of Civil Engineering and Architecture》 2010年第5期52-59,共8页
With the increase of axle load and the train speed, dynamic interaction of train-track system becomes so exacerbated that the deformation and dynamic response of subgrade are more aggravated. The differential settleme... With the increase of axle load and the train speed, dynamic interaction of train-track system becomes so exacerbated that the deformation and dynamic response of subgrade are more aggravated. The differential settlement will be created in bridge-embankment transition section under such dynamic action, and an adverse effect on the train operation safety can be caused. Meanwhile, differential settlement will produce additional dynamic effect when high-speed trains go through the transition between bridge-embankment. Such dynamic action will aggravate the differential settlement and subgrade damage. This paper applies the methods of field test and finite-element to systematically study the dynamic response characteristics of subgrade in bridge-embankment transition section of heavy haul railway under dynamic load for the first time. This research is focused on the analysis of influence of the different axle load, train speed, filled soil modulus, etc.. At last, the dynamic response rules are systematically summarized. 展开更多
关键词 Heavy haul railway bridge-embankment transition section dynamic response finite-element method.
下载PDF
The Research of Urban Rail Transit Sectional Passenger Flow Prediction Method 被引量:1
8
作者 Qian Li Yong Qin +4 位作者 Ziyang Wang Zhongxin Zhao Minghui Zhan Yu Liu Zhiguo Li 《Journal of Intelligent Learning Systems and Applications》 2013年第4期227-231,共5页
This paper studies the short-term prediction methods of sectional passenger flow, and selects BP neural network combined with the characteristics of sectional passenger flow itself. With a case study, we design three ... This paper studies the short-term prediction methods of sectional passenger flow, and selects BP neural network combined with the characteristics of sectional passenger flow itself. With a case study, we design three different schemes. We use Matlab to realize the prediction of the sectional passenger flow of the Beijing subway Line 2 and make comparative analysis. The empirical research shows that combining data characteristics of sectional passenger flow with the BP neural network have good prediction accuracy. 展开更多
关键词 URBAN RAIL transit NEURAL Network sectional PASSENGER FLOW Prediction Method
下载PDF
Fine-grained gravity flow sedimentation and its influence on development of shale oil sweet sections in lacustrine basins in China 被引量:1
9
作者 ZOU Caineng FENG Youliang +6 位作者 YANG Zhi JIANG Wenqi ZHANG Tianshu ZHANG Hong WANG Xiaoni ZHU Jichang WEI Qizhao 《Petroleum Exploration and Development》 SCIE 2023年第5期1013-1029,共17页
The geological conditions and processes of fine-grained gravity flow sedimentation in continental lacustrine basins in China are analyzed to construct the model of fine-grained gravity flow sedimentation in lacustrine... The geological conditions and processes of fine-grained gravity flow sedimentation in continental lacustrine basins in China are analyzed to construct the model of fine-grained gravity flow sedimentation in lacustrine basin,reveal the development laws of fine-grained deposits and source-reservoir,and identify the sweet sections of shale oil.The results show that fine-grained gravity flow is one of the important sedimentary processes in deep lake environment,and it can transport fine-grained clasts and organic matter in shallow water to deep lake,forming sweet sections and high-quality source rocks of shale oil.Fine-grained gravity flow deposits in deep waters of lacustrine basins in China are mainly fine-grained high-density flow,fine-grained turbidity flow(including surge-like turbidity flow and fine-grained hyperpycnal flow),fine-grained viscous flow(including fine-grained debris flow and mud flow),and fine-grained transitional flow deposits.The distribution of fine-grained gravity flow deposits in the warm and humid unbalanced lacustrine basins are controlled by lake-level fluctuation,flooding events,and lakebed paleogeomorphology.During the lake-level rise,fine-grained hyperpycnal flow caused by flooding formed fine-grained channel–levee–lobe system in the flat area of the deep lake.During the lake-level fall,the sublacustrine fan system represented by unconfined channel was developed in the flexural slope breaks and sedimentary slopes of depressed lacustrine basins,and in the steep slopes of faulted lacustrine basins;the sublacustrine fan system with confined or unconfined channel was developed on the gentle slopes and in axial direction of faulted lacustrine basins,with fine-grained gravity flow deposits possibly existing in the lower fan.Within the fourth-order sequences,transgression might lead to organic-rich shale and fine-grained hyperpycnal flow deposits,while regression might cause fine-grained high-density flow,surge-like turbidity flow,fine-grained debris flow,mud flow,and fine-grained transitional flow deposits.Since the Permian,in the shale strata of lacustrine basins in China,multiple transgression-regression cycles of fourth-order sequences have formed multiple source-reservoir assemblages.Diverse fine-grained gravity flow sedimentation processes have created sweet sections of thin siltstone consisting of fine-grained high-density flow,fine-grained hyperpycnal flow and surge-like turbidity flow deposits,sweet sections with interbeds of mudstone and siltstone formed by fine-grained transitional flows,and sweet sections of shale containing silty and muddy clasts and with horizontal bedding formed by fine-grained debris flow and mud flow.The model of fine-grained gravity flow sedimentation in lacustrine basin is significant for the scientific evaluation of sweet shale oil reservoir and organic-rich source rock. 展开更多
关键词 fine-grained deposit hyperpycnal flow deposit fine-grained debris flow deposit muddy flow deposit fine-grained transitional flow deposit reservoir sweet section organic-rich source rock shale oil
下载PDF
广东省二、三级医疗机构延续护理部门设立及运作现况调查 被引量:1
10
作者 王琳 黄瑞英 +3 位作者 牛亚荣 李凤 朱燕英 陈志丽 《全科护理》 2024年第4期653-656,共4页
目的:了解广东省二、三级医疗机构延续护理部门的设立及运作情况,为医疗机构建设延续护理部门、开展延续护理提供参考和借鉴。方法:采用便利抽样法于2023年5月4日—19日选取广东省110所二、三级医疗机构的护理管理人员进行调查,调查其... 目的:了解广东省二、三级医疗机构延续护理部门的设立及运作情况,为医疗机构建设延续护理部门、开展延续护理提供参考和借鉴。方法:采用便利抽样法于2023年5月4日—19日选取广东省110所二、三级医疗机构的护理管理人员进行调查,调查其所在医疗机构延续护理部门的建立情况、运作情况、阻滞因素及相关建议。结果:110所医疗机构中有35所(31.82%)设立了延续护理部门,58所(52.73%)拟计划开展延续护理服务,17所(15.45%)暂无设立延续护理部门及开展延续护理的计划。已开展延续护理的35所医疗机构中,2010年前设立延续护理部门的有3所(8.57%),2010—2018年有9所(25.71%),2019年至今有23所(65.71%)。35所医疗机构延续护理运作情况良好,但在医疗收费、医院-社区联动及延续护理质量指标设置方面需进一步加强和完善。51所(46.36%)医疗机构认为设立延续护理部门开展延续护理服务无障碍,59所(53.64%)认为存在障碍,障碍因素主要包括人力资源短缺(79.66%)、经济效益受限(76.27%)、实施场地缺乏(54.24%)、不知如何开展(32.20%)、院领导不支持(23.73%)等。结论:因缺乏统一、规范的标准及指南,广东省二、三级医疗机构延续护理部门的设立及运作情况参差不齐且存在多方面争议、困惑及不足。建议从“相关政策制度、部门组织架构、信息共享与协调机制、服务收费与支付机制、延续护理质量评价指标、工作人员绩效”等方面完善延续护理部门的设立及运作,从而推进延续护理的发展,助力实施健康中国战略。 展开更多
关键词 二级医院 三级医院 延续护理部门 设立 运作 横断面研究 护理管理研究
下载PDF
Distress Characteristics in Embankment‑Bridge Transition Section of the Qinghai‑Tibet Railway in Permafrost Regions 被引量:1
11
作者 Peifeng He Fujun Niu +2 位作者 Yunhui Huang Saize Zhang Chenglong Jiao 《International Journal of Disaster Risk Science》 SCIE CSCD 2023年第4期680-696,共17页
The Qinghai-Tibet Railway has been operating safely for 16 years in the permafrost zone and the railroad subgrade is generally stable by adopting the cooling roadbed techniques.However,settlement caused by the degrada... The Qinghai-Tibet Railway has been operating safely for 16 years in the permafrost zone and the railroad subgrade is generally stable by adopting the cooling roadbed techniques.However,settlement caused by the degradation of subgrade permafrost in the embankment-bridge transition sections(EBTS)is one of the most representative and severe distresses.A feld survey on 440 bridges(including 880 EBTSs)was carried out employing terrestrial laser scanning and ground-penetrating radar for comprehensively assessing all EBTSs in the permafrost zone.The results show that the types of distresses of EBTSs were diferential settlement,upheaval mounds of the protection-cone slopes,subsidence of the protection-cone slopes,surface cracks of the protection cones and longitudinal and transverse dislocation of the wing walls.The occurrence rates of these distresses were 78.93,3.47,11.56,3.36,21.18 and 4.56%,respectively.The most serious problem was diferential settlement,and the average diferential settlement amount(ADSA)was 15.3 cm.Furthermore,the relationships between diferential settlement and 11 infuencing factors were examined.The results indicate that ADSA is greater on the northern side of a bridge than on the southern side and on the sunny slope than on the shady slope.It is also greater in the high-temperature permafrost region than in the low-temperature permafrost region and in the high-ice content area than in the low-ice content area.The EBTSs are more infuenced by ice content than by ground temperature.The ADSA increases when the embankment height increases,the particle size of subgrade soil decreases and the surface vegetation cover decreases. 展开更多
关键词 Distresses embankment-bridge transition section Permafrost regions Qinghai-Tibet railway
原文传递
空基回收拖曳系统直线-盘旋转接段运动轨迹设计
12
作者 陈海通 苏子康 +3 位作者 李春涛 李雪兵 孟冲 张朋 《北京航空航天大学学报》 EI CAS CSCD 北大核心 2024年第8期2565-2574,共10页
针对气流扰动下空基回收拖曳系统在直线-盘旋转接段飞行过程中的拖曳浮标稳定问题,提出一种基于微分平坦理论的拖曳系统转接段运动轨迹的设计方法,通过设计母机运动轨迹间接地控制拖曳浮标沿着预设的转接轨迹安全、平稳、精准地转接飞... 针对气流扰动下空基回收拖曳系统在直线-盘旋转接段飞行过程中的拖曳浮标稳定问题,提出一种基于微分平坦理论的拖曳系统转接段运动轨迹的设计方法,通过设计母机运动轨迹间接地控制拖曳浮标沿着预设的转接轨迹安全、平稳、精准地转接飞行。采用质点-弹簧离散缆绳模型构建母机-缆绳-浮标组合体多体动力学模型;在证明拖曳系统具备微分平坦特性的基础上,以拖曳浮标三轴位置为平坦输出,所提方法以期浮标沿着预设安全转接段轨迹飞行;结合拖曳浮标直线飞行状态与盘旋飞行状态设计拖曳浮标转接段飞行轨迹。通过平静大气、多种常值风及阵风气流扰动场景下的仿真算例结果表明,所提方法能够实现拖曳浮标在直线-盘旋转接段的稳定飞行。 展开更多
关键词 空基回收 无人机 运动轨迹设计 微分平坦 过渡飞行
下载PDF
基于DEM-FDM耦合的过渡段膨胀诱发钢轨上拱研究
13
作者 汪优 高天涯 +4 位作者 闫斌 王瑞 陈子娟 张文旭 程建军 《铁道工程学报》 EI CSCD 北大核心 2024年第1期7-12,共6页
研究目的:为分析涵洞过渡段地基膨胀引起的钢轨上拱响应,基于现场测试、室内膨胀试验数据,开展DEM-FDM耦合数值模拟,分析某涵洞附近路基土在膨胀范围为16 m,膨胀中心距离涵洞中心分别为0 m、5 m、10 m这三种工况下,不同膨胀率时基床填... 研究目的:为分析涵洞过渡段地基膨胀引起的钢轨上拱响应,基于现场测试、室内膨胀试验数据,开展DEM-FDM耦合数值模拟,分析某涵洞附近路基土在膨胀范围为16 m,膨胀中心距离涵洞中心分别为0 m、5 m、10 m这三种工况下,不同膨胀率时基床填料的运动规律及钢轨的上拱响应。研究结论:(1)涵洞对于钢轨上拱位移的传递存在阻断作用,但会增大钢轨上拱的峰值,原位膨胀率下工况二的钢轨上拱峰值达到46 mm,当路基膨胀率为0.3%时钢轨上拱位移量达到无砟轨道钢轨可调节临界值(4mm);(2)过渡段钢轨上拱处同时产生轴向应力集中,其中原位膨胀率下工况二轴向应力峰值达到14.4 MPa;(3)对于膨胀区域位于涵洞下方的工况,钢轨轴向应力呈现出来的分布规律为钢轨上拱拱顶处为主拉应力状态,拱脚处为主压应力状态,因此一共包括三个压应力峰值点以及两个拉应力峰值点;(4)本文研究可为高铁涵洞过渡段路基膨胀病害解决方案的确定提供理论依据。 展开更多
关键词 过渡段 路基膨胀 无砟轨道 钢轨上拱 有限差分 离散元
下载PDF
互联网+背景下虚拟教研室内涵建设
14
作者 张宏伟 王新环 +1 位作者 高如新 戴胜华 《电气电子教学学报》 2024年第4期34-38,共5页
针对高校基层教学组织建设存在的一些问题,分析了虚拟教研室的成立背景、建设内涵,探讨了虚拟教研室的组织架构及保障条件,提出了以师资能力提升为导向,以课程建设为核心,以教学资源共享为途径,以开放课题研究为抓手的内涵建设途径。实... 针对高校基层教学组织建设存在的一些问题,分析了虚拟教研室的成立背景、建设内涵,探讨了虚拟教研室的组织架构及保障条件,提出了以师资能力提升为导向,以课程建设为核心,以教学资源共享为途径,以开放课题研究为抓手的内涵建设途径。实践应用表明,通过加强虚拟教研室内涵建设,极大地提升了各参与高校的积极性,有效促进了各参与高校轨道交通信号与控制专业的专业建设水平,提升了人才培养质量。 展开更多
关键词 虚拟教研室 轨道交通信号与控制专业 内涵建设
下载PDF
路堤-桥梁过渡段车辆气动力风洞试验研究
15
作者 韩冰 李昊轩 +2 位作者 何一宽 解会兵 贾影 《土木与环境工程学报(中英文)》 CSCD 北大核心 2024年第4期136-142,共7页
为了探究路堤-桥梁过渡段处车辆的气动力,建立1:50的大比例尺路堤-桥梁过渡段和车辆试验模型,在桥梁和路堤段分别布置两种风屏障,并在车辆模型表面布置多个测压点,以研究不同防风措施下处于不同风向角的路桥过渡段车辆气动力。试验结果... 为了探究路堤-桥梁过渡段处车辆的气动力,建立1:50的大比例尺路堤-桥梁过渡段和车辆试验模型,在桥梁和路堤段分别布置两种风屏障,并在车辆模型表面布置多个测压点,以研究不同防风措施下处于不同风向角的路桥过渡段车辆气动力。试验结果表明:与无防风措施相比,布置桥梁风屏障后最不利风向角会从-15°变为0°,此风向下过渡段处车辆的三分力最大;再进一步布置路堤风屏障后最不利风向角不变,但大幅度减小了0°风向角下车辆的侧力系数和力矩系数;布置路堤风屏障能有效减小车辆所受三分力;不同风向角下改变陆地风屏障参数产生的影响不同,针对路堤-桥梁过渡段布置防风措施时,应充分考虑其来流方向,以达到最优效果。 展开更多
关键词 路堤-桥梁过渡段 风洞试验 车辆气动力 风向角 防风措施
下载PDF
运营期纵连板式无砟轨道端刺结构位移特征
16
作者 蔡小培 王昌昌 +3 位作者 董博 钟阳龙 郑新国 游彦辉 《铁道工程学报》 EI CSCD 北大核心 2024年第1期20-25,共6页
研究目的:Π型端刺锚固体系是纵连板式无砟轨道路桥过渡段限制轨道结构位移的关键部位。本文考虑轨道结构与桥梁及摩擦板、端刺与土体的非线性相互作用关系,建立轨道-桥梁-路基-端刺结构一体化计算模型,研究锚固结构服役状态下的位移特... 研究目的:Π型端刺锚固体系是纵连板式无砟轨道路桥过渡段限制轨道结构位移的关键部位。本文考虑轨道结构与桥梁及摩擦板、端刺与土体的非线性相互作用关系,建立轨道-桥梁-路基-端刺结构一体化计算模型,研究锚固结构服役状态下的位移特征,分析端刺与路基不同脱空位置对结构位移的影响,提出注浆填补层间脱空的增强方案,并对其可行性进行论证。研究结论:(1)端刺与路基完全脱空后,纵向位移相比脱空前大幅增加且超过了3 mm位移限值,脱空引起的路基对端刺结构摩阻力、锚固力下降会导致端刺产生超量位移;(2)摩擦板区域的脱空对端刺位移影响很小,主端刺区域脱空和完全脱空引起的端刺纵向位移只相差0.11 mm,所以主端刺区域路基脱空是引发结构超量位移的主因;(3)采用注浆方式对脱空区域路基进行加固整治后端刺的纵向位移降低了3.5 mm左右,端刺结构位移恢复到了与正常服役状况相近的程度;(4)本研究成果可为现场Π型端刺结构超量位移整治提供一定的理论依据。 展开更多
关键词 路桥过渡段 Π型端刺 脱空 超量位移 注浆增强
下载PDF
不同防风设施过渡段接触网风场特性分析
17
作者 郭凤平 《铁道工程学报》 EI CSCD 北大核心 2024年第2期80-85,共6页
研究目的:大风经不同防风设施过渡段后形成涡流区,在接触网及承力索附近形成大风增速区,加大接触网的风偏和振动,对接触网的安全性、稳定性及抗疲劳性产生更大影响。为研究不同防风设施过渡段接触网处的风场特性,根据兰新高铁明洞与路... 研究目的:大风经不同防风设施过渡段后形成涡流区,在接触网及承力索附近形成大风增速区,加大接触网的风偏和振动,对接触网的安全性、稳定性及抗疲劳性产生更大影响。为研究不同防风设施过渡段接触网处的风场特性,根据兰新高铁明洞与路基挡风墙防风过渡段的典型结构,基于数值计算及风洞试验,对列车在隧道、明洞、挡风屏和挡风墙等不同防风设施运行时的接触网处风场特性进行研究。研究结论:(1)不同线路结构风速变化规律基本一致,来流风速经过车身绕流作用,风速先急剧增大,随着列车逐渐远离监测点,风速减小并最后趋于稳定;(2)防风设施过渡段承力索处风速较接触线处大;(3)不同防风设施过渡段隧道口及隧道与路基挡风墙过渡段风速峰值较大,运行时应给予重点关注,建议采用弹性定位器等措施,改善弓网的运行状态;(4)本研究成果可为防风设施过渡段的接触网设计提供依据。 展开更多
关键词 防风过渡段 风场特性 风洞试验 接触网 风致响应
下载PDF
某高速公路深厚软基路桥过渡段跳车病害处治研究
18
作者 文斌 张从军 +1 位作者 郝宇萌 单天保 《路基工程》 2024年第1期173-181,共9页
结合某在役高速公路路堤深厚软基桥头跳车实测累计沉降量40.60 cm病害处治工程,开展室内土工试验、理论计算及GEO5模型计算分析。结果表明:15年内的累计剩余沉降量均超规范中桥头路基容许工后剩余沉降量不大于10.00 cm要求;提出“CFG桩... 结合某在役高速公路路堤深厚软基桥头跳车实测累计沉降量40.60 cm病害处治工程,开展室内土工试验、理论计算及GEO5模型计算分析。结果表明:15年内的累计剩余沉降量均超规范中桥头路基容许工后剩余沉降量不大于10.00 cm要求;提出“CFG桩+路面重铺”等处治方案,进行检算校核,计算得剩余总沉降量9.76cm,表明处治设计方案较为可靠。结合工点需保通及基底存在前期已施工CFG桩特点,制定通车条件下的施工顺序及工艺,确保方案可行。 展开更多
关键词 深厚软土区 过渡段 病害 理论计算 剩余沉降量 CFG桩
下载PDF
城市轨道交通牵引供电系统专用轨回流技术综述 被引量:4
19
作者 燕振刚 田广辉 陈显志 《现代城市轨道交通》 2024年第1期52-59,共8页
近年来,为彻底解决城市轨道交通直流供电制式下杂散电流的泄漏问题,开始应用专用轨回流技术。为充分了解专用轨回流方式给城市轨道交通建设带来的变化和影响,文章首先采用对比的方法,分别从供电系统组成、牵引所间距、接地方式、接地保... 近年来,为彻底解决城市轨道交通直流供电制式下杂散电流的泄漏问题,开始应用专用轨回流技术。为充分了解专用轨回流方式给城市轨道交通建设带来的变化和影响,文章首先采用对比的方法,分别从供电系统组成、牵引所间距、接地方式、接地保护、列车检修静调、限界、车辆和轨道设计几个方面与走行轨回流方式进行比较;其次,针对目前几种专用轨电分段原则的特点对其进行比对,得出专用轨只有在与折返小交路电分段对齐设置分段时对运营维护将更有利的结论;再次,针对存在多条线大架修共享同一车辆基地,不同回流方式线路间存在跨线运行的情况,简述回流方式转换段设置的工程应用案例;最后,展望未来专用轨回流技术在城市轨道交通牵引供电系统的发展方向。 展开更多
关键词 城市轨道交通 杂散电流 专用轨 专用轨电分段 回流方式转换段
下载PDF
双块式无砟轨道端梁区高温拱曲影响因素及控制技术
20
作者 赵虎 杨怀志 +2 位作者 代冲 谭诗宇 洪剑 《路基工程》 2024年第2期138-142,共5页
针对高速铁路双块式无砟轨道线路路基段两头端梁区附近道床板上拱问题,采用有限元方法,研究不同温度组合、路基段长度及端梁桩土约束刚度对道床板上拱的影响规律。结果表明:道床板的温度变形是引起上拱的主因,但支承层的变形扰动及其与... 针对高速铁路双块式无砟轨道线路路基段两头端梁区附近道床板上拱问题,采用有限元方法,研究不同温度组合、路基段长度及端梁桩土约束刚度对道床板上拱的影响规律。结果表明:道床板的温度变形是引起上拱的主因,但支承层的变形扰动及其与道床板的温度变形组合效应不可忽视;随着路基段长度的增加,上拱幅值增加趋势明显;端梁的桩土约束对上拱的影响较为复杂,在中间某一特定约束刚度时上拱达到峰值,而当约束刚度无论变大或变小,上拱都呈现变小的趋势;断开支承层对控制高温上拱变形效果不显著,断开道床板则效果显著,但需协调考虑对应区段的钢轨受力。 展开更多
关键词 高速铁路 双块式无砟轨道 过渡段 温度 变形控制 约束刚度
下载PDF
上一页 1 2 62 下一页 到第
使用帮助 返回顶部