期刊文献+
共找到6篇文章
< 1 >
每页显示 20 50 100
Research on Quality Management Measures of Green Building Construction
1
作者 Jie Hong Xiang Xu 《Journal of Architectural Research and Development》 2024年第3期8-13,共6页
Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering ... Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering construction,the energy-saving properties of the building should also be considered.Therefore,a scientific management approach should be adopted to improve green building management.This paper primarily examines the importance of quality management in green building construction,along with the factors influencing it.It also identifies the quality issues present in current green building construction.Finally,it proposes measures for quality management in the green building construction process to facilitate the industry’s healthy development. 展开更多
关键词 Green building engineering Construction process control Quality management Construction publicity
下载PDF
Problems and Measures in the Management of Building Decoration Engineering
2
作者 Yanning Luo 《Journal of World Architecture》 2020年第6期22-24,共3页
Building decoration engineering mainly carries out various decoration works for buildings,which can provide protection for building components,avoid the influence of nature as far as possible,and help to improve the f... Building decoration engineering mainly carries out various decoration works for buildings,which can provide protection for building components,avoid the influence of nature as far as possible,and help to improve the function of buildings and prolong their life.At the same time,the building decoration project is an important part of the whole construction project,and the probability of bad situation is relatively large,so it is necessary to carry out in-depth exploration for the corresponding management work,clarify the existing problems,and put forward corresponding measures according to the actual situation. 展开更多
关键词 building Decoration engineering ADMINISTRATION PROBLEMS Measures
下载PDF
BIM-Based Strategies for Construction Quality Control in Building Engineering
3
作者 Bin Zhang 《Journal of World Architecture》 2022年第3期37-42,共6页
In order to improve the construction quality and steadily promote the improvement in the level of the construction industry,this paper expounds BIM-based strategies for construction quality control.This paper first id... In order to improve the construction quality and steadily promote the improvement in the level of the construction industry,this paper expounds BIM-based strategies for construction quality control.This paper first identifies the factors affecting the construction quality,analyzes the advantages and value of the application of BIM in construction,and finally analyzes the scenario of applying BIM for future references. 展开更多
关键词 BIM building engineering Construction quality control
下载PDF
Buildings and civil engineering works-Sealants-Determination of changes in cohesion and appearance of elastic weatherproofing sealants after exposure of statically cured specimens to artificial weathering and mechanical cycling
4
《合成材料老化与应用》 2017年第S1期69-86,共18页
Foreword ISO(the International Organization for Standardization)is a worldwide federation of national standards bodies(ISO member bodies).The work of preparing International Standards is normally carried out through I... Foreword ISO(the International Organization for Standardization)is a worldwide federation of national standards bodies(ISO member bodies).The work of preparing International Standards is normally carried out through ISO technical committees.Each member body interested in a subject for which a technical committee has been established has the right to be represented on that committee. 展开更多
关键词 buildings and civil engineering works-Sealants-Determination of changes in cohesion and appearance of elastic weatherproofing sealants after exposure of statically cured specimens to artificial weathering and mechanical cycling ISO
下载PDF
Work-Related Accidents on a Hospital Construction Site in Benin
5
作者 Adjobimey Mênonli Mikponhoué Rose +5 位作者 Dégbey Cyriaque Hountohotègbé Esdras Guédou Alexandre Lawani Affousath Ayélo Paul Hinson Antoine 《Occupational Diseases and Environmental Medicine》 2024年第2期142-159,共18页
Introduction: Work-related accidents are frequent and serious in the construction sector. The aim of the study was to determine the frequency and factors associated with occupational accidents on the construction site... Introduction: Work-related accidents are frequent and serious in the construction sector. The aim of the study was to determine the frequency and factors associated with occupational accidents on the construction site of a referral hospital in Benin. Methods: A cross-sectional study was carried out. The sample size was calculated using the Schwartz form adjusted for the number of workers on site and was 129 workers. Random sampling was used. The dependent variable was work-related accidents. The other variables were socio-demographic and occupational characteristics. Data were collected through a questionnaire survey. Medians and proportions were calculated. An association was sought using Chi-square and Fisher tests with a threshold of p Results: A total of 132 workers were included. Their median age was 30 years with an ITQ of [27 - 38];men were the most represented 126 (95.45%) with a level of education higher than or equal to high school in 101 (76.52%) and in the majority with a permanent status 85 (64.39%). Seniority of more than 5 years was observed in 92 (69.7%). Workers working more than 8 hours of overtime per week numbered 57 (43.18%). Exposure to vibrating objects was 49 (37.12%). In terms of psychosocial constraints, 82.58% had high psychological demands;79.53% low decision-making latitude;50.76% low social support. The frequency of work-related accidents was 6.82%, and the only associated factor was the type of worker (p = 0.016). On the other hand, there were 10.2% accidents among workers handling vibrating objects versus 4.98% among those not using them. With regard to psychosocial constraints, the following frequencies were recorded respectively: 6.42% among those with high psychological demand versus 8.7% among those with low psychological demand;7.62% among those with low decision-making latitude versus 3.7% among those with high decision-making latitude;8.96% among those with low social support versus 4.62% among those with high support. Conclusion: Work-related accidents on construction sites must be avoided by all possible means including the management of psychosocial constraints. 展开更多
关键词 Occupational Injury building and Civil engineering CONSTRUCTION ENVIRONMENT
下载PDF
A Novel Motor Fault Diagnosis Method Based on Generative Adversarial Learning with Distribution Fusion of Discrete Working Conditions
6
作者 Qixin Lan Binqiang Chen Bin Yao 《Computer Modeling in Engineering & Sciences》 SCIE EI 2023年第8期2017-2037,共21页
Many kinds of electrical equipment are used in civil and building engineering.The motor is one of the main power components of this electrical equipment,which can provide stable power output.During the long-term use o... Many kinds of electrical equipment are used in civil and building engineering.The motor is one of the main power components of this electrical equipment,which can provide stable power output.During the long-term use of motors,various motor faults may occur,which affects the normal use of electrical equipment and even causes accidents.It is significant to apply fault diagnosis for the motors at the construction site.Aiming at the problem that signal data of faulty motor lack diversity,this research designs a multi-layer perceptron Wasserstein generative adversarial network,which is used to enhance training data through distribution fusion.A discrete wavelet decomposition algorithm is employed to extract the low-frequency wavelet coefficients from the original motor current signals.These are used to train themulti-layer perceptron Wasserstein generative adversarial model.Then,the trainedmodel is applied to generate fake current wavelet coefficients with the fused distribution.A motor fault classification model consisting of a feature extractor and pattern recognizer is built based on perceptron.The data augmentation experiment shows that the fake dataset has a larger distribution than the real dataset.The classification model trained on a real dataset,fake dataset and combined dataset achieves 21.5%,87.2%,and 90.1%prediction accuracy on the unseen real data,respectively.The results indicate that the proposed data augmentation method can effectively generate fake data with the fused distribution.The motor fault classification model trained on a fake dataset has better generalization performance than that trained on a real dataset. 展开更多
关键词 Motor fault diagnosis data augmentation wavelet decomposition generative adversarial network civil and building engineering
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部