期刊文献+
共找到855篇文章
< 1 2 43 >
每页显示 20 50 100
Optimization for performance-based design under seismic demands, including social costs 被引量:1
1
作者 Oscar Moller Ricardo O.Foschi +2 位作者 Juan P.Ascheri Marcelo Rubinstein Sergio Grossman 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2015年第2期315-328,共14页
Performance-based design in earthquake engineering is a structural optimization problem that has, as the objective, the determination of design parameters for the minimization of total costs, while at the same time sa... Performance-based design in earthquake engineering is a structural optimization problem that has, as the objective, the determination of design parameters for the minimization of total costs, while at the same time satisfying minimum reliability levels for the specifi ed performance criteria. Total costs include those for construction and structural damage repairs, those associated with non-structural components and the social costs of economic losses, injuries and fatalities. This paper presents a general framework to approach this problem, using a numerical optimization strategy and incorporating the use of neural networks for the evaluation of dynamic responses and the reliability levels achieved for a given set of design parameters. The strategy is applied to an example of a three-story offi ce building. The results show the importance of considering the social costs, and the optimum failure probabilities when minimum reliability constraints are not taken into account. 展开更多
关键词 earthquake engineering performance-based design OPTIMIZATION reliabiliy social costs
下载PDF
Application of Grey System Theory in Design For Cost (DFC) 被引量:2
2
作者 CHENXiao-chuan FANGMing-lun 《International Journal of Plant Engineering and Management》 2003年第3期163-170,共8页
Design For Cost (DFC) is a branch of Design For X (DFX). In this paper, wedefined DFC as a design method that analyzed and evaluated the product's life cycle cost (LCC), thenmodified the design to reduce the LCC. ... Design For Cost (DFC) is a branch of Design For X (DFX). In this paper, wedefined DFC as a design method that analyzed and evaluated the product's life cycle cost (LCC), thenmodified the design to reduce the LCC. Nowadays it is a very difficult thing to obtain LCC data inChina or in developing countries. Statistical methods can not be used because available LCC data arefew. In order to solve this problem, we used grey system theory. Then relations of cost factorswere analyzed in LCC using grey relevant methods, and a GM(1,1) model between design parameters andLCC was established. Using this model, we can estimate and control LCC by changing design parametersat the beginning of the design stage. 展开更多
关键词 grey system theory concurrent engineering design for cost (DFC) life cyclecost (LCC)
下载PDF
Improvement of the Life Cycle Costing Method in DesignStage Using KBIMS Library
3
作者 Chun-Kyong Lee 《Journal of Civil Engineering and Architecture》 2019年第12期780-792,共13页
With the advent of the fourth industrial revolution,the construction industry has undergone a paradigm shift.The smart construction technology market is expected to grow 12%annually in developed countries due to advan... With the advent of the fourth industrial revolution,the construction industry has undergone a paradigm shift.The smart construction technology market is expected to grow 12%annually in developed countries due to advanced technology investments.It is expected that businesses requiring highly sophisticated technology,for instance companies that need their old facilities upgraded,will become the main focus of the market.As building information modeling(BIM)design is becoming mandatory,such as in the Korea Public Procurement Service,researches regarding building automation,construction,and operation integration management systems based on BIM are conducted.In addition,for construction projects of over 10 billion won,design value engineering(Design VE)implementation,including life cycle cost(LCC)analysis,is mandatory at the design stage to improve quality and reduce the lifetime costs of buildings.In this study,we propose an improvement plan for LCC analysis at the design stage using the KBIMS library,which is an open BIM library developed by the Korean government and research groups.We analyze the existing LCC method,KBIMS library,and attribute information,and model the process that is applied in the LCC analysis system.This is expected to complement the LCC analysis system and improve work productivity. 展开更多
关键词 Life cycle costing building information modeling design value engineering automation design automation analysis.
下载PDF
Cost Prediction of a Turbofan Engine Using the Robust Partial Least Squares Method
4
作者 ZHANG Lei ZHOU Zhou 《International Journal of Plant Engineering and Management》 2010年第3期129-134,共6页
In recent years, the cost of engines has become increasingly important to engine manufacturers, who are consistently faced with major problems on how to reduce cost to a minimum. Cost has become a decisive factor for ... In recent years, the cost of engines has become increasingly important to engine manufacturers, who are consistently faced with major problems on how to reduce cost to a minimum. Cost has become a decisive factor for aircraft design. To control the continual rapid increased cost, engine cost prediction is indispensable early in the design phase. But the cost data of an aircraft engine is small; we introduce the Robust Partial Least Squares Method in solving this problem, and reducing or removing the effect of outlying data points, which is different from the Classical PLS. We use the MATLAB software doing several simulations; results and analysis of a real turbofan engine data set show the effectiveness and robustness of the Robust PLS method. The Robust PLS method can effectively be used to estimate Turbofan Engine cost with reasonable accuracy. 展开更多
关键词 cost prediction ROBUST PLS turbofan engine
下载PDF
Research on the Application of Neural Networks in Construction Engineering Cost
5
作者 Hu Xu 《Journal of Zhouyi Research》 2014年第2期86-89,共4页
关键词 BP神经网络 工程造价 应用 神经网络工具箱 预测模型 MATLAB 算法原理 案例分析
下载PDF
An estimation method for direct maintenance cost of aircraft components based on particle swarm optimization with immunity algorithm 被引量:3
6
作者 吴静敏 左洪福 陈勇 《Journal of Central South University》 SCIE EI CAS 2005年第S2期95-101,共7页
A particle swarm optimization (PSO) algorithm improved by immunity algorithm (IA) was presented. Memory and self-regulation mechanisms of IA were used to avoid PSO plunging into local optima. Vaccination and immune se... A particle swarm optimization (PSO) algorithm improved by immunity algorithm (IA) was presented. Memory and self-regulation mechanisms of IA were used to avoid PSO plunging into local optima. Vaccination and immune selection mechanisms were used to prevent the undulate phenomenon during the evolutionary process. The algorithm was introduced through an application in the direct maintenance cost (DMC) estimation of aircraft components. Experiments results show that the algorithm can compute simply and run quickly. It resolves the combinatorial optimization problem of component DMC estimation with simple and available parameters. And it has higher accuracy than individual methods, such as PLS, BP and v-SVM, and also has better performance than other combined methods, such as basic PSO and BP neural network. 展开更多
关键词 aircraft design maintenance cost PARTICLE SWARM optimization IMMUNITY algorithm PREDICT
下载PDF
液体火箭发动机可重复使用性设计技术分析
7
作者 刘士杰 王东 +2 位作者 田原 马晓秋 郑大勇 《火箭推进》 CAS 北大核心 2024年第1期67-77,共11页
为适应可重复使用液体火箭发动机设计研制的需要,以航天飞机、猎鹰9号火箭和X-37B的动力系统为对象,开展了可重复使用液体火箭发动机关键设计技术研究。文献调研与工程研制经验相结合,从运维体系建设、核心件功能设计、成本化设计与控... 为适应可重复使用液体火箭发动机设计研制的需要,以航天飞机、猎鹰9号火箭和X-37B的动力系统为对象,开展了可重复使用液体火箭发动机关键设计技术研究。文献调研与工程研制经验相结合,从运维体系建设、核心件功能设计、成本化设计与控制等方面,分析了发动机可重复使用性设计方法,提出了关键技术难题。研究结果表明:发动机的深度变推力技术、多次启动技术、喷管大角度调节技术,以及故障诊断与监测技术等,是火箭顺利回收的基本保障技术;液体火箭发动机有着显著的高、低温,强振动工况,极端环境材料性能数据建库技术、寿命设计与控制技术、全寿命周期运营体系设计技术等是迫切需要解决的关键技术难题;以发动机的性能、可靠性、维修性、安全性和保障性发展的发动机成本限额设计技术将会成为解决发动机可重复使用性的高新技术。 展开更多
关键词 液体火箭发动机 设计技术 重复使用性 全寿命周期 成本限额设计
下载PDF
大数据环境下基于BIM与CNN的电力工程造价优化算法
8
作者 王林峰 张文静 +2 位作者 刘云 陈志宾 王立功 《沈阳工业大学学报》 CAS 北大核心 2024年第1期7-12,共6页
针对大数据环境下电力工程造价在精准化、动态化等方面存在的不足,提出了一种基于BIM与CNN的电力工程造价优化算法。利用BIM技术的特点进行电力工程全生命周期的造价管理,实现了造价的动态化管控。并且采用Levenberg-Marquardt规则算法... 针对大数据环境下电力工程造价在精准化、动态化等方面存在的不足,提出了一种基于BIM与CNN的电力工程造价优化算法。利用BIM技术的特点进行电力工程全生命周期的造价管理,实现了造价的动态化管控。并且采用Levenberg-Marquardt规则算法改进卷积神经网络,通过改进后的CNN网络对每个工程环节的造价完成预测,从而优化整个工程的施工方案。结合相关的电力工程造价数据,基于Matlab对所提算法进行实验测试。结果表明,当学习率为0.010时CNN网络的性能最佳,所提算法的预测准确率为94%,并且与造价的真实值最为接近。 展开更多
关键词 电力工程造价 BIM技术 卷积神经网络 大数据环境 Levenberg-Marquardt规则算法 全生命周期 动态化管控 预测准确性
下载PDF
石化工程造价数据标准化组织与集成应用
9
作者 常乐 蒋炜 +2 位作者 刘学民 潘昌栋 李娜 《化工管理》 2024年第4期101-105,共5页
石化工程建设项目的复杂性和特殊性决定了其造价数据具有很高的复杂程度。文章通过分析石化工程造价数据积累面临的难点,立足石化工程建设项目管理和工程造价数据实际情况,以石化工程造价数据标准化组织与集成为研究主线,探索构建科学... 石化工程建设项目的复杂性和特殊性决定了其造价数据具有很高的复杂程度。文章通过分析石化工程造价数据积累面临的难点,立足石化工程建设项目管理和工程造价数据实际情况,以石化工程造价数据标准化组织与集成为研究主线,探索构建科学严密的工程造价闭环管理体系实施路径和方案,建立能够高效利用的动态化工程造价数据库,为挖掘石化工程造价大数据价值奠定基础。 展开更多
关键词 石化工程造价 造价数据库 数据标准化组织与集成 大数据应用
下载PDF
硬质岩基条件下沉箱码头的抛石棱体优化设计
10
作者 吕威 谭彬政 马勇 《水运工程》 2024年第3期69-73,共5页
对于硬质基岩条件下的重力式沉箱码头,通常在沉箱后方设置抛石棱体,用以减小沉箱宽度,从而缩减基槽开挖范围内的炸礁量。依托某海外工程,对棱体高度和工程造价的关系进行分析,探究抛石棱体的优化设计规律。结果表明,当抛石棱体高度约为... 对于硬质基岩条件下的重力式沉箱码头,通常在沉箱后方设置抛石棱体,用以减小沉箱宽度,从而缩减基槽开挖范围内的炸礁量。依托某海外工程,对棱体高度和工程造价的关系进行分析,探究抛石棱体的优化设计规律。结果表明,当抛石棱体高度约为沉箱高度的60%~80%时,工程造价最低;在硬质岩面低于沉箱高度的1/2时,抛石棱体的最优高度为沉箱高度的60%左右;在硬质岩面高出沉箱高度的1/2时,抛石棱体的最优高度为沉箱高度的80%左右。揭示的规律可供类似项目参考,实际工程中应综合考虑工程地质条件、地材价格、施工能力等多方面因素,分析确定经济合理的棱体高度。 展开更多
关键词 沉箱码头 硬质岩基 抛石棱体高度 工程造价 优化设计规律
下载PDF
基于应力水平的边坡加固设计方法研究
11
作者 王东英 杨光华 陆耀波 《广东水利水电》 2024年第1期67-75,共9页
当前边坡优化设计较多的依赖于工程经验,尚缺乏理论层面的设计依据和指导体系,为此,提出一种将应力水平分布和稳定性分析相结合,综合确定边坡加固位置和规模的设计方法,通过3个顺层路堑边坡工程实例阐述了该方法的应用方式和效果。所得... 当前边坡优化设计较多的依赖于工程经验,尚缺乏理论层面的设计依据和指导体系,为此,提出一种将应力水平分布和稳定性分析相结合,综合确定边坡加固位置和规模的设计方法,通过3个顺层路堑边坡工程实例阐述了该方法的应用方式和效果。所得结论主要有:①基于应力水平确定加固位置、稳定性分析确定加固规模,这种综合性方法通常能得到较优的加固设计方案,既可为边坡的初步设计提供理论指导,也可为经验优化方案的校验提供理论依据;②对于顺层岩质边坡,在岩层分界面处应力水平往往较高,若开挖后岩层分界面有出露,采用锚索穿过岩层分界面提高坡体稳定性具有较好的效果;③“剥山皮”式开挖对稳定性帮助不大,对于此类边坡采用较陡的坡率挖除加固更有效。 展开更多
关键词 路堑边坡 加固设计 工程经验 应力水平 经济有效
下载PDF
基于云计算的全生命周期建筑工程设计阶段造价管理研究 被引量:1
12
作者 于涵 《中国建设信息化》 2024年第2期60-63,共4页
针对某厂房建筑工程的造价管理现状及问题进行分析,结合云计算技术提出全生命周期建筑工程造价管理平台。结果表明,全生命周期造价管理下,总造价偏差波动范围较小,在运营阶段总造价偏差接近0。传统成本管理方法下,当设计阶段进度达到50%... 针对某厂房建筑工程的造价管理现状及问题进行分析,结合云计算技术提出全生命周期建筑工程造价管理平台。结果表明,全生命周期造价管理下,总造价偏差波动范围较小,在运营阶段总造价偏差接近0。传统成本管理方法下,当设计阶段进度达到50%时,设计阶段造价偏差最大为0.06%;在设计阶段结束时的设计阶段造价偏差为0.04%。全生命周期造价管理方法下,设计阶段造价偏差接近0。研究表明,全生命周期建筑工程造价管理对策能够有效控制设计阶段的造价成本。 展开更多
关键词 建筑工程 全生命周期 设计阶段 造价管理 云计算
下载PDF
基于PCA-BP神经网络的既有建筑改造成本预测
13
作者 赵伟佳 罗德才 +1 位作者 陈方 陈倩 《土木工程与管理学报》 2024年第2期89-97,共9页
既有建筑由于建造过程信息的缺失、损毁,缺乏造价定额资料等成本估算标准数据,导致决策阶段很难快速准确地计算出改造工程造价。针对该问题,提出了基于主成分分析(PCA)和BP神经网络的既有建筑改造成本预测的方法。通过案例与文献分析,... 既有建筑由于建造过程信息的缺失、损毁,缺乏造价定额资料等成本估算标准数据,导致决策阶段很难快速准确地计算出改造工程造价。针对该问题,提出了基于主成分分析(PCA)和BP神经网络的既有建筑改造成本预测的方法。通过案例与文献分析,识别并提炼出影响既有建筑改造成本的10个影响因子。利用主成分分析方法,对提取的10个因子进行降维,归纳出3个新的综合变量。采用BP神经网络对280个既有建筑改造成本进行分组训练、验证与测试。结果显示,PCA-BP神经网络模型基于降维且消除指标之间相关性数据为基础,提高了预测效率,方根误差、相关度均取得了较好的结果,实测数据与预测数据之间的综合误差为2.66%,为既有建筑改造工程造价快速测算提供了一种新方法。 展开更多
关键词 既有建筑 PCA BP 工程造价 预测
下载PDF
杭州交通建设工程造价管理平台搭建探究
14
作者 胡俊 胡歆竹 陈锡锋 《城市道桥与防洪》 2024年第3期262-265,M0021,共5页
为满足杭州市交通建设工程对材料价格在概预算、结算、决算方面的需求,搭建杭州交通工程“价管云”平台以实现杭州交通工程全过程造价管理。在完善价格调查过程中,提高指导价准确性,实现交通工程成本控制,保证交通工程顺利实施等方面提... 为满足杭州市交通建设工程对材料价格在概预算、结算、决算方面的需求,搭建杭州交通工程“价管云”平台以实现杭州交通工程全过程造价管理。在完善价格调查过程中,提高指导价准确性,实现交通工程成本控制,保证交通工程顺利实施等方面提高交通工程造价管理效率。 展开更多
关键词 交通工程 价格调查 预测模型 造价平台
下载PDF
化工工程设计阶段造价控制方法
15
作者 付然 《工程建设与设计》 2024年第2期243-245,共3页
针对化工工程设计阶段造价控制存在的问题,重点分析化工工程设计阶段造价控制的方法,概述化工工程设计阶段具体情况以后,明确控制的要点,并提出了实现设计阶段造价有效控制的建议,包括推行设计招标、处理好各种原因的工程设计变更、借... 针对化工工程设计阶段造价控制存在的问题,重点分析化工工程设计阶段造价控制的方法,概述化工工程设计阶段具体情况以后,明确控制的要点,并提出了实现设计阶段造价有效控制的建议,包括推行设计招标、处理好各种原因的工程设计变更、借助价值工程法展开设计方案对比与分析、积极推行限额设计、实行设计质量奖罚制度等。 展开更多
关键词 化工工程 设计阶段 造价 控制方法
下载PDF
工程设计对海上油气工程项目成本的影响
16
作者 吕岩 《化工管理》 2024年第4期25-30,共6页
工程设计是海上油气田工程建设项目实施过程中的关键环节,设计工作的优劣直接决定了项目执行阶段投入成本费用的高低,探讨设计工作对工程项目成本的影响具有重要的意义。文章从详细设计、工艺设计及标准化设计对海上油气工程项目成本的... 工程设计是海上油气田工程建设项目实施过程中的关键环节,设计工作的优劣直接决定了项目执行阶段投入成本费用的高低,探讨设计工作对工程项目成本的影响具有重要的意义。文章从详细设计、工艺设计及标准化设计对海上油气工程项目成本的影响进行了分析,为如何从设计入手、优化工程项目的总成本提供了参考建议。 展开更多
关键词 海上油气工程 设计 标准化 项目成本
下载PDF
基于灰色模型的工程造价指数组合预测模型构建
17
作者 李昌建 于海波 《现代科学仪器》 2024年第1期176-181,共6页
随着大数据及人工智能的发展,构建合理的工程造价指数是工程造价发展的必然趋势。研究基于灰色预测模型和梯度提升决策树(Gradient Boosted Decision Tree,GBDT)预测模型,结合Stacking策略进行模型的组合,得到GM-GBDT工程造价指数组合... 随着大数据及人工智能的发展,构建合理的工程造价指数是工程造价发展的必然趋势。研究基于灰色预测模型和梯度提升决策树(Gradient Boosted Decision Tree,GBDT)预测模型,结合Stacking策略进行模型的组合,得到GM-GBDT工程造价指数组合预测模型。对模型的性能进行分析,发现三种模型中预测性能从高到低依次是GM-GBDT集成预测模型、GBDT预测模型、GM(1,N)预测模型,GM-GBDT集成预测模型对2020年1-12月工程造价指数的真实值和预测值的相对误差为3.86%-1.05%,平均相对误差为2.60%。实证分析结果表明,GM-GBDT联合模型,具有更好的整体预测能力,能够在GM(1,N)和GM的基础上,进一步提升预测准确率。 展开更多
关键词 灰色模型 工程造价指数 组合预测 GM-GBDT 集成预测
下载PDF
施工组织优化设计对工程造价影响的研究
18
作者 罗海南 《价值工程》 2024年第17期47-49,共3页
本文以自贸试验区万顷沙保税港加工制造业区块综合开发项目安置区WQS-5标段的9号楼为例,深入研究了施工计划、网络图制作、预算费用计算等关键环节,并针对这些环节进行了优化设计。研究结果表明,合理的施工组织优化设计能够有效降低工... 本文以自贸试验区万顷沙保税港加工制造业区块综合开发项目安置区WQS-5标段的9号楼为例,深入研究了施工计划、网络图制作、预算费用计算等关键环节,并针对这些环节进行了优化设计。研究结果表明,合理的施工组织优化设计能够有效降低工程造价,提高项目的经济效益。同时,本文还强调了优化过程中对关键线路的关注以及直接费用和间接费用的动态平衡。研究结论对于项目管理人员在进行施工组织优化设计时具有重要的参考价值,有助于提高项目管理的科学性和有效性。 展开更多
关键词 施工组织设计 工程造价 费用优化 工作优化
下载PDF
公路施工组织设计对工程造价的影响
19
作者 吴俊岑 《工程技术研究》 2024年第8期146-148,共3页
公路施工组织设计文件包括施工平面布置、施工方案、施工进度计划等内容。为提高公路工程的可控性,文章首先总结了公路施工组织设计的原则和流程,从施工道路、临时设施、站场等方面分析了施工平面布置对工程造价的影响,随后从施工方法... 公路施工组织设计文件包括施工平面布置、施工方案、施工进度计划等内容。为提高公路工程的可控性,文章首先总结了公路施工组织设计的原则和流程,从施工道路、临时设施、站场等方面分析了施工平面布置对工程造价的影响,随后从施工方法、材料和机具、施工顺序等方面分析了施工方案对工程造价的影响,最后基于成本曲线分析了施工进度计划对工程造价的影响,研究成果可为公路工程施工及造价控制提供借鉴。 展开更多
关键词 公路工程 施工组织设计 工程造价 影响规律
下载PDF
结合建筑工程结构设计的工程造价应用分析
20
作者 祝海红 《北方建筑》 2024年第1期122-126,共5页
在工程建设项目前期关键的结构设计阶段,造价预测是衡量项目可行性的重要参考,为给项目决策者提供评估依据,结合建筑工程结构设计的工程造价应用进行分析。选取工程结构设计阶段造价影响指标,确立一套可以反映建筑工程结构特点的指标体... 在工程建设项目前期关键的结构设计阶段,造价预测是衡量项目可行性的重要参考,为给项目决策者提供评估依据,结合建筑工程结构设计的工程造价应用进行分析。选取工程结构设计阶段造价影响指标,确立一套可以反映建筑工程结构特点的指标体系,挖掘并预处理建筑工程结构设计数据,将其作为模型输入,并基于BP神经网络构建工程造价预测模型。实例应用结果表明,本文设计的工程造价预测模型的均方根误差为10^(-4)、平均相对误差为1.82%,验证了该模型在建筑工程结构设计阶段的工程造价预测中具有良好的应用效果。 展开更多
关键词 建筑工程 结构设计 工程造价 应用分析 成本控制
下载PDF
上一页 1 2 43 下一页 到第
使用帮助 返回顶部